Amantaytau Update

23 Jun 2008 07:00

RNS Number : 2462X
Oxus Gold PLC
23 June 2008
 

Oxus Gold plc announces Positive Bankable Feasibility Study for Amantaytau Goldfields Underground Sulphide Project in Uzbekistan

London: June 23, 2008

Oxus Gold plc (ticker AIM: OXS.L), the Uzbekistan gold and silver producer, today announces the results of a Bankable Feasibility Study (BFS) compiled by Wardell Armstrong International on its Underground Sulphide Project at its 50% owned Amantaytau Goldfields Joint Venture (AGF).

Highlights

Development of a 1.2mtpa underground gold mine and process plant based on the current reserves at the Severny and Centralny ore deposits is technically and commercially feasible

The Project will exploit a reserve of 1.74Moz within a resource of 2.99Mozover an initial 7 year life at the Sulphide Project, producing up to 270,000 oz gold per annum

Significant upside potential for extended life and increased reserves as the deposit is open-ended at depth with indications of occurrence of high grade mineralisation

Further geotechnical work is planned prior to underground development in order to investigate the use of lower cost mining methods than the currently planned cut and fill stoping

Total costs are an average of US$ 402 per oz gold produced over the initial 7 year life of mine, including operating taxes, royalties and management fees: the Project is in the midrange on the cost curve of gold producers and is regarded as very robust with potential for further improvement

Ungeared after tax NPV for the Project is US$ 329 million at 7% discount rate per annum, the IRR is 50% and the payback is 24 months from start of production, anticipated in Q3 2009

The Project is an extension and expansion of the existing and ongoing oxide production of approximately 70,000 oz gold equivalent per annum and therefore benefits from the existing infrastructure, existing skilled labour force and management's experience of operating in the area

The Royal Bank of Scotland plc (RBS) has been appointed as lead arranger for a limited recourse senior debt facility. Oxus anticipates 100% debt funding for the Project, thereby eliminating shareholder dilution: RBS has received the BFS and is reviewing it as part of its due diligence ahead of loan documentation

Speaking today, Chief Executive Officer Mr Richard Wilkins said: 

"In light of these robust financial indicators, Amantaytau Goldfields is proceeding with the Project implementation including the commencement of purchasing long-lead items, and start-up of initial site works.

Commissioning of the plant is expected by Q3 2009 with production level of 750,000tpa, increasing to 1.2mtpa by mid 2010. 200,000oz of gold will be produced in 2010 and 270,000oz in 2011.

Since receiving Cabinet of Ministers approval to proceed with the Project last December I am delighted with the progress that we have subsequently made including the completion of this Bankable Feasibility Study. With first sulphide production forecast for Q3 2009, Oxus is poised to quadruple its production over the next 3 years and transform itself from a junior mining company into a mid-tier producer."

Project Description

The Project is located at the existing AGF mine site in the Navoi District of Uzbekistan, some 30 km south east of the town of Zarafshan and 25 km south west of the very large Muruntau gold mine.

The BFS is based only on the current sulphide reserves of the Severny and Centralny deposits and has not taken into account possible future production from the Inferred resource portion of the deposits nor any potential future resources at depth. An exploration programme is planned for these potential targets to increase the resources and then convert them into reserves.

The Project will be an underground mining operation accessed via 2 parallel declines, with the portals located in the northernmost location at the base of the existing Centralny Pit No 1 where the oxide ore has been mined out.

The mine design mainly utilises cut and fill mining methods with limited sub-level open stoping. The cut and fill mining method results in high physical extraction ratios and minimal dilution but is relatively expensive. Post BFS geotechnical work will be undertaken prior to underground development with a view to improving the economics further and reducing the production cost per ounce.

Production of sulphide ore will replace the Centralny open pit oxide ore which is virtually exhausted. Production from oxide ore will continue at the Vysokovoltnoye and Asaukak heap leach plants at a rate of 70,000 oz gold equivalent per annum.

The ore will be processed using bio-oxidation technology provided by Gold Fields, South Africa. The existing carbon in pulp (CIP) plant will be modified to accept the sulphide ore. The existing milling, reagent handling, elution, electro-winning and smelting sections will be retained and upgraded while the leach feed thickener will be converted to accept flotation tails. The float concentrate will be bio-digested to break down the sulphide minerals, thickened and cyanide leached in a carbon in leach (CIL) section. The plant will be constructed in two phases.  Phase 1 will consist of a single flotation bank and two bio-oxidation modules designed to treat 750,000tpa of ore with the first module being commissioned by Q3 2009. Phase 2 will increase the plant capacity to 1.2mtpa and will be commissioned in mid 2010. Overall plant recovery of 88% has been used in the BFS based on 96% float and 92% CIL recovery.

Key Results of the Feasibility Study 

Mineral Resources

This BFS recognises the JORC classified Measured and Indicated resource base for the Amantaytau Severny and Centralny sulphides to total 13.5 million tonnes at 6.89g/t containing 93.06 tonnes of gold (2.99 million ounces)

Upside potential

Based on the wealth of data available from Soviet times and validated by Lonhro and Oxus, Oxus is confident that there is significant potential to increase the resource base substantially. Neither Centralny nor Severny has been closed off at depth and considerable potential exists for the delineation of mineralisation below existing development levels. A single deep drill hole at Amantaytau Severny intersected mineralisation at 870m below surface comprising a drilled width of 8m* at 51.6g/t (*estimated true width based on drill section is 1.73m).

Initial Mining Reserves

Based on the above resource, JORC classified Proven and Probable reserves have been estimated for stoping blocks within a 3.5g/t cut-off at Severny and a 2.0g/t cut-off at Centralny to be 8.94 million tonnes at 6.99g/t containing 62.5 tonnes of gold (2.01 million ounces).

The total reserve in this BFS for production scheduling is 7.16 million tonnes at 7.55g/t containing 54.0 tonnes of gold (1.74 million ounces).

Capital Costs

The initial capital funding requirements are summarised below:

US$  Million

Mine

 26.50

Process Plant

 60.30

Infrastructure

8.80

Indirect

21.60

Pre-production opex

40.20

Contingency 

10.40

Total Capital Cost

167.80

A further US$ 48.7m of sustaining capital over the life of the Project will be funded from the Project cash flows.

Operating costs

Operating costs per tonne of ore mined as from Q1 2010 are summarised below:

US$/t

Mining [Life of Mine]

40.70

Process Plant

18.20

G&A 

7.50

Total Direct Opex

66.40

Taxes & Royalties

16.60

(excludes profits tax)

Oxus Management fee

3.30

TOTAL 

86.30

Operating costs per ounce of gold produced are summarised below:

US$/oz

Direct Costs

310.00

Taxes & Royalties

 77.00

Oxus Management Fee

 15.00

TOTAL

402.00

Revenue

The BFS is based on the COMEX forward gold price curve as supplied by Standard Bank London Ltd, utilising US$ 905 per oz in 2009, rising to US$ 1,063 per oz in 2016.

The following table represents the NPV of the Project at different discount rates per annum:

NPV = $543.99 million at 0% per annum

NPV = $379.85 million at 5% per annum

NPV = $329.45 million at 7% per annum 

NPV = $266.11 million at 10% per annum 

Project Funding 

Oxus intends that thProject will be funded 100% by debt finance. RBS has been appointed as lead arranger for a limited recourse senior debt facility. Expressions of interest have been received by RBS from a number of resource funding institutions regarding the provision of finance for the Project. 

Project Implementation

The Board of Directors of Oxus Gold plc has approved the development of this Project. An initial Project schedule and budget have been established to enable long-lead items and site work to commence prior to the drawdown of the main finance package referred to above. Development of the Project is an extension of the existing fully permitted operation, and will be subject to additional Uzbek Government permits and approvals specific for underground construction and mining. Drawdown of finance will be subject to these approvals together with normal banking conditions precedent.

Both the construction of the processing plant and the establishment of the underground mining and initial stoping will be undertaken by internationally reputable contractors with proven track records. Tenders are currently being processed and potential contractors chosen for these contracts.

For further information, please contact:

Oxus Gold plc

John Donald Tel: +44 (0)20 7907 2000

Jonathan Kipps

Richard Wilkins

Canaccord Adams Limited

Mike Jones Tel: +44 (0)20 7050 6500

Conduit PR.

Jane Stacey/ Ed Portman Tel: +44 (0)20 7429 6606

+ 44(0)792 292 3306

Competent Persons: The resources and reserves stated in this RNS Announcement have been compiled or Approved by the following Competent Persons: Philip S Newall, BSc, ARSM, PhD, CEng, FIMM  Wardell Armstrong International Ltd  Wheal Jane, Baldhu, Truro, Cornwall, TR3 6EH  Tel: +44 1872 560738 Fax: +44 1872 561079  Web: //www.wardell-armstrong.com 

 

Mr. Newall is Senior Consulting Geologist and Director with WAI and has practiced his profession as a mine and exploration geologist for over twenty years for both base and precious metals. Gordon Wylie BSc (Hons) Geology, MAusIMM, FGSSA  Gordon Wylie is a consultant and non-executive Director of Oxus Gold plc. Gordon has over 31 years experience in the mining and exploration industry. From 1998 to 2005 Gordon was in charge of AngloGold and subsequently, AngloGold Ashanti's global exploration programme and was appointed Executive Officer in early 2004. William J Charter, BSc, CGeol, FGS, CEng, MIMM  Bill Charter has over 29 years experience in mining and exploration industry. Having gained experience with Anglo American Corporation (in Fiji and South Africa), he then worked in Central Asia and other locations worldwide. Bill started work with the Oxus Group in 1996. 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCFMMRTMMMTBFP
Date   Source Headline
24th Feb 201612:37 pmRNSStatement re: Appointment of Administrators
3rd Feb 201610:29 amRNSChange of Registered Office
28th Jan 201610:40 amRNSResignation of Nominated Adviser
28th Jan 201610:35 amRNSAppointment of Administrators
23rd Dec 20157:30 amRNSSuspension - Oxus Gold Plc
23rd Dec 20157:00 amRNSOutcome of Arbitration and Suspension from Trading
30th Nov 201511:52 amRNSTotal Voting Rights
25th Nov 20151:08 pmRNSConversion of CLNs and Issue of Equity
20th Nov 201510:17 amRNSHolding in Company
4th Nov 201510:11 amRNSIssue of Convertible Loan Notes and Warrants
30th Oct 20157:00 amRNSTotal Voting Rights
26th Oct 20157:00 amRNSHolding in Company
22nd Oct 201512:33 pmRNSHolding in Company
21st Oct 201511:40 amRNSReplacement - Conversion of CLNs & Issue of Equity
21st Oct 201510:50 amRNSConversion of CLNs and Issue of Equity
19th Oct 20154:40 pmRNSSecond Price Monitoring Extn
19th Oct 20154:35 pmRNSPrice Monitoring Extension
19th Oct 20154:22 pmRNSIssue of Equity
16th Oct 201510:50 amRNSAmendments to and Conversion of CLNs
6th Oct 201510:38 amRNSConvertible loan agreement
5th Oct 20153:08 pmRNSHolding in Company
2nd Oct 201511:46 amRNSHolding in Company
30th Sep 201512:40 pmRNSHalf Yearly Report
31st Jul 20157:00 amRNSTotal Voting Rights
28th Jul 20154:35 pmRNSPrice Monitoring Extension
10th Jul 201511:50 amRNSIssue of Equity
1st Jul 20159:34 amRNSResult of AGM
12th Jun 201510:45 amRNSAnnual Financial Report & Notice of AGM
29th May 201510:21 amRNSTotal Voting Rights
29th May 20157:00 amRNSFinal Results
22nd May 20159:52 amRNSHolding in Company
21st May 20154:02 pmRNSConversion of CLNs and Issue of Equity
30th Apr 20154:35 pmRNSPrice Monitoring Extension
30th Apr 20158:45 amRNSTotal Voting Rights
13th Apr 201511:45 amRNSIssue of Equity
23rd Mar 201512:06 pmRNSHolding in Company
16th Mar 20153:07 pmRNSIssue of Equity
11th Feb 20153:59 pmRNSChange of Registered Office and Office Addresses
6th Feb 20155:14 pmRNSHolding in Company
5th Feb 20154:35 pmRNSPrice Monitoring Extension
30th Jan 20157:00 amRNSTotal Voting Rights
28th Jan 20157:00 amRNSIssue of Equity and Termination of EFF
27th Jan 20151:03 pmRNSIssue of Equity
8th Jan 201510:35 amRNSHolding in Company
6th Jan 201512:03 pmRNSIssue of Equity
6th Jan 201511:30 amRNSHolding in Company
5th Jan 20152:23 pmRNSHolding in Company
31st Dec 201412:40 pmRNSSecond Price Monitoring Extn
31st Dec 201412:35 pmRNSPrice Monitoring Extension
28th Nov 20142:24 pmRNSIssue of Equity

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.