Talon Resources Targets Ontario Gold Growth After AIM Move and Eagle Lake Acquisition, CEO Says. Watch here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPan African Resources Regulatory News (PAF)

Share Price Information for Pan African Resources (PAF)

Share Price is delayed by 15 minutes
Get Live Data
104.00    -5.20 (-4.76%)
Bid:
104.40
Ask:
104.50
Spread: 0.10 (0.096%)
Market Cap: £2.11b
PAF Live PriceLast checked at - London Stock Exchange

Intraday Pan African Resources Share Chart

Update on Operations and BTRP Mill Commissioning

24 May 2018 09:02

Pan African Resources Plc - Update on Operations and BTRP Mill Commissioning

Pan African Resources Plc - Update on Operations and BTRP Mill Commissioning

PR Newswire

London, May 24

Pan African Resources PLC

(Incorporated and registered in England and Wales under Companies Act 1985 with registered number 3937466 on 25 February 2000)

AIM Code: PAF

JSE Code: PAN

ISIN: GB0004300496

(“Pan African Resources” or the “Company” or the “Group”)

UPDATE ON OPERATIONS AND BTRP MILL COMMISSIONING

Further to the announcement published on 2 May 2018 in respect of the finalisation of Evander Gold Mining Proprietary Limited (“Evander Mines” or “Evander”) restructure and operational update,Pan African Resources advises shareholders as follows:

The commissioning of the Barberton Mines Tailings Retreatment Plant (“BTRP”) regrind mill will be completed during the current week, on schedule and on budget. The BTRP is expected to reach annualised gold production of 21,000 ounces in the next month, in line with previous guidance.

The Group has signed a retrenchment agreement with representative unions at Evander Mines, which governs the final terms of the retrenchment. The retrenchment process will therefore be completed as previously communicated, with several programmes implemented by Evander to assist retrenched employees.

The Elikhulu project construction (“Elikhulu”) remains ahead of schedule and below budget.

BTRP MILL COMMISSIONING

The construction of the regrind mill at the BTRP is complete and the commissioning process has commenced and will be completed in the next week. The mill enables the BTRP to sustain the annual production at approximately 21,000 ounces per annum. The construction of the regrind mill took five months and was completed on budget. The regrind mill was installed to reduce the coarseness of the material treated from the Harper Dump and will improve material handling and recoveries going forward.

The 1.7 megawatt, 4.3 metre by 4.9 metre, Veecor regrind mill was constructed in record time by Barberton Mines, with New Concept Projects as the main subcontractor to DRA Global, which was responsible for the mill refurbishment and installation.

FINALISATION OF THE EVANDER MINES SECTION 189 PROCESS

Pan African Resources has concluded the Section 189 process in terms of the South African Labour Relations Act, 66 of 1995 (“Section 189 Process”) and signed a retrenchment agreement with the recognised unions of Evander Mines. The retrenchment cost will be approximately R160 million and will be funded from the Group’s existing debt facilities and internal resources.

As previously communicated, the retrenched employees will be provided with opportunities for reskilling and the Group is in the process of identifying employment opportunities for retrenched employees, both internally and with potential external employers.

Separately, the Group is at an advanced stage of reviewing the technical and commercial merits of mining the remainder of Evander’s 8 shaft pillar. This may extend the final closure date of the shaft, generate positive cash flows and assist with further employment opportunities for those affected by the Section 189 Process. Further information on the findings of the Evander 8 shaft pillar initiative will be communicated to shareholders in the near future.

UPDATE ON ELIKHULU CONSTRUCTION

The construction of Elikhulu remains ahead of schedule, with first gold production expected in August 2018, and full commissioning at the end of September 2018. Elikhulu’s capacity will be increased by 200,000 tonnes to 1.2-million tonnes per month with effect from December 2018, by incorporating the existing Evander Tailing Retreatment Plant (“ETRP”) throughput with the associated economies of scale and enhanced recovery benefits. The increase in processing capacity will not affect the original construction schedule or first gold production expectations. In conjunction with the ETRP throughput, these two surface operations, once in full production, are expected to produce more than 70,000 ounces per annum.

Pan African’s Barberton and surface tailings operations uniquely positions the Group as a relatively low-cost producer with long-life, quality assets and attractive organic growth prospects.

The information contained in this announcement has not been reviewed or reported on by Pan African Resource’s auditors and is the responsibility of the directors of Pan African Resources.

For further information on Pan African Resources, please visit the Company’s website at www.panafricanresources.com

24 May 2018

Contact information
Corporate Office The Firs Office Building 1st Floor, Office 101 Cnr. Cradock and Biermann Avenues Rosebank, Johannesburg South Africa Office: + 27 (0) 11 243 2900 Facsimile: + 27 (0) 11 880 1240Registered Office Suite 31 Second Floor 107 Cheapside London EC2V 6DN United Kingdom Office: + 44 (0) 207 796 8644 Facsimile: + 44 (0) 207 796 8645
Cobus Loots Pan African Resources PLC Chief Executive Officer Office: + 27 (0) 11 243 2900 Deon Louw Pan African Resources PLC Financial Director Office: + 27 (0) 11 243 2900
Phil Dexter St James's Corporate Services Limited Company Secretary Office: + 44 (0) 207 796 8644John Prior / Paul Gillam Numis Securities Limited Nominated Adviser and Joint Broker Office: +44 (0) 20 7260 1000
Sholto Simpson One Capital JSE Sponsor Office: + 27 (0) 11 550 5009Ross Allister/James Bavister/David McKeown Peel Hunt LLP Joint Broker Office: +44 (0) 207 418 8900
Julian Gwillim Aprio Strategic Communications Public & Investor Relations SA Office: +27 (0)11 880 0037 Jeffrey Couch/Neil Haycock/Thomas Rider BMO Capital Markets Limited Joint Broker Office: +44 (0) 207 236 1010
Bobby Morse Buchanan Public & Investor Relations UK Office: +44 (0)20 7466 5000 Email: PAF@buchanan.uk.com
Website: www.panafricanresources.com
Date   Source Headline
19th Jun 201810:30 amPRNHolding(s) in Company
13th Jun 20184:40 pmRNSSecond Price Monitoring Extn
13th Jun 20184:35 pmRNSPrice Monitoring Extension
4th Jun 201811:04 amPRNHolding(s) in Company
31st May 20187:00 amPRNDisposal of Pan African Resources shares by PAR Gold
31st May 20187:00 amPRNHolding(s) in Company
24th May 20189:02 amPRNUpdate on Operations and BTRP Mill Commissioning
23rd May 201810:16 amPRNHolding(s) in Company
17th May 20181:23 pmPRNHolding(s) in Company
11th May 201812:07 pmRNSSecond Price Monitoring Extn
11th May 201812:02 pmRNSPrice Monitoring Extension
2nd May 20183:00 pmPRNFinalisation of Evander Mines Restructure & OP Update
30th Apr 201812:02 pmRNSPrice Monitoring Extension
26th Apr 201812:00 pmPRNHolding(s) in Company
12th Apr 20181:32 pmPRNHolding(s) in Company
28th Mar 20187:00 amPRNOperational Update
23rd Mar 20181:32 pmPRNHolding(s) in Company
20th Mar 201810:39 amPRNHolding(s) in Company
16th Mar 20184:40 pmRNSSecond Price Monitoring Extn
16th Mar 20184:35 pmRNSPrice Monitoring Extension
2nd Mar 20187:00 amPRNOperational Update
27th Feb 201812:01 pmPRNResponse to NUM
26th Feb 20187:00 amPRNHolding(s) in Company
23rd Feb 201812:05 pmPRNDirector/PDMR Shareholding
23rd Feb 201812:03 pmPRNDirector/PDMR Shareholding
23rd Feb 201811:22 amPRNHolding(s) in Company
23rd Feb 201811:19 amPRNHolding(s) in Company
23rd Feb 201811:16 amPRNHolding(s) in Company
13th Feb 20187:00 amPRNInterim Results for the 6 months ended 31 Dec 2017
8th Feb 20182:00 pmPRNHolding(s) in Company
7th Feb 20183:00 pmPRNWithdrawal of Cautionary Announcement
1st Feb 20188:21 amPRNOperational Update & Trading Statement
29th Jan 201812:30 pmPRNCautionary Announcement
15th Dec 20179:00 amPRNBEE Ownership Restructuring
22nd Nov 20177:00 amPRNResult of AGM & Salient Dividend Dates
7th Nov 20177:00 amPRNFulfilment of all Conditions Precent - Phoenix Platinum
6th Nov 20173:35 pmPRNHolding(s) in Company
30th Oct 20176:00 amPRNNotice of AGM & No Change Statement
26th Oct 20172:32 pmPRNHolding(s) in Company
18th Oct 20177:00 amPRNBarberton Mines Wage Agreement
12th Oct 20177:00 amPRNDirector/PDMR Shareholding
11th Oct 20173:46 pmPRNHolding(s) in Company
5th Oct 20171:16 pmPRNHolding(s) in Company
2nd Oct 20174:00 pmPRNDirector/PDMR Shareholding
2nd Oct 20177:00 amPRNHolding(s) in Company
29th Sep 20174:15 pmPRNDirector/PDMR Shareholding
28th Sep 201712:50 pmPRNHolding(s) in Company
27th Sep 20174:12 pmPRNDirector/PDMR Shareholding
20th Sep 20177:01 amPRN2017 Abridged Mineral Resource & Mineral Reserve Report
20th Sep 20177:00 amPRNFinal Results & Proposed Final Dividend Announcement

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.