Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPantheon Resources plc Regulatory News (PANR)

Share Price Information for Pantheon Resources plc (PANR)

Share Price is delayed by 15 minutes
Get Live Data
13.99    0.47 (3.48%)
Bid:
13.89
Ask:
14.25
Spread: 0.36 (2.592%)
Market Cap: £203.96m
PANR Live PriceLast checked at - London Stock Exchange

Intraday Pantheon Resources plc Share Chart

Operational Update

6 Jan 2009 08:00

RNS Number : 1614L
Pantheon Resources PLC
06 January 2009
 



Press release

 06 January 2009

Pantheon Resources plc - Operational Update

Pantheon Resources plc ("Pantheon" or the "Company"), the AIM-quoted oil and gas exploration company active in the Gulf of Mexicoprovides the following operational update:

The Jumonville #2 well commenced drilling on 25th December 2008. Surface casing has been set at 3,600 feet ("ft"). The well is currently drilling ahead to the kick-off point for the directional portion of the borehole. Planned total depth is approximately 14,200ft. Drilling is expected to take approximately 60 days to reach total depth. 

The Jumonville #2 well's primary target is the deeper Cib Haz interval. It will also delineate the Miogyp reservoir at a distance some 1,500 ft to the west of Jumonville #. This well should provide further data for reserve assessment. It is also planned to test the Camerina formation in the offset drilling at Jumonville #2. 

Discoveries in the two objectives above the Cib Haz (Miogyp and Camerina) provide confidence for this deeper target. The deeper Cib Haz interval is contained in the same trapping mechanism as the proven Miogyp reservoir. It is thus considered by the operator to have a high probability of success, although it remains an exploration target. Seismic data indicate substantially thicker reservoir sand over a larger area in the deeper reservoir.

The Jumonville # 1 well has been put back on production. This well was shut-in for safety reasons during the transport and setting up of the H&P # 79 rig to drill Jumonville # 2 from the same drill pad. Current daily gross production is running at approximately 570 barrels of oil and 300 thousand cubic feet of natural gas. Production rates are being monitored to test the optimal flow rates from the reservoir now that the gas sales line is connected and production constraints have been removed.

The Acosta #1 well is reaching the end of its standard completion operation, including logging and a successful remedial cement squeeze. Production tubing is expected to be pressure tested and run-in shortly. The workover rig will be moved off and separation equipment put in place ready for perforation and flow testing of the Miogyp formation by the end of the week. Flow testing will be undertaken directly into the surface production facilities. 

Flow testing of the Acosta #1 Miogyp formation should provide further confirmation of the oil-water contact and reservoir thickness. Once testing at Acosta #1 is complete, further assessment of the potential reserves of the Miogyp formation will be undertaken.

The Vision Rice University #1 well operated by Vision Resources LLC is currently drilling below 14,170 ft measured depth. It is currently building angle in accordance with the well plan for the horizontal section of the well. On a trouble free basis it is estimated that wells in this venture should take approximately 75 days on average to drill, including both the vertical and horizontal sections. This well spudded on 12th November 2008. 

For further information on Pantheon Resources plc, see the website at www.pantheonresources.com

Further information:

Pantheon Resources plc

Jay Cheatham, CEO

+44 20 7484 5359

Oriel Securities Limited

Michael Shaw

+44 20 7710 7600

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
STRGRGDBRUGGGCL
Date   Source Headline
21st Jul 20098:05 amRNSBullseye Project Update
30th Jun 20097:00 amRNSCommercial Production at Jumonville #2
25th Jun 20097:55 amRNSCorporate Update
15th Jun 20098:01 amRNSDrilling Update - Bullseye Prospect
5th Jun 20097:16 amRNSDrilling Update
29th Apr 20094:29 pmRNSCorporate Update
22nd Apr 20098:20 amRNSDrilling Update
14th Apr 20097:56 amRNSDrilling Update
7th Apr 20098:00 amRNSDrilling Update
6th Apr 20098:43 amRNSDrilling Update Replacement
6th Apr 20098:15 amRNSDrilling Update
2nd Apr 20093:31 pmRNSHolding(s) in Company
1st Apr 20099:48 amRNSHolding(s) in Company
31st Mar 20099:10 amRNSOperational Update
30th Mar 200911:52 amRNSHalf Yearly Report
18th Mar 20099:34 amRNSHolding(s) in Company
9th Mar 200912:40 pmRNSHolding(s) in Company
27th Feb 200910:43 amRNSHolding(s) in Company
24th Feb 200911:59 amRNSCompletion of Vision Rice University #1 Well
22nd Jan 20097:41 amRNSOperational Update
6th Jan 20098:00 amRNSOperational Update
23rd Dec 20088:16 amRNSBullseye Update
18th Dec 20084:49 pmRNSHolding(s) in Company
16th Dec 20085:27 pmRNSDirector/PDMR Shareholding
15th Dec 20083:56 pmRNSResult of AGM
15th Dec 20087:56 amRNSAGM Statement
9th Dec 200810:29 amRNSOil encountered at Acosta #1 Well
21st Nov 20089:26 amRNSNotice of AGM
19th Nov 20087:00 amRNSFinal Results
13th Nov 20087:00 amRNSDrilling Update
30th Oct 20087:50 amRNSDrilling Update
20th Oct 20087:00 amRNSDrilling Report
8th Oct 20088:10 amRNSDrilling Update
3rd Oct 200812:30 pmRNSAppointment of Executive Director
29th Sep 20087:00 amRNSDrilling Update
25th Sep 20087:54 amRNSDrilling Update
16th Sep 200812:24 pmRNSResult of EGM
12th Sep 20089:32 amRNSHolding(s) in Company
9th Sep 20088:09 amRNSOperations Update
2nd Sep 200812:44 pmRNSHolding(s) in Company
1st Sep 20088:39 amRNSHolding(s) in Company
1st Sep 20087:35 amRNSDrilling Update
28th Aug 20089:12 amRNSDrilling update
26th Aug 20086:18 pmRNSHolding(s) in Company
26th Aug 200811:20 amRNSEGM Notice
26th Aug 20087:00 amRNSDrilling Update
18th Aug 20087:00 amRNSDrilling Update
14th Aug 200810:16 amRNSTotal Voting Rights
14th Aug 20087:47 amRNSDrilling Update
6th Aug 20085:42 pmRNSDirector/PDMR Shareholding

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.