Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPetra Diamonds Regulatory News (PDL)

Share Price Information for Petra Diamonds (PDL)

Share Price is delayed by 15 minutes
Get Live Data
8.80    -0.70 (-7.37%)
Bid:
8.80
Ask:
9.08
Spread: 0.28 (3.182%)
Market Cap: £29.52m
PDL Live PriceLast checked at - London Stock Exchange

Intraday Petra Diamonds Share Chart

Kono project - update

20 Sep 2007 10:02

Petra Diamonds Ld20 September 2007 Petra Diamonds Limited Kono project - update Petra Diamonds Limited ("Petra") announces an update concerning the Kono diamondproject in Sierra Leone. Petra's interest in the Kono project is 51%, with itsjoint venture partner Stellar Diamonds Limited ("Stellar"), a 68.5% ownedsubsidiary of Mano River Resources Inc (AIM: MANA, TSX-V: MNO), holding theremaining 49%. Highlights • The development programme makes further solid progress, with test shafts delivering highly encouraging results • Trial mining commenced on three shafts where in-situ grades of between 50 and 80 carats per hundred tonnes ("cpht") have been achieved • Petra believes that the test shafts have a high likelihood of developing into economic production operations • 2,809 diamonds totaling 241.7 carats recovered from trial mining to date (February 2007: 638 diamonds, 58.8 carats) • The increase in diamond recoveries is due to the better quality kimberlite now encountered, more consistent kimberlite fissure and better fissure widths; all very positive signs for the future development of economic operations Adonis Pouroulis, Chairman of Petra, commented; "We are pleased to report thefurther positive progress at the Kono project. The trial mining is going welland whilst further work is required in order to infer a representative grade andvalue, the results to date support our expectations for the Kono project and weprogress with confidence into the next phase of the development. The quality,consistency and width of the kimberlite now encountered are all positive signsfor the future development of economic operations." Stellar's CEO, Karl Smithson, commented: "We are very encouraged by the newsgiven by Petra Diamonds from the Kono operations. We would like to commendPetra, our partners, on their diligent and effective management of the project.Petra is the world leader in underground kimberlite fissure mining and they haveassembled a first class operational team that we are confident can bring successto the Kono project." Test Shaft Development The development programme at Kono has achieved some highly encouraging resultsin recent months with potentially economically viable kimberlite fissures havingbeen opened. Diamond yields, fissure widths and the underground mining andgeological conditions have enabled Petra to concentrate test shaft efforts onthree very promising diamondiferous kimberlite fissure targets. To date five shafts have been sunk, each to a depth of 30 metres. Three of theseshafts are now at the trial mining stage on the 30 metre level and have beenreturning satisfactory in-situ kimberlite grades of between 50 and 80 cpht.These shafts display a consistent, near-vertical dipping fissure line with veryencouraging in-situ shaft sinking grades; fissure widths vary between 40centimetres ("cm") and 200cm with satisfactory mining conditions experienced todate. Two shafts were discontinued because diamond recoveries during the shaftsinking and trial mining phases did not match the potential of the other threeshafts. The test shafts are at advanced levels of development and the processing of thelimited amount of weathered, diluted and mixed diamondiferous kimberliticmaterial extracted during shaft sinking has yielded 2,809 diamonds totaling241.7 carats. The ten largest diamonds ranged in size from 0.65 carats to 7.2carats. Although the diamond yields are highly encouraging from the small amountof material processed, Petra is of the opinion that the scale of the test workconducted is presently too limited to arrive at any representative grade orvalue and accordingly will report on further findings when available. The next phase of the project will excavate approximately 100 metres ofkimberlite along strike of ore body at each shaft, so as to processapproximately 1,000 tonnes of clean kimberlite and obtain acceptable run of minegrades and diamond values to be used in proposed business plans. It isanticipated that this next phase programme will be completed by March 2008. Exploration Development During shaft sinking operations Petra found that, due to the highly saprolitisednature of the rocks in this locality, the silicate and spinel kimberliteindicator minerals have been destroyed, in many cases to depths of up to 20metres. It has further been ascertained that ilmenite-deficient kimberlitesexist in the area. These conditions may mean that kimberlite pipes wereoverlooked during mining and exploration operations carried out by previousoperators in the area. Petra is therefore considering the flying of a low-levelhelicopter borne electro-magnetic survey over the licence areas so as toprospect for these potential deposits. Ends Notes 1. The information in this update that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Jim Davidson, Pr. Sci Nat (reg No 400031/06), who is a Member of the Geological Society of South Africa, a 'Recognised Overseas Professional Organisation' ('ROPO'). Jim Davidson is the Qualified Person for the purposes of the AIM Guidance Note on Mining, Oil and Gas Companies dated March 2006. Jim Davidson is a full-time employee of the Company and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify. Jim Davidson has given his written consent to the inclusion in this announcement of the matters based on his information in the form and context in which it appears. 2. It should be noted that the potential quantity in this report is conceptual in nature, there has been insufficient exploration to define a Mineral Resource and it is uncertain if further exploration will result in the determination of a Mineral Resource. For further information, please contact:Justine Howarth / Louise Goodeve Telephone: +44 (0) 20 7851 7480Parkgreen Communications, London Adrian Hadden Telephone: +44 (0) 20 7523 8000Collins Stewart, London This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
30th Oct 20177:00 amRNSPublication of Sustainability Report
23rd Oct 20177:00 amRNSQ1 FY 2018 Trading Update
16th Oct 20177:00 amRNSAnnual Report and Notice of AGM
10th Oct 20177:00 amRNSNotification of Q1 FY 2018 Trading Update
9th Oct 20177:00 amRNSUpdate re. Bank Facility Covenants
29th Sep 20173:55 pmRNSNotification of Major Holdings
29th Sep 20172:39 pmRNSUpdate on Labour Relations in South Africa
28th Sep 20174:10 pmRNSUpdate on Labour Relations in South Africa
27th Sep 20174:20 pmRNSUpdate on Operations in Tanzania
21st Sep 20173:40 pmRNSUpdate on Labour Disruptions in South Africa
21st Sep 20179:01 amRNSNOTIFICATION OF MAJOR HOLDINGS
19th Sep 20178:16 amRNSIndustrial Action in South Africa
18th Sep 20177:00 amRNSFY2017 Preliminary Results
11th Sep 20177:00 amRNSUpdate re. Operations in Tanzania
8th Sep 20171:02 pmRNSAmendment to Covenant Measurement
17th Aug 20178:41 amRNSNotification of Major Holdings
8th Aug 201711:37 amRNSNOTIFICATION OF MAJOR HOLDINGS
24th Jul 20177:00 amRNSFY 2017 Trading Update and FY 2018 Guidance
3rd Jul 20177:00 amRNSBlock Listing Six Monthly Return
28th Jun 20177:00 amRNSMarket Update
22nd Jun 201712:00 pmRNSTotal Voting Rights
20th Jun 20178:30 amRNSTR-1: Notification Of Major Interest In Shares
15th Jun 20174:10 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
31st May 20177:00 amRNSTotal Voting Rights
24th May 20172:12 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
19th May 20172:45 pmRNSNotification of Transaction of Director / PDMR
24th Apr 20173:50 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
24th Apr 20177:00 amRNSQ3 FY 2017 Production and Sales Report
21st Apr 20173:20 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
18th Apr 20179:00 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
12th Apr 20171:05 pmRNSExisting Notes Redemption
6th Apr 20177:00 amRNSPricing of US$650 Million Notes Issue
4th Apr 20172:01 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
30th Mar 20177:00 amRNSProposed US$600M Notes Issue & Debt Restructuring
21st Mar 20172:42 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
14th Mar 20173:47 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
13th Mar 20177:00 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
6th Mar 20173:40 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
3rd Mar 201712:17 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
20th Feb 20177:00 amRNSInterim results for the six months to 31 Dec 2016
23rd Jan 20177:00 amRNSTrading Update for the 6 Months ended 31 Dec 2016
20th Jan 20172:14 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
19th Jan 20174:18 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
16th Jan 20174:53 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
9th Jan 20177:00 amRNSNotification of H1 FY 2017 Trading Update
5th Jan 20174:15 pmRNSBlock listing six monthly return (correction)
30th Dec 20167:00 amRNSTotal Voting Rights
29th Dec 20167:00 amRNSFull Report on Payments to Governments
23rd Dec 20167:00 amRNSBlock Listing Six Monthly Return
21st Dec 20167:00 amRNSReport on Payments to Governments

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.