Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPetra Diamonds Regulatory News (PDL)

Share Price Information for Petra Diamonds (PDL)

Share Price is delayed by 15 minutes
Get Live Data
8.80    -0.70 (-7.37%)
Bid:
8.80
Ask:
9.08
Spread: 0.28 (3.182%)
Market Cap: £29.52m
PDL Live PriceLast checked at - London Stock Exchange

Intraday Petra Diamonds Share Chart

Kono project - update

20 Sep 2007 10:02

Petra Diamonds Ld20 September 2007 Petra Diamonds Limited Kono project - update Petra Diamonds Limited ("Petra") announces an update concerning the Kono diamondproject in Sierra Leone. Petra's interest in the Kono project is 51%, with itsjoint venture partner Stellar Diamonds Limited ("Stellar"), a 68.5% ownedsubsidiary of Mano River Resources Inc (AIM: MANA, TSX-V: MNO), holding theremaining 49%. Highlights • The development programme makes further solid progress, with test shafts delivering highly encouraging results • Trial mining commenced on three shafts where in-situ grades of between 50 and 80 carats per hundred tonnes ("cpht") have been achieved • Petra believes that the test shafts have a high likelihood of developing into economic production operations • 2,809 diamonds totaling 241.7 carats recovered from trial mining to date (February 2007: 638 diamonds, 58.8 carats) • The increase in diamond recoveries is due to the better quality kimberlite now encountered, more consistent kimberlite fissure and better fissure widths; all very positive signs for the future development of economic operations Adonis Pouroulis, Chairman of Petra, commented; "We are pleased to report thefurther positive progress at the Kono project. The trial mining is going welland whilst further work is required in order to infer a representative grade andvalue, the results to date support our expectations for the Kono project and weprogress with confidence into the next phase of the development. The quality,consistency and width of the kimberlite now encountered are all positive signsfor the future development of economic operations." Stellar's CEO, Karl Smithson, commented: "We are very encouraged by the newsgiven by Petra Diamonds from the Kono operations. We would like to commendPetra, our partners, on their diligent and effective management of the project.Petra is the world leader in underground kimberlite fissure mining and they haveassembled a first class operational team that we are confident can bring successto the Kono project." Test Shaft Development The development programme at Kono has achieved some highly encouraging resultsin recent months with potentially economically viable kimberlite fissures havingbeen opened. Diamond yields, fissure widths and the underground mining andgeological conditions have enabled Petra to concentrate test shaft efforts onthree very promising diamondiferous kimberlite fissure targets. To date five shafts have been sunk, each to a depth of 30 metres. Three of theseshafts are now at the trial mining stage on the 30 metre level and have beenreturning satisfactory in-situ kimberlite grades of between 50 and 80 cpht.These shafts display a consistent, near-vertical dipping fissure line with veryencouraging in-situ shaft sinking grades; fissure widths vary between 40centimetres ("cm") and 200cm with satisfactory mining conditions experienced todate. Two shafts were discontinued because diamond recoveries during the shaftsinking and trial mining phases did not match the potential of the other threeshafts. The test shafts are at advanced levels of development and the processing of thelimited amount of weathered, diluted and mixed diamondiferous kimberliticmaterial extracted during shaft sinking has yielded 2,809 diamonds totaling241.7 carats. The ten largest diamonds ranged in size from 0.65 carats to 7.2carats. Although the diamond yields are highly encouraging from the small amountof material processed, Petra is of the opinion that the scale of the test workconducted is presently too limited to arrive at any representative grade orvalue and accordingly will report on further findings when available. The next phase of the project will excavate approximately 100 metres ofkimberlite along strike of ore body at each shaft, so as to processapproximately 1,000 tonnes of clean kimberlite and obtain acceptable run of minegrades and diamond values to be used in proposed business plans. It isanticipated that this next phase programme will be completed by March 2008. Exploration Development During shaft sinking operations Petra found that, due to the highly saprolitisednature of the rocks in this locality, the silicate and spinel kimberliteindicator minerals have been destroyed, in many cases to depths of up to 20metres. It has further been ascertained that ilmenite-deficient kimberlitesexist in the area. These conditions may mean that kimberlite pipes wereoverlooked during mining and exploration operations carried out by previousoperators in the area. Petra is therefore considering the flying of a low-levelhelicopter borne electro-magnetic survey over the licence areas so as toprospect for these potential deposits. Ends Notes 1. The information in this update that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Jim Davidson, Pr. Sci Nat (reg No 400031/06), who is a Member of the Geological Society of South Africa, a 'Recognised Overseas Professional Organisation' ('ROPO'). Jim Davidson is the Qualified Person for the purposes of the AIM Guidance Note on Mining, Oil and Gas Companies dated March 2006. Jim Davidson is a full-time employee of the Company and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify. Jim Davidson has given his written consent to the inclusion in this announcement of the matters based on his information in the form and context in which it appears. 2. It should be noted that the potential quantity in this report is conceptual in nature, there has been insufficient exploration to define a Mineral Resource and it is uncertain if further exploration will result in the determination of a Mineral Resource. For further information, please contact:Justine Howarth / Louise Goodeve Telephone: +44 (0) 20 7851 7480Parkgreen Communications, London Adrian Hadden Telephone: +44 (0) 20 7523 8000Collins Stewart, London This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
1st Dec 20159:00 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
1st Dec 20158:10 amRNSAcquisition of interest in Kimberley Mines
30th Nov 20153:04 pmRNSAmendment to Covenant Measurement
30th Nov 201511:22 amRNSResults of Annual General Meeting
30th Nov 20157:00 amRNSDeferred Share Awards
27th Nov 201510:00 amRNSRecovery of 23 carat Pink Diamond at Williamson
25th Nov 20155:18 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
25th Nov 20157:42 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
23rd Nov 20157:00 amRNSDividend Payment Information
2nd Nov 20157:00 amRNSPublication of Sustainability Report
30th Oct 20157:00 amRNSTotal voting rights
29th Oct 20155:53 pmRNSTR-1: NOTIFICATIONS OF MAJOR INTERESTS IN SHARES
28th Oct 20157:00 amRNSTrading Update - Q1 FY 2016
20th Oct 20157:00 amRNSAnnual Report and Notice of Annual General Meeting
13th Oct 20155:00 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
13th Oct 20157:00 amRNSNotice of Trading Update
7th Oct 20154:23 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
7th Oct 20152:42 pmRNSDirector Share Grants
7th Oct 20157:00 amRNSVesting of Share Awards
5th Oct 20154:05 pmRNSTR-1: NOTIFICATIONS OF MAJOR INTERESTS IN SHARES
2nd Oct 20154:16 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
1st Oct 20153:25 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
28th Sep 20154:02 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
28th Sep 20157:00 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
25th Sep 20154:53 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
24th Sep 20156:01 pmRNSNotification of Transactions of Directors
24th Sep 20155:54 pmRNSNotification of Transactions of Directors
24th Sep 20155:53 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
24th Sep 201511:41 amRNSDirector Share Vesting
21st Sep 20153:39 pmRNSNotification of Transactions of Directors
18th Sep 20157:00 amRNSPreliminary Results
9th Sep 20155:00 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
4th Sep 20153:00 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
17th Aug 20153:25 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
27th Jul 20157:00 amRNSFY2015 Trading Update and FY2016 Guidance
20th Jul 20154:07 pmRNSNotification of Major Interest in Shares
14th Jul 20153:34 pmRNSNotice of FY15 Trading Update and Guidance Update
7th Jul 20159:48 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
30th Jun 20157:00 amRNSTotal Voting Rights
19th Jun 20157:00 amRNSBlock Listing Six Monthly Return
17th Jun 20154:12 pmRNSNotification of Transactions of Directors
17th Jun 20154:11 pmRNSNotification of Transactions of Directors
15th Jun 20157:00 amRNSNotification of transactions of directors
12th Jun 20157:00 amRNSFY 2015 - Market Update
19th May 20153:54 pmRNSNOTIFICATION OF MAJOR INTEREST IN SHARES
19th May 20159:46 amRNSNotification of Major Interest in Shares
8th May 20159:00 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
7th May 20157:00 amRNSPricing of US$300 Million Notes Issue
24th Apr 20157:00 amRNSBond issue and Cullinan plant
16th Apr 20157:00 amRNSTrading Update - Q3 FY 2015

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.