Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPetra Diamonds Regulatory News (PDL)

Share Price Information for Petra Diamonds (PDL)

Share Price is delayed by 15 minutes
Get Live Data
8.80    -0.70 (-7.37%)
Bid:
8.80
Ask:
9.08
Spread: 0.28 (3.182%)
Market Cap: £29.52m
PDL Live PriceLast checked at - London Stock Exchange

Intraday Petra Diamonds Share Chart

Kono project - update

20 Sep 2007 10:02

Petra Diamonds Ld20 September 2007 Petra Diamonds Limited Kono project - update Petra Diamonds Limited ("Petra") announces an update concerning the Kono diamondproject in Sierra Leone. Petra's interest in the Kono project is 51%, with itsjoint venture partner Stellar Diamonds Limited ("Stellar"), a 68.5% ownedsubsidiary of Mano River Resources Inc (AIM: MANA, TSX-V: MNO), holding theremaining 49%. Highlights • The development programme makes further solid progress, with test shafts delivering highly encouraging results • Trial mining commenced on three shafts where in-situ grades of between 50 and 80 carats per hundred tonnes ("cpht") have been achieved • Petra believes that the test shafts have a high likelihood of developing into economic production operations • 2,809 diamonds totaling 241.7 carats recovered from trial mining to date (February 2007: 638 diamonds, 58.8 carats) • The increase in diamond recoveries is due to the better quality kimberlite now encountered, more consistent kimberlite fissure and better fissure widths; all very positive signs for the future development of economic operations Adonis Pouroulis, Chairman of Petra, commented; "We are pleased to report thefurther positive progress at the Kono project. The trial mining is going welland whilst further work is required in order to infer a representative grade andvalue, the results to date support our expectations for the Kono project and weprogress with confidence into the next phase of the development. The quality,consistency and width of the kimberlite now encountered are all positive signsfor the future development of economic operations." Stellar's CEO, Karl Smithson, commented: "We are very encouraged by the newsgiven by Petra Diamonds from the Kono operations. We would like to commendPetra, our partners, on their diligent and effective management of the project.Petra is the world leader in underground kimberlite fissure mining and they haveassembled a first class operational team that we are confident can bring successto the Kono project." Test Shaft Development The development programme at Kono has achieved some highly encouraging resultsin recent months with potentially economically viable kimberlite fissures havingbeen opened. Diamond yields, fissure widths and the underground mining andgeological conditions have enabled Petra to concentrate test shaft efforts onthree very promising diamondiferous kimberlite fissure targets. To date five shafts have been sunk, each to a depth of 30 metres. Three of theseshafts are now at the trial mining stage on the 30 metre level and have beenreturning satisfactory in-situ kimberlite grades of between 50 and 80 cpht.These shafts display a consistent, near-vertical dipping fissure line with veryencouraging in-situ shaft sinking grades; fissure widths vary between 40centimetres ("cm") and 200cm with satisfactory mining conditions experienced todate. Two shafts were discontinued because diamond recoveries during the shaftsinking and trial mining phases did not match the potential of the other threeshafts. The test shafts are at advanced levels of development and the processing of thelimited amount of weathered, diluted and mixed diamondiferous kimberliticmaterial extracted during shaft sinking has yielded 2,809 diamonds totaling241.7 carats. The ten largest diamonds ranged in size from 0.65 carats to 7.2carats. Although the diamond yields are highly encouraging from the small amountof material processed, Petra is of the opinion that the scale of the test workconducted is presently too limited to arrive at any representative grade orvalue and accordingly will report on further findings when available. The next phase of the project will excavate approximately 100 metres ofkimberlite along strike of ore body at each shaft, so as to processapproximately 1,000 tonnes of clean kimberlite and obtain acceptable run of minegrades and diamond values to be used in proposed business plans. It isanticipated that this next phase programme will be completed by March 2008. Exploration Development During shaft sinking operations Petra found that, due to the highly saprolitisednature of the rocks in this locality, the silicate and spinel kimberliteindicator minerals have been destroyed, in many cases to depths of up to 20metres. It has further been ascertained that ilmenite-deficient kimberlitesexist in the area. These conditions may mean that kimberlite pipes wereoverlooked during mining and exploration operations carried out by previousoperators in the area. Petra is therefore considering the flying of a low-levelhelicopter borne electro-magnetic survey over the licence areas so as toprospect for these potential deposits. Ends Notes 1. The information in this update that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Jim Davidson, Pr. Sci Nat (reg No 400031/06), who is a Member of the Geological Society of South Africa, a 'Recognised Overseas Professional Organisation' ('ROPO'). Jim Davidson is the Qualified Person for the purposes of the AIM Guidance Note on Mining, Oil and Gas Companies dated March 2006. Jim Davidson is a full-time employee of the Company and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify. Jim Davidson has given his written consent to the inclusion in this announcement of the matters based on his information in the form and context in which it appears. 2. It should be noted that the potential quantity in this report is conceptual in nature, there has been insufficient exploration to define a Mineral Resource and it is uncertain if further exploration will result in the determination of a Mineral Resource. For further information, please contact:Justine Howarth / Louise Goodeve Telephone: +44 (0) 20 7851 7480Parkgreen Communications, London Adrian Hadden Telephone: +44 (0) 20 7523 8000Collins Stewart, London This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
30th Aug 20184:09 pmRNSNotification of Major Holdings
23rd Aug 20182:45 pmRNSNOTIFICATION OF MAJOR HOLDINGS
17th Aug 20183:43 pmRNSNOTIFICATION OF MAJOR HOLDINGS
2nd Aug 20183:22 pmRNSHolding(s) in Company
23rd Jul 201811:29 amRNSREPLACEMENT: FY'18 Trading Update & FY'19 Guidance
23rd Jul 20187:00 amRNSFY 2018 Trading Update and FY 2019 Guidance Update
20th Jul 201811:49 amRNSBlock Listing Six Monthly Return
11th Jul 20189:02 amRNSNOTIFICATION OF MAJOR HOLDINGS
9th Jul 20189:16 amRNSNotification of Major Holdings
9th Jul 20187:00 amRNSFY 2018 Trading Update & FY 2019 Market Guidance
5th Jul 201811:46 amRNSDisposal of Interest in Kimberley Ekapa Mining JV
5th Jul 201810:44 amRNSNOTIFICATION OF MAJOR HOLDINGS
29th Jun 201812:06 pmRNSTotal Voting Rights
29th Jun 201811:45 amRNSResults of the Rump Placing
29th Jun 20187:00 amRNSResults of the Rights Issue
19th Jun 201811:27 amRNSNotification of Transactions of PDMR
19th Jun 20188:00 amRNSNotification of Major Holdings
15th Jun 201812:52 pmRNSNOTIFICATION OF MAJOR HOLDINGS
14th Jun 20184:42 pmRNSNOTIFICATION OF MAJOR HOLDINGS
14th Jun 20187:00 amRNSAdmission of Nil Paid Rights
13th Jun 201812:05 pmRNSResults of General Meeting
11th Jun 20189:00 amRNSNotification of Major Holdings
5th Jun 20181:46 pmRNSHolding(s) in Company
24th May 20182:19 pmRNSPublication of Prospectus
24th May 20187:00 amRNSProposed 5 for 8 US$178 million Rights Issue
10th May 20188:00 amRNSNotification of Major Holdings
23rd Apr 20187:00 amRNSQ3 FY2018 Trading Update
13th Apr 20188:39 amRNSNotification of Major Holdings
10th Apr 20184:59 pmRNSNotification of Major Holdings
10th Apr 20189:10 amRNSFinalisation of Covenant Changes
28th Feb 20183:51 pmRNSTotal Voting Rights
20th Feb 201810:47 amRNSNOTIFICATION OF MAJOR HOLDINGS
19th Feb 20187:00 amRNSInterim Results
19th Feb 20187:00 amRNSDirectorate Change
5th Feb 20187:00 amRNSPublication of Corporate Presentation
2nd Feb 20188:46 amRNSPublication of Cullinan Site Visit Presentation
1st Feb 20182:55 pmRNSNOTIFICATION OF MAJOR HOLDINGS
1st Feb 20189:27 amRNSPublication of Finsch Site Visit Presentation
29th Jan 20187:00 amRNSH1 FY 2018 Trading Update
8th Jan 20187:00 amRNSNotification of H1 FY 2018 Trading Update
29th Dec 20177:00 amRNSBlock Listing Six Monthly Return
19th Dec 20177:00 amRNSFY 2017 Payments to Governments Report
8th Dec 20179:12 amRNSNOTIFICATION OF MAJOR HOLDINGS
7th Dec 20179:23 amRNSNOTIFICATION OF MAJOR HOLDINGS
30th Nov 201710:19 amRNSTotal Voting Rights
24th Nov 20171:30 pmRNSResults of Annual General Meeting
3rd Nov 20171:32 pmRNSDirector Share Awards
3rd Nov 20171:31 pmRNSDirector Share Vesting
3rd Nov 20171:30 pmRNSVesting of Share Awards
31st Oct 20171:28 pmRNSTotal Voting Rights

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.