Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPowerhouse Ener Regulatory News (PHE)

Share Price Information for Powerhouse Ener (PHE)

Share Price is delayed by 15 minutes
Get Live Data
0.205    0.00 (0.00%)
Bid:
0.20
Ask:
0.21
Spread: 0.01 (5.00%)
Market Cap: £10.50m
PHE Live PriceLast checked at - London Stock Exchange

Intraday Powerhouse Ener Share Chart

Update on Munich facility

4 Dec 2014 10:57

RNS Number : 8451Y
Powerhouse Energy Group PLC
04 December 2014
 



4 December 2014

 

PowerHouse Energy Group plc

("PowerHouse" or the "Company")

 

Update on Munich facility and proposed deployment of test units

 

PowerHouse (AIM: PHE) provides the following update in relation to its facility in Munich and the proposed deployment of test units.

PowerHouse has commenced the second phase of re-engineering to move its 25 tonne per day unit located in Eiting, Germany, near to Munich Airport. It is anticipated that as a result of the modular design of the unit, this second phase, incorporating dismantling and relocation of the existing unit, should be completed by the end of December 2014. During the process of reengineering and commercialisation, the facility is being relocated approximately 500 meters from its current location and moved to what will be its long-term location at the waste transfer station operated by Wurzer Umwelt. PowerHouse anticipates that it will be able to demonstrate un-interrupted commercial operation of the Munich facility by the end of March 2015.

 

The directors of the Company believe that the model of co-location of its facilities at industry leading, modern transfer stations operated by partners such as Wurzer Umwelt represents a significant opportunity for PowerHouse. Wurzer Umwelt has worked with Powerhouse in the formative stages of developing the PowerHouse Ultra High Temperature Gasification ("UHTG") technology and sees the value proposition of the Company's technology for the future.

 

PowerHouse is also pleased to announce that as part of the overall strategy of commercialising the Company's technology, and reflecting the high demand for evaluation of the synthesis gas generated by the UHTG process, three test units (with a nominal capacity of up to three tonnes per day) have been commissioned for deployment in Asia, Europe, and the United States. The first of these units will be demonstrated in Brisbane, Australia, in January of 2015, with the others being delivered during the first half of 2015.

 

The objective of deploying these test units is to provide a mobile, fully functional, containerised unit, capable of generating electricity through the use of the UHTG derived syngas. The Company believes that the ability to ship the demonstration unit to prospective customer sites for on-site testing of the actual feedstock that will be used for commercial operations is likely to be of significant benefit to PowerHouse in its discussions with potential customers. Requests for on-site testing have already been received from potential customers in the UK, mainland Europe and South East Asia (including significant interest in Australia.)

 

Keith Allaun, Executive Chairman of Powerhouse, stated "We are pleased with the progress the Company has made with the ongoing move of the Eiting facility. In addition, we believe that the three test units will be of significant benefit to the Company in demonstrating the commercial benefits of the PowerHouse Waste-to-Energy solution."

 

For additional information please contact:

 

PowerHouse Energy Group plc

Keith Allaun +44 (0) 20 7079 4407

 

Allenby Capital Limited (Nominated Adviser and Broker)

Nick Harriss/David Hart +44 (0) 20 3328 5656

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCBZLFBZLFEFBZ
Date   Source Headline
18th Apr 201812:10 pmPRNEquity Placings
17th Apr 20187:00 amPRNDistribution Agreement
13th Apr 20187:00 amRNSProject Development Partner : Commercial Update
10th Apr 20187:00 amRNSAppointment of Commercial Operations Manager
20th Mar 20182:05 pmRNSSecond Price Monitoring Extn
20th Mar 20182:00 pmRNSPrice Monitoring Extension
7th Mar 20187:00 amPRNShare Options Grants to Directors
2nd Mar 20187:00 amPRNProgress Update
27th Feb 20187:00 amPRNDirector/PDMR Shareholding
23rd Feb 20182:12 pmPRNDirector/PDMR Shareholding
20th Feb 20187:00 amPRNMemorandum of Understanding
12th Feb 20187:00 amPRNCorrection - Updated Corporate Presentation
9th Feb 20187:00 amPRNUpdated Corporate Presentation
6th Feb 201811:25 amPRNHolding(s) in Company
31st Jan 20183:56 pmPRNIssue of Equity
9th Jan 20187:00 amPRNFull Year Business Update
18th Dec 20177:00 amPRNHeads of Terms agreed for commercial DMG site
22nd Nov 20177:00 amPRNCompletion of Pre-FEED of Commercial DMG© System
23rd Oct 20177:00 amPRNProgress on advance towards hydrogen purification
20th Oct 20177:00 amRNSSuccessful demonstration of G3-UHT system
27th Sep 20177:00 amPRNInterim Results
26th Sep 201710:14 amRNSOpen days and technology demonstrations
25th Sep 20175:08 pmPRNHolding(s) in Company
20th Sep 20177:00 amPRNMOU for waste-to-hydrogen facilities in state of Qatar
31st Aug 20172:00 pmPRNIssue of Equity
24th Aug 20177:00 amPRNAppointment of Chairman and Completion of Fundraise
21st Aug 20177:00 amPRNExtended Trial Produces Over 50% hydrogen Syngas
9th Aug 20177:00 amPRNG3-UHt Demonstration Update
31st Jul 20177:00 amPRNSuccessful Production of Syngas
27th Jul 20171:06 pmRNSResult of AGM
27th Jul 20177:00 amRNSInitiation of Coverage by Align Research
17th Jul 20176:25 pmPRNNotification of Major Interest in Shares
10th Jul 20177:00 amRNSPowerHouse engagement via Vox Markets
6th Jul 20177:00 amRNSProactive Investors Broadcast
23rd Jun 20177:00 amRNSInvestor Event
21st Jun 20173:22 pmPRNIssue of Equity
16th Jun 20177:00 amPRNAnnual Financial Report
5th Jun 20177:00 amPRNCollaboration Agreement of up to £500,000
26th May 20172:48 pmPRNNotification of Major Holdings
26th May 20177:00 amPRNNew Advisory Panel Appointment
22nd May 20173:02 pmPRNDirectorate Change
22nd May 20177:24 amPRNNew Advisory Panel
4th May 20177:00 amPRNSiting of G3-UHT Unit
21st Apr 20177:00 amPRNSuccessful re-commissioning of G3-UHt unit
31st Mar 20177:00 amRNSInvestor Event
28th Mar 20177:00 amPRNAppointment of CFO and Corporate Presentation
27th Mar 20171:10 pmRNSUK Investor Show 1 April 2017
24th Mar 20177:00 amPRNUpdate on G3-UHt Gasification System
20th Mar 20177:00 amPRNRe Directorate
15th Mar 20177:00 amPRNIssue of Equity and General Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.