Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPensana Regulatory News (PRE)

Share Price Information for Pensana (PRE)

Share Price is delayed by 15 minutes
Get Live Data
90.60    -4.70 (-4.93%)
Bid:
88.90
Ask:
90.90
Spread: 2.00 (2.25%)
Market Cap: £320.28m
PRE Live PriceLast checked at - London Stock Exchange

Intraday Pensana Share Chart

Completion of Seismic Program

12 Aug 2008 07:00

RNS Number : 1093B
Pan Andean Resources PLC
12 August 2008
 



Successful Completion of Critical 2D Seismic Programme on Antorcha BlockColombia

Highlights:

A focused 60km 2D seismic programme and processing has been completed on time on Pan Andean's 100% owned Antorcha block in Colombia

A further 70km of prior 2D seismic has been re-processed and integrated into the analysis

The data is being interpreted and drill sites are being identified

Application for multiple drilling permits under way

Pan Andean (AIM:PRE), the AIM-listed oil & gas producer, is pleased to announce the successful completion of a critical new 2D seismic survey in the Antorcha Block. The block licence is located in the prolific Middle Magdalena Basin of central Colombia. The licence was signed in November 2007, after which Pan Andean accelerated an exploration programme to confirm the block's prospectivity.

Additional seismic covering 70km has been reprocessed. Regional studies and surface geological work are also complete and have been integrated with the newly acquired data.

Pan Andean's team is working to identify the optimal locations for drilling and acquiring necessary drilling permits. 

The Antorcha block neighbours an existing oil producing area, operated by the state petroleum company Ecopetrol, and is also adjacent to areas being explored or in production with several international operators.

The Antorcha block is located up-dip of existing oil producing fields: the Velasquez-Palagua field with more than 300 million barrels of oil reserves and the Teca-Cocorna-Nare-Jazmin heavy oil field with more than 1,000 million barrels of oil in place. 

Preliminary geological and petrophysical studies and the most recent data acquisition suggest potential for moveable heavy oil at shallow depths of less than 2,000 feet.

Between 1 and 2 billion barrels of oil in place could exist on the block, of which 100 to 300 million barrels may be recoverable reserves, using parameters of nearby fields: i.e. porosity 20 - 25%, oil saturation 60%, average net oil thickness of 100 - 200 feet, recovery factor of 10 - 15%. Expected crude quality could be in the range of 10° to 20° API, well within the economic processing capabilities of existing fiscal terms, technology and anticipated oil price.

Subject to confirmation of drillable targets and well rig availability, a limited drilling programme will be undertaken in 2009.

David Horgan, Managing Director of Pan Andean Resources, commented:

"This is a key step in Pan Andean's development. With the seismic and regional studies now complete, we can concentrate on drilling and finding quality partners.   Pan Andean has already been approached by major oil players.

This activity will illustrate what we believe to be the huge value locked in Antorcha. Obviously we hope that drilling will confirm the presence of commercially viable hydrocarbons. Farming out to a financially and technically strong partner will allow us to again demonstrate both the value in the block, and our desire to monetise the asset to the best advantage of our shareholders.

We have long been impressed at the excellent fiscal terms available in Colombia, and good security in the Antorcha region. There are no community or environmental issues in what is a long established hydrocarbon producing area. Recent high profile transactions, as well as the 2008 Colombian Heavy Oil Round in which many majors took significant positions, confirm the potential and value being attributed to exploration and heavy oil opportunities in Colombia."

This announcement has been approved by Ivan Sandrea, Director, Pan Andean. Mr. Sandrea has more than 10 years of international E&P experience.

Contacts:

Pan Andean

David Horgan, Managing Director 

+ 353 87 292 3500

John Teeling, Chairman

+ 353 1 833 2833

College Hill

Paddy Blewer

+44 (0)20 7457 2020

Nick Elwes

Blue Oar Securities Plc

John Wakefield

+44 (0)117 933 0020

Simon Moynagh

www.panandeanresources.com

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCUARBRWORWAAR
Date   Source Headline
28th Apr 20264:59 pmPRNHolding(s) in Company
17th Apr 20267:00 amPRNUS$165 million Strategic Investment to support U.S. Mine to Magnet strategy
9th Mar 202611:20 amPRNAdjournment of General Meeting and Corporate Presentation
4th Mar 20267:28 amPRNIncreased US$165 million Strategic Investment to support U.S. Mine to Magnet strategy - Proposed adjournment of General Meeting
3rd Mar 20267:00 amPRNConstruction on track for 2027 first production
10th Feb 20263:10 pmPRNUS$ 160 million Strategic Equity Investment
4th Feb 20267:00 amPRNUpdate on US$25 million Longonjo mine finance
21st Jan 202612:28 pmPRNIssue of Equity
21st Jan 20267:04 amPRNUpdate on Longonjo infill and resource expansion drill programme
14th Jan 202612:28 pmPRNDirectors Dealings
14th Jan 20267:00 amPRNLongonjo Main Construction well underway
23rd Dec 20252:09 pmRNSHolding(s) in Company
23rd Dec 20252:09 pmPRNHolding(s) in Company
19th Dec 202511:08 amRNSIssue of Equity - Updated Admission Date and number of shares to be issued
19th Dec 202511:08 amPRNIssue of Equity - Updated Admission Date and number of shares to be issued
18th Dec 20251:46 pmRNSIssue of Equity
18th Dec 20251:46 pmPRNIssue of Equity
18th Dec 20251:01 pmRNSIssue of Equity
18th Dec 20251:01 pmPRNIssue of Equity
18th Dec 20257:00 amPRNMajor shareholder support for US Strategy
16th Dec 202510:00 amPRNIssue of Equity
15th Dec 20253:15 pmPRNIssue of Equity/Total Voting Rights
9th Dec 20257:00 amPRNUS$100 million Strategic Equity Investment
3rd Dec 202512:08 pmPRNAnnual General Meeting - Chairman's Presentation
3rd Dec 202511:57 amPRNResult of AGM
27th Nov 20257:00 amPRNLongonjo study lifts HREE production fivefold
17th Nov 20257:00 amPRNMajor drill programme to increase Longonjo resource to over one billion tonnes
10th Nov 20257:00 amPRNNotice of Annual General Meeting and Form of Proxy
31st Oct 20258:43 amPRNNew Corporate Presentation
28th Oct 20257:00 amPRNU.S. EXIM debt funding to accelerate U.S. mine-to-magnet supply chain
22nd Oct 20257:00 amPRNPartnership with Vacuumschmelze GmbH to establish mine-to-magnet supply chain in the US
15th Oct 20259:00 amPRNPublication of Annual Report 2025 and Notice of Annual General Meeting
9th Oct 20251:21 pmPRNIssue of Equity
30th Sep 20257:00 amPRNDate of Annual General Meeting and proposed share consolidation
26th Sep 20254:34 pmPRNHolding(s) in Company
25th Sep 20259:15 amPRNNew Corporate Presentation
9th Sep 20257:00 amPRNAppointment of Chief Operating Officer
5th Sep 202511:04 amPRNIssue of Equity
3rd Sep 20254:57 pmPRNHolding(s) in Company
11th Aug 20257:00 amPRNAppointment of US advisor Stonegate Capital Partners
28th Jul 20257:00 amPRNLongonjo construction budget on track and Coola carbonatite drilling
23rd Jun 20257:00 amPRNMOU with ReElement Technologies to develop a sustainable rare earth supply chain
18th Jun 202511:22 amPRNIssue of Equity
18th Jun 20259:17 amPRNHolding(s) in Company
16th Jun 20257:00 amPRNMOU with Toyota Tsusho Corporation for Rare Earth Offtake
13th Jun 20259:59 amPRNHolding(s) in Company
10th Jun 202512:21 pmPRNGrant of Share Awards
10th Jun 202512:19 pmPRNIssue of Equity/Total Voting Rights
5th Jun 202511:10 amPRNIssue of Equity
30th May 20257:00 amPRNGBP 2 million Placement to major institutional shareholders

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.