Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPowerhouse Ener Regulatory News (PHE)

Share Price Information for Powerhouse Ener (PHE)

Share Price is delayed by 15 minutes
Get Live Data
0.225    0.00 (0.00%)
Bid:
0.22
Ask:
0.23
Spread: 0.01 (4.545%)
Market Cap: £11.52m
PHE Live PriceLast checked at - London Stock Exchange

Intraday Powerhouse Ener Share Chart

Update on Munich facility

4 Dec 2014 10:57

RNS Number : 8451Y
Powerhouse Energy Group PLC
04 December 2014
 



4 December 2014

 

PowerHouse Energy Group plc

("PowerHouse" or the "Company")

 

Update on Munich facility and proposed deployment of test units

 

PowerHouse (AIM: PHE) provides the following update in relation to its facility in Munich and the proposed deployment of test units.

PowerHouse has commenced the second phase of re-engineering to move its 25 tonne per day unit located in Eiting, Germany, near to Munich Airport. It is anticipated that as a result of the modular design of the unit, this second phase, incorporating dismantling and relocation of the existing unit, should be completed by the end of December 2014. During the process of reengineering and commercialisation, the facility is being relocated approximately 500 meters from its current location and moved to what will be its long-term location at the waste transfer station operated by Wurzer Umwelt. PowerHouse anticipates that it will be able to demonstrate un-interrupted commercial operation of the Munich facility by the end of March 2015.

 

The directors of the Company believe that the model of co-location of its facilities at industry leading, modern transfer stations operated by partners such as Wurzer Umwelt represents a significant opportunity for PowerHouse. Wurzer Umwelt has worked with Powerhouse in the formative stages of developing the PowerHouse Ultra High Temperature Gasification ("UHTG") technology and sees the value proposition of the Company's technology for the future.

 

PowerHouse is also pleased to announce that as part of the overall strategy of commercialising the Company's technology, and reflecting the high demand for evaluation of the synthesis gas generated by the UHTG process, three test units (with a nominal capacity of up to three tonnes per day) have been commissioned for deployment in Asia, Europe, and the United States. The first of these units will be demonstrated in Brisbane, Australia, in January of 2015, with the others being delivered during the first half of 2015.

 

The objective of deploying these test units is to provide a mobile, fully functional, containerised unit, capable of generating electricity through the use of the UHTG derived syngas. The Company believes that the ability to ship the demonstration unit to prospective customer sites for on-site testing of the actual feedstock that will be used for commercial operations is likely to be of significant benefit to PowerHouse in its discussions with potential customers. Requests for on-site testing have already been received from potential customers in the UK, mainland Europe and South East Asia (including significant interest in Australia.)

 

Keith Allaun, Executive Chairman of Powerhouse, stated "We are pleased with the progress the Company has made with the ongoing move of the Eiting facility. In addition, we believe that the three test units will be of significant benefit to the Company in demonstrating the commercial benefits of the PowerHouse Waste-to-Energy solution."

 

For additional information please contact:

 

PowerHouse Energy Group plc

Keith Allaun +44 (0) 20 7079 4407

 

Allenby Capital Limited (Nominated Adviser and Broker)

Nick Harriss/David Hart +44 (0) 20 3328 5656

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCBZLFBZLFEFBZ
Date   Source Headline
6th Mar 20177:16 amPRNAFC Fuel Cell Order
24th Feb 20177:00 amPRNSiting of G3-UHt Demonstration Unit
21st Feb 20177:00 amPRNAppointment of non-executive director
15th Feb 20178:07 amPRNPlacing, Loan Note Conversion and Repayment
14th Feb 20174:40 pmRNSSecond Price Monitoring Extn
14th Feb 20174:35 pmRNSPrice Monitoring Extension
6th Feb 20177:00 amPRNMOU with Peel Environmental
30th Jan 20177:00 amPRNIssue of Equity
26th Jan 20177:00 amPRNPHE G3-UHt Update
19th Jan 20177:00 amPRNAgreement to Issue of Equity
18th Jan 20177:00 amPRNAgreement with Project Development Consultant
6th Dec 201611:04 amPRNContainerisation of the G3-UHt Gasification System
4th Oct 20167:00 amRNSNew video showcasing G3-UHt unit in operation
21st Sep 20167:00 amPRNInterim results for the six months ended 30 June 2016
8th Sep 201612:17 pmPRNResults of Annual General Meeting
6th Sep 20167:00 amPRNCompletion of G3-UHt Testing Program
3rd Aug 20167:00 amPRNNotice of AGM
15th Jul 20167:00 amPRNIssue of Equity
12th Jul 20164:36 pmPRNHolding(s) in Company
5th Jul 20167:02 amPRNFinal Results - Replacement
30th Jun 20167:00 amPRNFinal Results
31st May 20164:31 pmPRNHolding(s) in Company
25th May 20167:05 amPRNHolding in the Company
25th May 20167:00 amPRNCommercial Cooperation Agreement
17th May 20167:00 amPRNDirectorate Change
5th May 20162:36 pmPRNIssue of Equity
3rd May 20167:30 amRNSRestoration - Powerhouse Energy Group Plc
29th Apr 20164:35 pmPRNAppointment of Nominated Adviser
28th Apr 20163:52 pmPRNCorporate and Operational Update
6th Apr 20167:00 amPRNUpdate on RenewMe and Suspension
1st Apr 20163:35 pmPRNResignation of Nomad and update on RenewMe
1st Apr 20163:30 pmRNSSuspension - Powerhouse Energy Group Plc
31st Mar 20165:00 pmPRNTotal Voting Rights
30th Mar 20167:00 amPRNUpdate on PHE G3 UHt System
22nd Mar 201611:52 amPRNHolding(s) in Company
22nd Mar 201611:28 amPRNHolding(s) in Company
9th Mar 20164:16 pmPRNHolding(s) in Company
3rd Mar 20163:13 pmPRNIssue of Equity
29th Feb 20165:00 pmPRNTotal Voting Rights
23rd Feb 20162:43 pmPRNIssue of Equity
23rd Feb 201610:59 amPRNHolding in the Company
16th Feb 20164:48 pmPRNChange of Registered Office
16th Feb 20161:44 pmPRNHolding in the Company
12th Feb 201610:06 amPRNHolding(s) in Company
26th Jan 20167:00 amPRNIssue of Equity and Holding in the Company
4th Jan 20167:00 amPRNTotal Shares On Issue
9th Dec 20157:00 amPRNCircular Resolution to Issue New Shares
3rd Dec 20152:29 pmPRNResult of AGM & Shareholder Update
10th Nov 20157:00 amPRNNotice of AGM
9th Nov 20157:00 amPRNUpdate on PHE G3-UHt

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.