Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPensana Regulatory News (PRE)

Share Price Information for Pensana (PRE)

Share Price is delayed by 15 minutes
Get Live Data
87.10    0.80 (0.93%)
Bid:
87.10
Ask:
88.10
Spread: 1.00 (1.148%)
Market Cap: £307.91m
PRE Live PriceLast checked at - London Stock Exchange

Intraday Pensana Share Chart

Completion of Seismic Program

12 Aug 2008 07:00

RNS Number : 1093B
Pan Andean Resources PLC
12 August 2008
 



Successful Completion of Critical 2D Seismic Programme on Antorcha BlockColombia

Highlights:

A focused 60km 2D seismic programme and processing has been completed on time on Pan Andean's 100% owned Antorcha block in Colombia

A further 70km of prior 2D seismic has been re-processed and integrated into the analysis

The data is being interpreted and drill sites are being identified

Application for multiple drilling permits under way

Pan Andean (AIM:PRE), the AIM-listed oil & gas producer, is pleased to announce the successful completion of a critical new 2D seismic survey in the Antorcha Block. The block licence is located in the prolific Middle Magdalena Basin of central Colombia. The licence was signed in November 2007, after which Pan Andean accelerated an exploration programme to confirm the block's prospectivity.

Additional seismic covering 70km has been reprocessed. Regional studies and surface geological work are also complete and have been integrated with the newly acquired data.

Pan Andean's team is working to identify the optimal locations for drilling and acquiring necessary drilling permits. 

The Antorcha block neighbours an existing oil producing area, operated by the state petroleum company Ecopetrol, and is also adjacent to areas being explored or in production with several international operators.

The Antorcha block is located up-dip of existing oil producing fields: the Velasquez-Palagua field with more than 300 million barrels of oil reserves and the Teca-Cocorna-Nare-Jazmin heavy oil field with more than 1,000 million barrels of oil in place. 

Preliminary geological and petrophysical studies and the most recent data acquisition suggest potential for moveable heavy oil at shallow depths of less than 2,000 feet.

Between 1 and 2 billion barrels of oil in place could exist on the block, of which 100 to 300 million barrels may be recoverable reserves, using parameters of nearby fields: i.e. porosity 20 - 25%, oil saturation 60%, average net oil thickness of 100 - 200 feet, recovery factor of 10 - 15%. Expected crude quality could be in the range of 10° to 20° API, well within the economic processing capabilities of existing fiscal terms, technology and anticipated oil price.

Subject to confirmation of drillable targets and well rig availability, a limited drilling programme will be undertaken in 2009.

David Horgan, Managing Director of Pan Andean Resources, commented:

"This is a key step in Pan Andean's development. With the seismic and regional studies now complete, we can concentrate on drilling and finding quality partners.   Pan Andean has already been approached by major oil players.

This activity will illustrate what we believe to be the huge value locked in Antorcha. Obviously we hope that drilling will confirm the presence of commercially viable hydrocarbons. Farming out to a financially and technically strong partner will allow us to again demonstrate both the value in the block, and our desire to monetise the asset to the best advantage of our shareholders.

We have long been impressed at the excellent fiscal terms available in Colombia, and good security in the Antorcha region. There are no community or environmental issues in what is a long established hydrocarbon producing area. Recent high profile transactions, as well as the 2008 Colombian Heavy Oil Round in which many majors took significant positions, confirm the potential and value being attributed to exploration and heavy oil opportunities in Colombia."

This announcement has been approved by Ivan Sandrea, Director, Pan Andean. Mr. Sandrea has more than 10 years of international E&P experience.

Contacts:

Pan Andean

David Horgan, Managing Director 

+ 353 87 292 3500

John Teeling, Chairman

+ 353 1 833 2833

College Hill

Paddy Blewer

+44 (0)20 7457 2020

Nick Elwes

Blue Oar Securities Plc

John Wakefield

+44 (0)117 933 0020

Simon Moynagh

www.panandeanresources.com

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCUARBRWORWAAR
Date   Source Headline
30th May 20257:00 amPRNGBP 2 million Placement to major institutional shareholders
21st May 20258:58 amPRNSale of shares for director loan advance to the Company
19th May 20257:00 amPRNMain Construction Commences at Longonjo
15th May 20257:00 amPRNDrawdown of first USD 25 million of mine finance
13th May 202512:32 pmPRNDirector/PDMR Shareholding
2nd May 20251:20 pmPRNDirector/PDMR Shareholding
2nd Apr 20257:00 amPRNEPCM and Updated Ore Reserve estimate
24th Mar 20259:24 amPRNDirector/PDMR Shareholding
21st Mar 20257:00 amPRNUnaudited Interim results for the six months ended 31 December 2024
18th Mar 20257:00 amPRNUpdate on Longonjo Finance
26th Feb 202510:58 amPRNDirector/PDMR Shareholding
25th Feb 20252:14 pmPRNIssue of Equity
24th Feb 20253:04 pmPRNDirector/PDMR Shareholding
24th Jan 202510:36 amPRNDirector/PDMR Shareholding
23rd Jan 20257:00 amPRNUpdate on Longonjo Finance
20th Dec 20243:56 pmPRNDirector/PDMR Shareholding
20th Dec 20243:56 pmPRNDirector/PDMR Shareholding
20th Dec 20243:53 pmPRNDirector/PDMR Shareholding
5th Dec 20241:16 pmPRNAnnual General Meeting - Chairmans Presentation
5th Dec 20241:14 pmPRNResults of Annual General Meeting - 5 December 2024
5th Nov 20242:39 pmPRNDirector/PDMR Shareholding
30th Oct 202411:22 amPRNPublication of Annual Report 2024 and Notice of Annual General Meeting
25th Sep 202410:48 amPRNTechnical Assistance Grant from the US International Development Finance Corporation and Reduction of Board Size
24th Sep 20247:34 amPRNTechnical Assistance Grant from the US International Development Finance Corporation and Reduction of Board Size
9th Sep 20247:00 amPRNOfftake and Co-operation Agreement with Hanwa
31st Jul 20243:46 pmPRNDirector/PDMR Shareholding
30th Jul 20247:00 amPRNPensana awarded Sustainability Gold by EcoVadis
24th Jul 202412:47 pmPRNDirector/PDMR Shareholding
23rd Jul 20247:00 amPRNUpdate on GBP 2 million directors loan facility, Issue of Equity and Director Dealings
14th May 20247:00 amPRNEncouraging Sulima West Beneficiation Test Work Results
19th Apr 20247:00 amPRNUpdate on FSDEA US$15 million loan facility
15th Apr 202410:38 amPRNDirectors Dealings
12th Apr 20244:35 pmPRNHolding(s) in Company
8th Apr 20247:02 amPRNGrant of Share Awards
8th Apr 20247:01 amPRNIssue of Equity
8th Apr 20247:00 amPRNDirectors Dealings
4th Apr 202410:30 amPRNCorrection: Coola Project: Encouraging Sulima West Results
4th Apr 20247:00 amPRNCoola Project: Encouraging Sulima West Results
28th Mar 20241:28 pmPRNUnaudited Interim results for the six months ended 31 December 2023
11th Mar 20247:00 amPRNUpdate on Coola and Sulima West Exploration Programmes
4th Mar 20247:00 amPRNLongonjo Project Update
26th Feb 20247:00 amPRNLongonjo Project Debt Finance
5th Feb 20247:00 amPRNLongonjo mixed rare earth carbonate product quality approval
24th Jan 20247:00 amPRNTechnical Due Diligence Report on Longonjo
15th Jan 20249:09 amPRNFSDEA reviews Longonjo construction progress
15th Jan 20247:00 amPRNFSDEA Board Visit
3rd Jan 20247:00 amPRNLongonjo Update
8th Dec 20232:56 pmPRNReport on Payments to Governments for FY 2023
1st Dec 20232:00 pmPRNAGM - Chairman's Presentation
1st Dec 20231:59 pmPRNResult of AGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.