George Frangeskides, Chairman at ALBA, explains why the Pilbara Lithium option ‘was too good to miss’. Watch the video here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPowerhouse Ener Regulatory News (PHE)

Share Price Information for Powerhouse Ener (PHE)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.975
Bid: 0.95
Ask: 1.00
Change: 0.00 (0.00%)
Spread: 0.05 (5.263%)
Open: 0.975
High: 0.975
Low: 0.975
Prev. Close: 0.975
PHE Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Progress Update

2 Mar 2018 07:00

POWERHOUSE ENERGY GROUP PLC - Progress Update

POWERHOUSE ENERGY GROUP PLC - Progress Update

PR Newswire

London, March 1

2 March 2018

PowerHouse Energy Group plc(“PowerHouse” or the “Company”)

Electricity Production with DMG® System at Thornton Science Park

PowerHouse Energy Group plc (AIM: PHE), the UK technology company pioneering hydrogen production from waste plastic and end-of-life tyres, is pleased to provide an update on progress with the demonstration system at the University of Chester’s Thornton Science Park.

The DMG® (Distributed Modular Gasification) demonstration system was successfully commissioned last summer after a complete rebuild and upgrade on its arrival in the UK. The system has continued to operate as expected over a period of nearly six months with a variety of feedstocks producing high-quality synthesis gas (“syngas”) safely and efficiently. Independent engineering analysis of the gas produced by tyre crumb has determined that the syngas can be adequately purified to provide a 99.999% pure stream of road-fuel-quality hydrogen while in parallel generating electricity from excess syngas.

Thus far in 2018, the testing program at the Thornton site has been concentrated on plastics – our initial targeted commercial feedstock. Both native plastic and waste plastic feedstock have been tested under a variety of pre-determined conditions to produce hydrogen-rich syngas and syngas for electrical generation.

The penultimate aim of the testing program has been the successful operation of the Company’s gas generator system for the production of electricity. The gas generator set has been operated on the syngas streams derived from each native and waste plastic using the syngas produced by the DMG® system for internal load operations. The data derived from this testing program is contributing substantially to the front-end-design engineering program for our first commercial project targeted at the Ellesmere Port area as announced previously. Subsequent to initial commercial operations the Company will finalise the engineering of the ultimate aim of the DMG® System: hydrogen production. 

The next stage of electrical production testing for the DMG® system will include connection of the generator to the Energy Centre’s micro-grid at Thornton Science Park. The site engineering for the micro-grid connection is under way and is being managed by the Energy Centre, with the expectation that the PowerHouse system will support the operation of the centre’s combined heating and power plant and other independently operated electrical components.

David Ryan, Technical Director of PowerHouse, commented:

“The results of the plastics testing have been very encouraging and allow us to feed valuable data into our rapidly advancing commercial process design. We continue to use the data derived from our process demonstration unit in our ongoing dialogue with prospective manufacturers and to aid and accelerate our planning and permitting processes.”

For more information, contact:

PowerHouse Energy Group plc Keith Allaun, Chief Executive OfficerTel: +44 (0) 203 368 6399
WH Ireland Limited (Nominated Adviser) James Joyce / Chris ViggorTel: +44 (0) 207 220 1666
Turner Pope Investments Ltd (Broker) Andy ThackerTel: +44 (0) 203 621 4120
Buchanan (Media enquiries) Mark Court / Chris LaneTel: +44 (0) 20 7466 5000

About PowerHouse Energy

PowerHouse Energy Group plc is the developer of the G3-UHt Ultra High Temperature Gasification unit, and the creator of DMG®, the Distributed Modular Gasification System that allows the distributed eradication of waste, the generation of distributed electricity, and the production of distributed hydrogen with the world’s first hydrogen from waste (HfW) process.

The Company is focused on technologies to enable projects for energy recovery from municipal and industrial waste streams that would otherwise be directed to landfills and incinerators; or from renewable and alternative fuels such as biomass, tyres, and plastics to create synthesis gas (syngas) for power generation, or high-quality hydrogen as a fuel for transport. DMG® allows for easy, economical, deployment and scaling of an environmentally sound solution to the growing challenges of waste eradication, landfill diversion, electrical demand, and distributed hydrogen production.

PowerHouse is quoted on the London Stock Exchange's AIM Market and is incorporated in the United Kingdom.

For more information see www.powerhouseenergy.net

Date   Source Headline
30th Sep 202011:57 amPRNResult of AGM
30th Sep 202011:00 amPRNAGM Statement
30th Sep 20209:00 amPRNDirectorate Change
29th Sep 20207:00 amRNSInterim Results for period to 30 June 2020
25th Sep 20207:00 amPRNDirectorate Change
9th Sep 20202:06 pmRNSSecond Price Monitoring Extn
9th Sep 20202:00 pmRNSPrice Monitoring Extension
9th Sep 202011:05 amRNSSecond Price Monitoring Extn
9th Sep 202011:00 amRNSPrice Monitoring Extension
9th Sep 20207:16 amPRN£5m fund raise and grant of Peel warrant
7th Sep 20205:00 pmPRNNotice of AGM
28th Aug 20203:16 pmRNSAppointment of Deputy Chairman
24th Aug 20209:05 amRNSSecond Price Monitoring Extn
24th Aug 20209:00 amRNSPrice Monitoring Extension
24th Aug 20207:00 amPRNCompletion of Peel Engineering Definition phase
10th Aug 20207:00 amPRNDirectorate Change
27th Jul 20207:00 amPRNDirectorate Change
16th Jul 20202:31 pmPRNDirectorate Change
14th Jul 20203:52 pmPRNResult of General Meeting and Issue of Equity
7th Jul 20202:05 pmPRNIssue of Equity
30th Jun 20207:00 amRNSFinal Results for the year ended 31 December 2019
26th Jun 20207:00 amRNSProposed waiver of Rule 9 and Notice of GM
25th Jun 20209:00 amRNSPrice Monitoring Extension
24th Jun 20204:41 pmRNSSecond Price Monitoring Extn
24th Jun 20204:36 pmRNSPrice Monitoring Extension
17th Jun 20201:45 pmPRNIssue of Equity
12th Jun 202012:34 pmPRNHolding(s) in Company
5th Jun 20209:05 amRNSSecond Price Monitoring Extn
5th Jun 20209:00 amRNSPrice Monitoring Extension
3rd Jun 20207:00 amPRNIssue of Equity
2nd Jun 20209:05 amRNSSecond Price Monitoring Extn
2nd Jun 20209:00 amRNSPrice Monitoring Extension
1st Jun 20202:05 pmRNSSecond Price Monitoring Extn
1st Jun 20202:00 pmRNSPrice Monitoring Extension
1st Jun 20207:00 amPRNOperational update re share price movement
29th May 20209:05 amRNSSecond Price Monitoring Extn
29th May 20209:00 amRNSPrice Monitoring Extension
28th May 20204:41 pmRNSSecond Price Monitoring Extn
28th May 20204:36 pmRNSPrice Monitoring Extension
28th May 20202:06 pmRNSSecond Price Monitoring Extn
28th May 20202:00 pmRNSPrice Monitoring Extension
28th May 202011:05 amRNSSecond Price Monitoring Extn
28th May 202011:00 amRNSPrice Monitoring Extension
20th May 20201:04 pmPRNIssue of Equity
13th May 20209:05 amRNSSecond Price Monitoring Extn
13th May 20209:00 amRNSPrice Monitoring Extension
11th May 20201:11 pmPRNClarification regarding holding in company
11th May 20209:05 amRNSSecond Price Monitoring Extn
11th May 20209:00 amRNSPrice Monitoring Extension
23rd Apr 20209:21 amPRNHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.