Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPantheon Resources plc Regulatory News (PANR)

Share Price Information for Pantheon Resources plc (PANR)

Share Price is delayed by 15 minutes
Get Live Data
15.47    1.95 (14.42%)
Bid:
15.09
Ask:
15.47
Spread: 0.38 (2.518%)
Market Cap: £225.54m
PANR Live PriceLast checked at - London Stock Exchange

Intraday Pantheon Resources plc Share Chart

Operational Update

6 Jan 2009 08:00

RNS Number : 1614L
Pantheon Resources PLC
06 January 2009
 



Press release

 06 January 2009

Pantheon Resources plc - Operational Update

Pantheon Resources plc ("Pantheon" or the "Company"), the AIM-quoted oil and gas exploration company active in the Gulf of Mexicoprovides the following operational update:

The Jumonville #2 well commenced drilling on 25th December 2008. Surface casing has been set at 3,600 feet ("ft"). The well is currently drilling ahead to the kick-off point for the directional portion of the borehole. Planned total depth is approximately 14,200ft. Drilling is expected to take approximately 60 days to reach total depth. 

The Jumonville #2 well's primary target is the deeper Cib Haz interval. It will also delineate the Miogyp reservoir at a distance some 1,500 ft to the west of Jumonville #. This well should provide further data for reserve assessment. It is also planned to test the Camerina formation in the offset drilling at Jumonville #2. 

Discoveries in the two objectives above the Cib Haz (Miogyp and Camerina) provide confidence for this deeper target. The deeper Cib Haz interval is contained in the same trapping mechanism as the proven Miogyp reservoir. It is thus considered by the operator to have a high probability of success, although it remains an exploration target. Seismic data indicate substantially thicker reservoir sand over a larger area in the deeper reservoir.

The Jumonville # 1 well has been put back on production. This well was shut-in for safety reasons during the transport and setting up of the H&P # 79 rig to drill Jumonville # 2 from the same drill pad. Current daily gross production is running at approximately 570 barrels of oil and 300 thousand cubic feet of natural gas. Production rates are being monitored to test the optimal flow rates from the reservoir now that the gas sales line is connected and production constraints have been removed.

The Acosta #1 well is reaching the end of its standard completion operation, including logging and a successful remedial cement squeeze. Production tubing is expected to be pressure tested and run-in shortly. The workover rig will be moved off and separation equipment put in place ready for perforation and flow testing of the Miogyp formation by the end of the week. Flow testing will be undertaken directly into the surface production facilities. 

Flow testing of the Acosta #1 Miogyp formation should provide further confirmation of the oil-water contact and reservoir thickness. Once testing at Acosta #1 is complete, further assessment of the potential reserves of the Miogyp formation will be undertaken.

The Vision Rice University #1 well operated by Vision Resources LLC is currently drilling below 14,170 ft measured depth. It is currently building angle in accordance with the well plan for the horizontal section of the well. On a trouble free basis it is estimated that wells in this venture should take approximately 75 days on average to drill, including both the vertical and horizontal sections. This well spudded on 12th November 2008. 

For further information on Pantheon Resources plc, see the website at www.pantheonresources.com

Further information:

Pantheon Resources plc

Jay Cheatham, CEO

+44 20 7484 5359

Oriel Securities Limited

Michael Shaw

+44 20 7710 7600

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
STRGRGDBRUGGGCL
Date   Source Headline
27th Feb 20207:30 amRNSRestoration - Pantheon Resources Plc
25th Feb 202011:01 amRNSFinal Results for the Year Ended 30 June 2019
20th Feb 20207:00 amRNSPublication of Annual Results
20th Feb 20207:00 amRNSPublication of Annual Results
30th Jan 20207:00 amRNSNew Project OIP estimate and Company presentation
23rd Jan 20207:00 amRNSResource Update
2nd Jan 20207:30 amRNSSuspension - Pantheon Resources plc
2nd Jan 20207:00 amRNSPublication of Audited Financial Results
12th Dec 20197:07 amRNSAcquisition of key leases in Alaska's North Slope
15th Nov 20194:40 pmRNSSecond Price Monitoring Extn
15th Nov 20194:35 pmRNSPrice Monitoring Extension
6th Nov 20197:01 amRNSCompany Update
17th Oct 20197:00 amRNSAcquisition of Halliburton 25% WI in Alkaid/Phecda
2nd Oct 20197:59 amRNSAppointment of Non-Executive Director
24th Sep 201910:00 amRNSPantheon Resources Alaskan Project Update and Q&A
12th Sep 201912:32 pmRNSInvitation to Alaskan Project Update and Q&A
2nd Sep 20195:25 pmRNSDirector/PDMR Shareholding
14th Aug 201912:11 pmRNSIssue of Equity
9th Aug 20192:45 pmRNSTR-1: Notification of major holdings
5th Aug 20197:00 amRNSOpening of Data Room and Farmout Process
26th Jul 201911:18 amRNSHolding(s) in Company
19th Jul 201912:48 pmRNSResult of Capital Raising
19th Jul 20198:06 amRNSClose of Capital Raising
18th Jul 20194:58 pmRNSProposed Placing and Subscription of US$6.5million
12th Jul 20197:00 amRNSAlaskan Update
25th Jun 20193:25 pmRNSCorporate Presentation June 2019
24th Jun 20197:00 amRNSPartnership with High-Tech Geophysics specialist
6th Jun 20197:00 amRNSResource upgrade - Alkaid prospect
5th Jun 20197:00 amRNSCEO Q&A podcast confirmed
30th May 20197:00 amRNSUpdate on timing of CEO Q&A podcast
20th May 20197:00 amRNSAlaskan update and notification of CEO Q&A podcast
14th May 20194:40 pmRNSSecond Price Monitoring Extn
14th May 20194:35 pmRNSPrice Monitoring Extension
2nd Apr 20197:19 amRNSAlkaid Well Update
28th Mar 20197:00 amRNSInterim Results for the Six Months Ended 31/12/18
25th Mar 20197:54 amRNSAlkaid Well - successful flow test
20th Mar 20197:00 amRNSOperational Update
18th Mar 201910:19 amRNSPassing of John Walmsley, Non-executive Director
13th Mar 20197:00 amRNSWinx-1 Exploration Well drilling update
12th Mar 20195:07 pmRNSDirector's interest in shares
11th Mar 20197:00 amRNSAppointment of Technical Director
6th Mar 20197:00 amRNSOperational update: Winx-1 and Alkaid wells
4th Mar 20197:00 amRNSWinx-1 Exploration Well drilling update
1st Mar 20197:45 amRNSWinx-1 Exploration Well drilling update
25th Feb 20197:00 amRNSUpdate on Alkaid Well, Alaska
18th Feb 20197:26 amRNSSpudding of Winx-1 well in Alaska
21st Jan 20194:40 pmRNSHolding(s) in Company
21st Jan 20198:49 amRNSCompletion of the Great Bear Acquisition
17th Jan 20198:16 amRNSStatement re Winx-1 Well
14th Jan 20191:41 pmRNSResult of AGM and General Meeting

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.