George Frangeskides, Chairman at ALBA, explains why the Pilbara Lithium option ‘was too good to miss’. Watch the video here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPowerhouse Ener Regulatory News (PHE)

Share Price Information for Powerhouse Ener (PHE)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.975
Bid: 0.95
Ask: 1.00
Change: 0.00 (0.00%)
Spread: 0.05 (5.263%)
Open: 0.975
High: 0.975
Low: 0.975
Prev. Close: 0.975
PHE Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Progress Update

2 Mar 2018 07:00

POWERHOUSE ENERGY GROUP PLC - Progress Update

POWERHOUSE ENERGY GROUP PLC - Progress Update

PR Newswire

London, March 1

2 March 2018

PowerHouse Energy Group plc(“PowerHouse” or the “Company”)

Electricity Production with DMG® System at Thornton Science Park

PowerHouse Energy Group plc (AIM: PHE), the UK technology company pioneering hydrogen production from waste plastic and end-of-life tyres, is pleased to provide an update on progress with the demonstration system at the University of Chester’s Thornton Science Park.

The DMG® (Distributed Modular Gasification) demonstration system was successfully commissioned last summer after a complete rebuild and upgrade on its arrival in the UK. The system has continued to operate as expected over a period of nearly six months with a variety of feedstocks producing high-quality synthesis gas (“syngas”) safely and efficiently. Independent engineering analysis of the gas produced by tyre crumb has determined that the syngas can be adequately purified to provide a 99.999% pure stream of road-fuel-quality hydrogen while in parallel generating electricity from excess syngas.

Thus far in 2018, the testing program at the Thornton site has been concentrated on plastics – our initial targeted commercial feedstock. Both native plastic and waste plastic feedstock have been tested under a variety of pre-determined conditions to produce hydrogen-rich syngas and syngas for electrical generation.

The penultimate aim of the testing program has been the successful operation of the Company’s gas generator system for the production of electricity. The gas generator set has been operated on the syngas streams derived from each native and waste plastic using the syngas produced by the DMG® system for internal load operations. The data derived from this testing program is contributing substantially to the front-end-design engineering program for our first commercial project targeted at the Ellesmere Port area as announced previously. Subsequent to initial commercial operations the Company will finalise the engineering of the ultimate aim of the DMG® System: hydrogen production. 

The next stage of electrical production testing for the DMG® system will include connection of the generator to the Energy Centre’s micro-grid at Thornton Science Park. The site engineering for the micro-grid connection is under way and is being managed by the Energy Centre, with the expectation that the PowerHouse system will support the operation of the centre’s combined heating and power plant and other independently operated electrical components.

David Ryan, Technical Director of PowerHouse, commented:

“The results of the plastics testing have been very encouraging and allow us to feed valuable data into our rapidly advancing commercial process design. We continue to use the data derived from our process demonstration unit in our ongoing dialogue with prospective manufacturers and to aid and accelerate our planning and permitting processes.”

For more information, contact:

PowerHouse Energy Group plc Keith Allaun, Chief Executive OfficerTel: +44 (0) 203 368 6399
WH Ireland Limited (Nominated Adviser) James Joyce / Chris ViggorTel: +44 (0) 207 220 1666
Turner Pope Investments Ltd (Broker) Andy ThackerTel: +44 (0) 203 621 4120
Buchanan (Media enquiries) Mark Court / Chris LaneTel: +44 (0) 20 7466 5000

About PowerHouse Energy

PowerHouse Energy Group plc is the developer of the G3-UHt Ultra High Temperature Gasification unit, and the creator of DMG®, the Distributed Modular Gasification System that allows the distributed eradication of waste, the generation of distributed electricity, and the production of distributed hydrogen with the world’s first hydrogen from waste (HfW) process.

The Company is focused on technologies to enable projects for energy recovery from municipal and industrial waste streams that would otherwise be directed to landfills and incinerators; or from renewable and alternative fuels such as biomass, tyres, and plastics to create synthesis gas (syngas) for power generation, or high-quality hydrogen as a fuel for transport. DMG® allows for easy, economical, deployment and scaling of an environmentally sound solution to the growing challenges of waste eradication, landfill diversion, electrical demand, and distributed hydrogen production.

PowerHouse is quoted on the London Stock Exchange's AIM Market and is incorporated in the United Kingdom.

For more information see www.powerhouseenergy.net

Date   Source Headline
14th Feb 20174:35 pmRNSPrice Monitoring Extension
6th Feb 20177:00 amPRNMOU with Peel Environmental
30th Jan 20177:00 amPRNIssue of Equity
26th Jan 20177:00 amPRNPHE G3-UHt Update
19th Jan 20177:00 amPRNAgreement to Issue of Equity
18th Jan 20177:00 amPRNAgreement with Project Development Consultant
6th Dec 201611:04 amPRNContainerisation of the G3-UHt Gasification System
4th Oct 20167:00 amRNSNew video showcasing G3-UHt unit in operation
21st Sep 20167:00 amPRNInterim results for the six months ended 30 June 2016
8th Sep 201612:17 pmPRNResults of Annual General Meeting
6th Sep 20167:00 amPRNCompletion of G3-UHt Testing Program
3rd Aug 20167:00 amPRNNotice of AGM
15th Jul 20167:00 amPRNIssue of Equity
12th Jul 20164:36 pmPRNHolding(s) in Company
5th Jul 20167:02 amPRNFinal Results - Replacement
30th Jun 20167:00 amPRNFinal Results
31st May 20164:31 pmPRNHolding(s) in Company
25th May 20167:05 amPRNHolding in the Company
25th May 20167:00 amPRNCommercial Cooperation Agreement
17th May 20167:00 amPRNDirectorate Change
5th May 20162:36 pmPRNIssue of Equity
3rd May 20167:30 amRNSRestoration - Powerhouse Energy Group Plc
29th Apr 20164:35 pmPRNAppointment of Nominated Adviser
28th Apr 20163:52 pmPRNCorporate and Operational Update
6th Apr 20167:00 amPRNUpdate on RenewMe and Suspension
1st Apr 20163:35 pmPRNResignation of Nomad and update on RenewMe
1st Apr 20163:30 pmRNSSuspension - Powerhouse Energy Group Plc
31st Mar 20165:00 pmPRNTotal Voting Rights
30th Mar 20167:00 amPRNUpdate on PHE G3 UHt System
22nd Mar 201611:52 amPRNHolding(s) in Company
22nd Mar 201611:28 amPRNHolding(s) in Company
9th Mar 20164:16 pmPRNHolding(s) in Company
3rd Mar 20163:13 pmPRNIssue of Equity
29th Feb 20165:00 pmPRNTotal Voting Rights
23rd Feb 20162:43 pmPRNIssue of Equity
23rd Feb 201610:59 amPRNHolding in the Company
16th Feb 20164:48 pmPRNChange of Registered Office
16th Feb 20161:44 pmPRNHolding in the Company
12th Feb 201610:06 amPRNHolding(s) in Company
26th Jan 20167:00 amPRNIssue of Equity and Holding in the Company
4th Jan 20167:00 amPRNTotal Shares On Issue
9th Dec 20157:00 amPRNCircular Resolution to Issue New Shares
3rd Dec 20152:29 pmPRNResult of AGM & Shareholder Update
10th Nov 20157:00 amPRNNotice of AGM
9th Nov 20157:00 amPRNUpdate on PHE G3-UHt
30th Sep 20157:00 amRNSHalf Yearly Report
15th Sep 20157:00 amRNSUpdate on PHE G3-UHt Construction & Commissioning
1st Sep 20154:40 pmRNSSecond Price Monitoring Extn
1st Sep 20154:35 pmRNSPrice Monitoring Extension
30th Jul 20157:00 amRNSTrading Statement

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.