Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPantheon Resources plc Regulatory News (PANR)

Share Price Information for Pantheon Resources plc (PANR)

Share Price is delayed by 15 minutes
Get Live Data
15.71    2.19 (16.20%)
Bid:
15.75
Ask:
15.90
Spread: 0.15 (0.952%)
Market Cap: £229.04m
PANR Live PriceLast checked at - London Stock Exchange

Intraday Pantheon Resources plc Share Chart

Operational Update

6 Jan 2009 08:00

RNS Number : 1614L
Pantheon Resources PLC
06 January 2009
 



Press release

 06 January 2009

Pantheon Resources plc - Operational Update

Pantheon Resources plc ("Pantheon" or the "Company"), the AIM-quoted oil and gas exploration company active in the Gulf of Mexicoprovides the following operational update:

The Jumonville #2 well commenced drilling on 25th December 2008. Surface casing has been set at 3,600 feet ("ft"). The well is currently drilling ahead to the kick-off point for the directional portion of the borehole. Planned total depth is approximately 14,200ft. Drilling is expected to take approximately 60 days to reach total depth. 

The Jumonville #2 well's primary target is the deeper Cib Haz interval. It will also delineate the Miogyp reservoir at a distance some 1,500 ft to the west of Jumonville #. This well should provide further data for reserve assessment. It is also planned to test the Camerina formation in the offset drilling at Jumonville #2. 

Discoveries in the two objectives above the Cib Haz (Miogyp and Camerina) provide confidence for this deeper target. The deeper Cib Haz interval is contained in the same trapping mechanism as the proven Miogyp reservoir. It is thus considered by the operator to have a high probability of success, although it remains an exploration target. Seismic data indicate substantially thicker reservoir sand over a larger area in the deeper reservoir.

The Jumonville # 1 well has been put back on production. This well was shut-in for safety reasons during the transport and setting up of the H&P # 79 rig to drill Jumonville # 2 from the same drill pad. Current daily gross production is running at approximately 570 barrels of oil and 300 thousand cubic feet of natural gas. Production rates are being monitored to test the optimal flow rates from the reservoir now that the gas sales line is connected and production constraints have been removed.

The Acosta #1 well is reaching the end of its standard completion operation, including logging and a successful remedial cement squeeze. Production tubing is expected to be pressure tested and run-in shortly. The workover rig will be moved off and separation equipment put in place ready for perforation and flow testing of the Miogyp formation by the end of the week. Flow testing will be undertaken directly into the surface production facilities. 

Flow testing of the Acosta #1 Miogyp formation should provide further confirmation of the oil-water contact and reservoir thickness. Once testing at Acosta #1 is complete, further assessment of the potential reserves of the Miogyp formation will be undertaken.

The Vision Rice University #1 well operated by Vision Resources LLC is currently drilling below 14,170 ft measured depth. It is currently building angle in accordance with the well plan for the horizontal section of the well. On a trouble free basis it is estimated that wells in this venture should take approximately 75 days on average to drill, including both the vertical and horizontal sections. This well spudded on 12th November 2008. 

For further information on Pantheon Resources plc, see the website at www.pantheonresources.com

Further information:

Pantheon Resources plc

Jay Cheatham, CEO

+44 20 7484 5359

Oriel Securities Limited

Michael Shaw

+44 20 7710 7600

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
STRGRGDBRUGGGCL
Date   Source Headline
15th Nov 20078:43 amRNSProduction Update - Oct 2007
13th Nov 20079:29 amRNSHolding(s) in Company
2nd Nov 20074:23 pmRNSHolding(s) in Company
2nd Nov 20072:50 pmRNSOption Grant
25th Oct 200712:12 pmRNSHolding(s) in Company
25th Oct 200712:09 pmRNSHolding(s) in Company
25th Oct 200712:08 pmRNSHolding(s) in Company
19th Oct 20072:42 pmRNSHolding(s) in Company
16th Oct 20077:01 amRNSSpudding of Nottoway Prospect
16th Oct 20077:00 amRNSProduction Update
4th Oct 20077:01 amRNSProduction Update - Sept 2007
19th Sep 20077:01 amRNSFirst Production-Dunn Deep #2
17th Sep 20072:38 pmRNSHolding(s) in Company
17th Sep 20072:26 pmRNSProduction Update-August 2007
14th Sep 20075:20 pmRNSHolding(s) in Company
11th Sep 200710:43 amRNSFirst Production from Wilson
7th Sep 20077:01 amRNSDunn Deep Update
3rd Sep 20073:00 pmRNSHolding(s) in Company
3rd Sep 20077:01 amRNSAppointment of Director
15th Aug 20077:00 amRNSDrilling Programme Update
7th Aug 20077:01 amRNSAddition to Portfolio
6th Aug 20077:59 amRNSProduction Update - July 2007
30th Jul 20074:24 pmRNSHolding(s) in Company
25th Jul 20074:08 pmRNSHolding(s) in Company
17th Jul 20077:00 amRNSAddition to portfolio
10th Jul 20074:21 pmRNSHolding(s) in Company
5th Jul 200711:45 amRNSHolding(s) in Company
5th Jul 20077:46 amRNSProduction Update - June 2007
25th Jun 20072:58 pmRNSProduction Update-June 2007
25th Jun 20077:36 amRNSProduction Update - June 2007
19th Jun 200711:45 amRNSHolding(s) in Company
18th Jun 20078:32 amRNSWilson Update
8th Jun 20073:13 pmRNSProduction Update - May 2007
6th Jun 20072:57 pmRNSHolding(s) in Company
4th Jun 20078:12 amRNSWilson Test Result
29th May 20079:40 amRNSWilson Drilling Update
22nd May 20078:33 amRNSWilson Drilling Update
21st May 20077:30 amRNSAddition to portfolio
16th May 20077:49 amRNSDrilling Update on Wilson
14th May 20074:03 pmRNSHolding(s) in Company
10th May 20078:47 amRNSProduction Update- April 2007
3rd May 200710:50 amRNSHolding(s) in Company
2nd May 20078:19 amRNSHolding(s) in Company
27th Apr 20072:03 pmRNSHolding(s) in Company
20th Apr 20077:01 amRNSWilson Drilling Update
11th Apr 20077:01 amRNSProduction Update-March 2007
10th Apr 20077:43 amRNSNatural Gas Encountered
5th Apr 20077:01 amRNSDrilling Report
30th Mar 20076:06 pmRNSInterim Results
29th Mar 200710:55 amRNSProject Wharton Spudded

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.