Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPantheon Resources plc Regulatory News (PANR)

Share Price Information for Pantheon Resources plc (PANR)

Share Price is delayed by 15 minutes
Get Live Data
15.71    2.19 (16.20%)
Bid:
15.63
Ask:
15.99
Spread: 0.36 (2.303%)
Market Cap: £229.04m
PANR Live PriceLast checked at - London Stock Exchange

Intraday Pantheon Resources plc Share Chart

Operational Update

6 Jan 2009 08:00

RNS Number : 1614L
Pantheon Resources PLC
06 January 2009
 



Press release

 06 January 2009

Pantheon Resources plc - Operational Update

Pantheon Resources plc ("Pantheon" or the "Company"), the AIM-quoted oil and gas exploration company active in the Gulf of Mexicoprovides the following operational update:

The Jumonville #2 well commenced drilling on 25th December 2008. Surface casing has been set at 3,600 feet ("ft"). The well is currently drilling ahead to the kick-off point for the directional portion of the borehole. Planned total depth is approximately 14,200ft. Drilling is expected to take approximately 60 days to reach total depth. 

The Jumonville #2 well's primary target is the deeper Cib Haz interval. It will also delineate the Miogyp reservoir at a distance some 1,500 ft to the west of Jumonville #. This well should provide further data for reserve assessment. It is also planned to test the Camerina formation in the offset drilling at Jumonville #2. 

Discoveries in the two objectives above the Cib Haz (Miogyp and Camerina) provide confidence for this deeper target. The deeper Cib Haz interval is contained in the same trapping mechanism as the proven Miogyp reservoir. It is thus considered by the operator to have a high probability of success, although it remains an exploration target. Seismic data indicate substantially thicker reservoir sand over a larger area in the deeper reservoir.

The Jumonville # 1 well has been put back on production. This well was shut-in for safety reasons during the transport and setting up of the H&P # 79 rig to drill Jumonville # 2 from the same drill pad. Current daily gross production is running at approximately 570 barrels of oil and 300 thousand cubic feet of natural gas. Production rates are being monitored to test the optimal flow rates from the reservoir now that the gas sales line is connected and production constraints have been removed.

The Acosta #1 well is reaching the end of its standard completion operation, including logging and a successful remedial cement squeeze. Production tubing is expected to be pressure tested and run-in shortly. The workover rig will be moved off and separation equipment put in place ready for perforation and flow testing of the Miogyp formation by the end of the week. Flow testing will be undertaken directly into the surface production facilities. 

Flow testing of the Acosta #1 Miogyp formation should provide further confirmation of the oil-water contact and reservoir thickness. Once testing at Acosta #1 is complete, further assessment of the potential reserves of the Miogyp formation will be undertaken.

The Vision Rice University #1 well operated by Vision Resources LLC is currently drilling below 14,170 ft measured depth. It is currently building angle in accordance with the well plan for the horizontal section of the well. On a trouble free basis it is estimated that wells in this venture should take approximately 75 days on average to drill, including both the vertical and horizontal sections. This well spudded on 12th November 2008. 

For further information on Pantheon Resources plc, see the website at www.pantheonresources.com

Further information:

Pantheon Resources plc

Jay Cheatham, CEO

+44 20 7484 5359

Oriel Securities Limited

Michael Shaw

+44 20 7710 7600

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
STRGRGDBRUGGGCL
Date   Source Headline
23rd Mar 20077:45 amRNSPadre Island Leases Update
15th Mar 20077:01 amRNSWilson Drilling Update
8th Mar 200711:45 amRNSProduction Update
6th Mar 20071:46 pmRNSHolding(s) in Company
2nd Mar 20077:30 amRNSExploration Update
26th Feb 20078:01 amRNSExploration update
13th Feb 20079:51 amRNSCaddo Onstream/Wharton update
9th Feb 20073:36 pmRNSAGM Statement
8th Feb 20079:39 amRNSSpudding of Wilson Prospect
5th Feb 20073:43 pmRNSHolding(s) in Company
1st Feb 20074:39 pmRNSHolding(s) in Company
1st Feb 20079:14 amRNSUpdate on Wilson Prospect
29th Jan 20074:13 pmRNSHolding(s) in Company
10th Jan 20077:00 amRNSDrilling Report
9th Jan 20078:40 amRNSDrilling Report
2nd Jan 20077:08 amRNSSpudding of Kant
2nd Jan 20077:04 amRNSPlum Deep Drilling Update
28th Dec 200610:29 amRNSAnnual Report and Accounts
27th Dec 200610:50 amRNSFinal Results
21st Dec 20067:01 amRNSPadre Island Testing Update
19th Dec 20067:01 amRNSProject Wharton Update
18th Dec 200610:27 amRNSTotal Voting Rights
13th Dec 20067:01 amRNSPadre Island Testing Update
5th Dec 20067:46 amRNSPlum Deep Testing Programme
30th Nov 20067:01 amRNSPlum Deep Well Logs Completed
20th Nov 20069:13 amRNSDrilling Update
16th Nov 20067:02 amRNSPlum Deep Drilling Update
7th Nov 20067:01 amRNSDrilling Update-Padre Island
31st Oct 20069:43 amRNSDrilling Report
27th Oct 20067:00 amRNSDrilling update- Padre Island
19th Oct 20068:32 amRNSPlum Deep Drilling Update
17th Oct 20069:01 amRNSCaddo #1 Well Result
11th Oct 20067:00 amRNSPlum Deep Drilling Update
9th Oct 20067:00 amRNSDrilling update
5th Oct 20067:00 amRNSSpudding of Caddo
4th Oct 20067:00 amRNSPlum Deep Drilling Update
3rd Oct 20067:50 amRNSZebu brought on-stream
3rd Oct 20067:15 amRNSSpudding of Mohawk prospect
3rd Oct 20067:00 amRNSZebu brought on-stream
29th Sep 200612:50 pmRNSDakota Well Result
26th Sep 20063:55 pmRNSPlum Deep Drilling Update
21st Sep 20067:02 amRNSSpudding of Dakota
19th Sep 20067:02 amRNSPlum Deep Drilling Update
12th Sep 20067:01 amRNSDrilling Report
5th Sep 20067:04 amRNSPlum Deep Drilling Update
29th Aug 20067:40 amRNSDrilling Update- Padre Island
23rd Aug 200612:49 pmRNSPlum Deep Drilling Update
23rd Aug 20067:01 amRNSZebu Production Test Result
10th Aug 20067:00 amRNSZebu Drilling Update
9th Aug 20067:00 amRNSPlum Deep Drilling Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.