George Frangeskides, Chairman at ALBA, explains why the Pilbara Lithium option ‘was too good to miss’. Watch the video here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPan African Regulatory News (PAF)

Share Price Information for Pan African (PAF)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 24.80
Bid: 24.65
Ask: 24.80
Change: 0.55 (2.27%)
Spread: 0.15 (0.609%)
Open: 24.40
High: 24.80
Low: 24.25
Prev. Close: 24.25
PAF Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

2017 Abridged Mineral Resource & Mineral Reserve Report

20 Sep 2017 07:01

Pan African Resources Plc - 2017 Abridged Mineral Resource & Mineral Reserve Report

Pan African Resources Plc - 2017 Abridged Mineral Resource & Mineral Reserve Report

PR Newswire

London, September 19

Pan African Resources PLC(Incorporated and registered in England and Wales under Companies Act 1985 with registered number 3937466 on 25 February 2000)Share code on AIM: PAFShare code on JSE: PANISIN: GB0004300496(“Pan African Resources” or the “Company” or the “Group”)

2017 Abridged Mineral Resource & Mineral Reserve Report

Pan African Resources, the African focused precious metals producer, is pleased to announce that the 2017 Abridged Mineral Resource and Mineral Reserve Report (“MR&MR”) has been published and is available on the Company's website at www.panafricanresources.com. A summary of the MR&MR, including the Group Mineral Resource and Mineral Reserve statement as at 30 June 2017, has been provided below.

Overview

1.2 million ounces (“Moz”) or 12.0% gross annual increase in Group gold reserves to 11.2Moz (2016: 10.0Moz). 0.5Moz or 1.4% gross annual decrease in Group gold resources to 34.4Moz (2016: 34.9Moz). No material change in Group platinum group elements (“PGE”) resource, 0.6Moz (2016: 0.6Moz). No material change in Group PGE reserve, 0.2Moz (2016: 0.2Moz). Disposal of Uitkomst Colliery Proprietary Limited to Coal of Africa Limited on 30 June 2017. No Group coal resources and reserves stated. Following positive mineral resource (2.0Moz) to mineral reserve (1.7Moz) conversion and the definitive feasibility results of the Evander Gold Mining Proprietary Limited (“Evander Mines”) tailings storage facilities re-mining projects (“Elikhulu Project”), the Company has mandated DRA Projects SA Proprietary Limited (“DRA Projects”) to commence construction of the project. The life of mine (“LOM”) for Elikhulu Project is stated at 14 years, yielding approximately 56 000oz a year for the initial 8 years of production and then approximately 45 000oz per annum for the remaining 6 years. Focused mineral reserve conversion at Barberton Mines Proprietary Limited (“Barberton Mines”) through the development of the sub-vertical shaft project at its Fairview operation, thereby increasing overall capacity and production from the main reef complex (“MRC”) section by 7 000 – 10 000oz per annum and sustaining the LOM at Barberton Mines to 20 years. Surface exploration drilling progressed well at Evander Mines targeting the 2010 Pay Channel. A feasibility study on exploiting the surrounding pillars at Evander Mines’ No 7 Shaft and the 2010 Pay Channel resources is expected to be completed during the first quarter of the 2018 financial year. Evander Mines and the current Evander Tailings Retreatment Plant (“ETRP”) LOM stated at 15 years. SRK Consulting (Pty) Ltd has independently reviewed the Mineral Resources and Mineral Reserves of the Pan African Resources’ gold assets as at 30 June 2017 and signed off on the declared estimates.

Gold

Group Gold Mineral Resources

The Group’s attributable gold Mineral Resources decreased from 34.9Moz at 30 June 2016 to 34.4Moz at30 June 2017, equating to an annual decrease of 0.5Moz, or 1.4%.

Contained gold
As at 30 June 2017CategoryTonnes millionGrade g/tTonnesMoz
Mineral ResourcesMeasured5.310.9457.61.9
Indicated262.22.43636.220.4
Inferred70.45.35376.512.1
Pan African ResourcesTotal337.93.171 070. 334.4

Group Gold Mineral Reserves

The Group’s attributable Mineral Reserves increased from 10.0Moz at 30 June 2016 to 11.2Moz at30 June 2017, equating to an annual increase of 1.2Moz, or 12.0%.

Contained gold
As at 30 June 2017CategoryTonnes millionGrade g/tTonnesMoz
Mineral ReservesProved4.17.1929.81.0
Probable227.71.40317.910.2
Pan African ReservesTotal231.81.50347.711.2

The increase can primarily be attributed to the conversion of the Elikhulu Project Mineral Resources to Mineral Reserves.

Platinum Group Elements

Group PGE Mineral Resources

The Group’s attributable PGE Mineral Resources did not change materially for the year under review.

Contained PGEs 4E
As at 30 June 2017CategoryTonnes millionGrade g/tTonnesMoz
Mineral ResourcesMeasured
Indicated2.32.325.40.2
Inferred3.43.6712.50.4
Pan African ResourcesTotal5.73.1217.90.6

Group PGE Mineral Reserves

The Group’s attributable PGE Mineral Reserves did not change materially for the year under review.

Contained PGEs 4E
As at 30 June 2017CategoryTonnes millionGrade g/tTonnesMoz
Mineral ReservesProved
Probable2.32.325.40.2
Pan African ReservesTotal2.32.325.40.2

Group organic growth

Current exploration drilling as well as activities to access and develop our orebodies was maintained during the financial year. The strategy of converting Mineral Resource to Mineral Reserve was progressed by moving organic projects further up the mining value chain towards feasibility or production. The tables below reflect the progress of near-mine growth projects that have contributed ounces to the Mineral Resource for the year.

Group: Exploring the orebody - exploration drilling

OperationTotal metresNumber of boreholesAverage channel width cmNumber of intersections above cut-offAverage grade g/tTotal expenditure R’million
Barberton Mines8,79310613634174.7
Evander Mines78314316281.4

Group: Accessing the orebody - on-reef development

OperationTotal on-reef development metresAverage grade g/t
Barberton Mines2,5336.20
Evander Mines24528.86

Barberton Mines: Developing the orebody - capital ore reserve projects

Project2017 metres2016 metres2015 metresPotential resource target oz
Sheba – pillar development45054082410,101
Sheba – Edwin Bray to Thomas and Joe’s Luck area827518,701
Fairview – 11 Level Royal ReefEquippingEquipping826
Fairview – 1# one reserve opening711318413,958
Fairview – No 3 Shaft deepening171642622,943
Fairview – (64 – 68) Level451581447851,562
New Consort – (33 – 45) PC26538725810,000
New Consort – MMR pillar development866,309
New Consort – No 3 Shaft173275,969
Royal Sheba143189165309,180
Sheba Western Cross413329525,143

Evander Mines: Developing the orebody - capital ore reserve projects

Project2017 metres2016 metres2015 metresPotential resource target oz
No 2 Decline 24 – 25 Level733569041,200,000
25 A block ventilation2228710

Group growth projects

Elikhulu Project

The Elikhulu Project entails establishing facilities and infrastructure at Evander Mines, owned and operated by Pan African Resources, to retreat gold plant tailings at a rate of 1-million tonnes per month. This is in addition to the existing production from the ETRP, which will continue to operate independently of the Elikhulu Project for the next 15 years. Three existing tailings storage facilities will be reclaimed, in the following order: Kinross, Leslie and Winkelhaak. The 3 tailing facilities will, post their processing, be consolidated into a single enlarged Kinross facility, thus reducing Evander Mines’ environmental footprint and associated environmental impact.

The project is expected to yield approximately 56,000oz of gold per annum for the initial 8 years of production (while treating the Kinross and Leslie tailings storage facilities), and then approximately 45,000oz a year for the project’s remaining 6 years from processing the Winkelhaak tailings storage facility. These production figures exclude an inferred resource of 244,398 ounces of gold delineated in the soil material beneath the existing tailing dumps.

Mineral Resource estimate

Mineral Resource categoryTailings storage facilityTonnes millionGrade g/tContained gold Moz
IndicatedKinross51.030.310.51
Winkelhaak72.470.240.56
Leslie70.070.320.71
193.570.291.79
Inferred (soil)Kinross9.230.330.10
Winkelhaak8.020.270.07
Leslie4.570.450.08
Total21.830.330.24
Total Mineral Resource*215.400.292.03

Mineral reserve estimate

Mineral Reserve categoryTailings storage facilityTonnes millionGrade g/tContained gold Moz
ProbableKinross45.20.310.4
Leslie70.10.320.7
Winkelhaak70.00.240.6
Total Mineral Reserve*185.30.291.7

* Inclusive of ETRP

The Mineral Reserve estimate is a probable 185.3Mt, comprised of the Kinross (45.2Mt), Leslie (70.1Mt) and Winkelhaak (70.0Mt) tailings storage facilities at Evander Mines. The combined 185.3Mt will provide feed material to the existing ETRP at 200,000 tonnes per month, and to the new project process plant at a rate of one million tonnes per month (of which 40,000 tonnes per month will be from run-of-mine tailings).

The combined Mineral Reserve contains an estimated 1.7Moz, of which an estimated 688,000oz will be recovered over the life of the project. This estimate excludes the inferred resource 244,398oz of gold leached and contained in the soil beneath the existing tailing dumps, which could potentially increase the project life.

The Mineral Reserve estimate assumes a non-selective mining method whereby the whole of the mineral deposit is mined in a predetermined sequence. The mining method allows for 100% extraction of the targeted mineral deposit. Hydraulic mining has been selected as the mining method as it is a proven technology, cost effective and technically and operationally well understood.

The overall average gold recovery over the life of the project is forecast at 47.8%. Using modelled recoveries, the gold dissolution value estimated for Kinross is 51.4%, Leslie 48.3% and Winkelhaak 53.8%.

The Elikhulu Project is progressing according to plan with project completion and first gold expected in the last quarter of the 2018 calendar year.

Barberton Mines sub-vertical shaft project at Fairview mine

The Fairview mining operation is currently restricted by the hoisting capacity of its No 3 Decline, which is used to access workings below 42 Level. This decline is currently used to transport employees and material, and for rock hoisting. The 11-Block, or MRC, orebody has an average grade of 31.3 g/t and current LOM of 20 years. With no intervention, future mining at depth will result in increased travelling distance, reduce employee face time and cause a lack of capacity to ensure both ore replacement and exploration development.

Pan African Resources, with the assistance of DRA Projects, has completed a feasibility study on the construction of a raise-bored, sub-vertical shaft from Fairviews’ 42 Level to 64 Level, with the potential of continuing the vertical shaft to 68 Level in future. This sub-vertical shaft will be used to transport employees and material to the working areas, which will allow the No 3 Decline to be used exclusively for rock hoisting, increasing overall capacity and production from this mining area.

DRA Projects has reviewed the technical and commercial aspects of the project and the supporting feasibility study has yielded very positive results. The estimated capital expenditure for the project, including contingencies, is approximately R105 million, to be incurred over a 2-year period. The productivity improvements for Fairview are estimated to yield an additional 7,000oz of gold per annum, which can be optimised further to more than 10,000oz per annum.

Contained gold
CategoryTonnes millionGrade g/tTonnesMoz
Mineral ResourceMeasured1.0810.9211.260.38
Indicated1.0614.1314.970.48
Inferred2.6814.9039.931.28
Fairview MineTotal4.8213.7966.162.14

Contained gold
CategoryTonnes millionGrade g/tTonnesMoz
Mineral ReserveProved0.5110.056.680.21
Probable1.5013.8918.280.58
Fairview MineTotal2.0112.4224.960.79

Evander mines No 7 Shaft No 3 decline and 2010 Pay Channel

The 2010 Pay Channel resource is adjacent to the No 7 Shaft infrastructure and extends from the boundary of Taung Gold International Limited’s No 6 Shaft project and mining rights. As previously reported, Evander Mines embarked on an exploration programme to drill a further exploration borehole from surface, to increase geological confidence in the 2010 Pay Channel orebody, for which resources are summarised in the table below:

Contained gold
CategoryTonnes millionGrade g/tTonnesMoz
Measured0.458.944.00.13
Indicated0.707.115.00.16
Inferred4.138.9336.91.19
Total5.288.6945.91.48

On 6 July 2017, the exploration borehole successfully intersected the Kimberley reef at a depth of approximately two kilometres, highlighting a reef intersection with a 6cm width at 36.8g/t. Additional drilling deflections will be performed to further delineate the ore body. The previous borehole into the 2010 Pay Channel yielded a reef intersection with a 49cm width at 36.04g/t.

Grades
BoreholeDepth mCore width cmg/tcmg/t
22452 059.349.036.041 766
EGM PAR 12 014.65.736.8210
EGM PAR 1-Deflection 1 2014.95.733.2189
EGM PAR 1-Deflection 2 2 014.84.8144.7694

Harmony Gold Mining Company Limited previously developed the No 7 Shaft mine workings towards the 2010 Pay Channel. However due to financial constraints and a reassessment of capital expenditure priorities, it halted all development on the Evander Mines’ shafts (other than No 8 Shaft) in 2009. This resulted in the controlled flooding of the development ends and No 7 Shaft’s No 3 Decline, from 22 Level up to 18 Level. Following the dewatering, only standard footwall and on-reef development would need to be completed, with the associated engineering infrastructure, before mining can commence.

The 2010 Pay Channel is approximately 4.5 kilometres in tramming distance from No 7 Shaft, which is currently used by Evander Mines for hoisting to the Kinross metallurgical plant. This compares favourably with the No 8 Shaft mining areas, which is approximately 12 kilometres in tramming distances from No 7 Shaft.

The Pan African Resources’ project team has commenced a feasibility study related to the No 7 Shaft No 3 Decline and the 2010 Pay Channel resource, which will address the following critical issues:

Collation of geological data from the drill-hole intersection and deflections. The cost and timing of dewatering and re-equipping the No 7 Shaft No 3 Decline from 18 Level to 22 Level. The development cost and timing to access the 2010 Pay Channel. The economic viability of the project.

The 2010 Pay Channel can potentially increase Evander Mines’ underground gold production materially at a relatively low capital cost, using Evander Mines’ established shaft and metallurgical facilities. The feasibility study for the project is expected to be completed during the first quarter of the 2018 financial year.

Reporting in compliance with SAMREC Code

To meet the requirement of the South African Code for the Reporting of Exploration Results, Mineral Resources and Mineral Reserves (“SAMREC Code”) that the material reported as a Mineral Resource should have “reasonable and realistic prospects for eventual economic extraction”, Pan African Resources has determined an appropriate cut-off grade which has been applied to the quantified mineralised body. In determining the cut-off grade, Pan African Resources uses a gold price of R600 000/kg. At Pan African Resources’ underground mines, the optimal cut-off is defined as the lowest grade at which an orebody can be mined such that the total profits, under a specified set of mining parameters, are maximised. The Mineral Resource optimiser tool that was accordingly developed in-house was applied to the Mineral Resource inventory.

The optimiser programme requires the following inputs to convert the Mineral Resource to the Mineral Reserve:

the database inventory of all mineral resource blocks; an assumed gold price – ZAR550 000/kg; planned production rates for each mine; mine call factor; plant recovery factors; and planned cash operating costs.

The Mineral Reserves represent that portion of the Measured and Indicated Mineral Resources above cut-off in the LOM plan, and have been estimated after consideration of the modifying factors affecting extraction. A range of disciplines has been involved at each mine in the LOM planning process including geology, surveying, planning, mining engineering, rock engineering, metallurgy, financial management, human resources management and environmental management.

Note: Mineral Resources are inclusive of the Mineral Reserve, unless otherwise stated. Rounding of numbers contained in this announcement may result in minor computational discrepancies.

Competent Person

The competent person for Pan African Resources, Mr Barry Naicker, the group Mineral Resource Manager, signs off the MR&MR for the Group and has reviewed and approved the information contained in this announcement in writing. He is a member of the South African Council for Scientific Professions (400234/10). Mr Naicker has 16 years of experience in economic geology and mineral resource management.

He is based at 1st Floor, The Firs, cnr. Cradock and Biermann Avenues, Rosebank, 2196, Gauteng.

Johannesburg20 September 2017

Contact Information

Corporate OfficeThe Firs Office Building1st Floor, Office 101Cnr. Cradock and Biermann AvenuesRosebank, JohannesburgSouth AfricaOffice: + 27 (0) 11 243 2900Facsimile: + 27 (0) 11 880 1240

Registered OfficeSuite 31Second Floor107 CheapsideLondonEC2V 6DNUnited KingdomOffice: + 44 (0)20 7796 8644Facsimile: + 44 (0)20 7796 8645

Cobus LootsDeon Louw
Pan African Resources PLCPan African Resources PLC
Chief Executive OfficerFinancial Director
Office: + 27 (0)11 243 2900Office: + 27 (0) 11 243 2900

Phil DexterJohn Prior / Paul Gillam / James Black
St James's Corporate Services LimitedNumis Securities Limited
Company SecretaryNominated Adviser & Joint Broker
Office: + 44 (0)20 7796 8644Office: +44 (0)20 7260 1000

Sholto SimpsonMatthew Armitt / Ross Allister
One CapitalPeel Hunt LLP
JSE SponsorJoint Broker
Office: + 27 (0)11 550 5009Office: +44 (0)020 7418 8900

Jeffrey Couch / Neil Haycock / Thomas RiderBMO Capital Markets LimitedJoint BrokerOffice: +44 (0)20 7236 1010

Julian GwillimAprio Strategic CommunicationsPublic & Investor Relations SAOffice: +27 (0)11 880 0037

www.panafricanresources.com

Date   Source Headline
14th Feb 20247:00 amPRNUnaudited Interim financial results for the six months ended 31 december 2023
2nd Feb 20247:00 amPRNTrading Statement
29th Jan 20243:45 pmPRNHolding(s) in Company
22nd Jan 20247:00 amPRNOperational Update for the Half Year ended 31 December 2023 (H1 FY2024)
7th Dec 202310:00 amPRNHolding(s) in Company
24th Nov 20237:00 amPRNResult of AGM & Salient Dividend Dates
22nd Nov 20237:00 amPRNInterim Production Update for half year ending 31 December 2023
10th Nov 202312:15 pmPRNDirector/PDMR Shareholding
10th Nov 202312:15 pmPRNDirector/PDMR Shareholding
8th Nov 20232:45 pmPRNDirector/PDMR Shareholding
7th Nov 20231:30 pmPRNDirector/PDMR Shareholding
31st Oct 20237:00 amPRNNotice of AGM & Abridged Annual Financial Statements for the year ended 30 June 2023
30th Oct 20232:00 pmPRNDirector/PDMR Shareholding
30th Oct 20232:00 pmPRNDirector/PDMR Shareholding
13th Sep 20237:00 amPRNProvisional summarised audited results for the year ended 30 June 2023
5th Sep 202311:45 amPRNHolding(s) in Company
1st Sep 20237:00 amPRNTrading Statement for the year ended 30 June 2023
7th Aug 20237:00 amPRNOperational Update for the year ended 30 June 2023
1st Aug 20239:10 amPRNUpdate to Commissioning Date of the Mintails Project
1st Aug 20237:24 amPRNMintails Project Funding Closed and Granting of Integrated Environmental Authorisation
1st Jun 20227:00 amPRNAppointment of Berenberg as Joint Broker
12th Apr 20227:00 amPRNTransaction in Own Shares
11th Apr 20227:00 amPRNHolding(s) in Company
7th Apr 20227:00 amPRNTransaction in Own Shares
4th Apr 20227:07 amPRNTransaction in Own Shares
1st Apr 20227:00 amPRNShare Buyback Programme
14th Mar 20227:00 amPRNGold Exploration Programme in Sudan
7th Mar 20229:30 amPRNHolding(s) in Company
7th Mar 20227:00 amPRNHolding(s) in Company
2nd Mar 20227:00 amPRNHolding(s) in Company
16th Feb 20227:00 amPRNUnaudited Interim Results for 6m to 31 Dec 2021
19th Jan 20227:00 amPRNOperational Update - 31 Dec 2021
17th Jan 202212:45 pmPRNHolding(s) in Company
31st Dec 202112:41 pmRNSSecond Price Monitoring Extn
31st Dec 202112:35 pmRNSPrice Monitoring Extension
15th Dec 20217:00 amPRNAcquisition: Blyvoor Gold Surface Tailings
6th Dec 20219:00 amPRNSecondary Listing on A2X Markets
3rd Dec 20217:00 amPRNRetraction of TR-1 Form
1st Dec 20217:00 amPRNHolding(s) in Company
30th Nov 20217:00 amPRNNew Revolving Credit Facility Becomes Effective
26th Nov 20217:00 amPRNResult of AGM and Salient Dividend Dates
29th Oct 20217:01 amEQSPan African Resources (PAF): Everything falling into place
27th Oct 20218:30 amPRNNotice of AGM & No Change Statement
1st Oct 20211:30 pmPRNDirector/PDMR Shareholding
22nd Sep 20211:00 pmPRNDirector/PDMR Shareholding
21st Sep 20217:00 amPRNDirectorate Change
20th Sep 20212:30 pmPRNCOO Seriously Injured
16th Sep 20211:00 pmPRNDirector/PDMR Shareholding
15th Sep 202112:00 pmPRNDirector/PDMR Shareholding
15th Sep 20217:00 amRNSProvisional summarised audited year end results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.