If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksNyota Minerals Regulatory News (NYO)

  • There is currently no data for NYO

Drilling Update

18 Jan 2012 15:51

RNS Number : 7935V
Nyota Minerals Limited
18 January 2012
 



 

 

 

 

18 January 2012

 

Nyota Minerals Limited ("Nyota" or the "Company")

 

Tulu Kapi Update

 

Highlights

Recommencement of drilling at Tulu Kapi gold project underway following the Christmas break. Drilling to include step out drilling at the NE Extension, an infill drill programme between Tulu Kapi and the UNDP Target and for engineering and hydrogeology.
Further assay results for drilling across the Tulu Kapi deposit have been received. Peak intersections include 17.44g/t Au over 3.30m, 8.42g/t Au over 14.20m and 6.52g/t Au over 21.00m.

Work has commenced on the new JORC Mineral Resource.

 

Nyota Minerals (ASX/AIM: NYO), the gold exploration and development Company in East Africa, is pleased to provide shareholders with an exploration update at its Tulu Kapi Project, Ethiopia.

Richard Chase, Chief Executive Officer commented "Drilling continued right up until Christmas and recommenced yesterday. Although there are a large number of sample assay results still pending we anticipate all of this additional data being available for the new resource estimate, which is underway and on track for release later this quarter."

Central Tulu Kapi Drilling

Final assay results have been returned for the remaining six holes out of a total of 38 holes drilled to November 2011 covering the main Tulu Kapi deposit. Peak intersections included 17.44g/t Au over 3.30m, 8.42g/t Au over 14.20m and 6.52g/t Au over 21.00m.

The intersections provided additional infill data with an emphasis on the deeper mineralisation. With the exception of some possible additional structural and engineering drilling, there are no immediate plans for further infill drilling over the central section of the main Tulu Kapi deposit.

 

Borehole ID

Intersection

From

(m)

Intersection

To

(m)

Mineralised Intersection

(m)

Grade

(g/t Au)

TKBH-135

0.00

4.90

4.90

1.20

TKBH-136

230.50

234.53

4.03

5.16

260.70

264.00

3.30

17.44

329.45

347.70

18.25

2.12

428.90

452.00

14.20

8.42

TKBH-138

173.45

189.00

15.55

1.28

TKBH-146

340.00

361.00

21.00

6.52

TKBH-149

84.60

92.00

7.40

1.10

TKBH-151

8.60

26.00

17.40

0.70

 

NE Extension Drilling

A total of three diamond drill holes were completed over the NE Extension to Tulu Kapi. Results from all three holes were encouraging with peak intersections of 2.80g/t Au over 13.05m and 2.55g/t Au over 15.61m. Further step out drilling is required to complete the drill out of the NE Extension.

Borehole ID

Intersection

From

(m)

Intersection

To

(m)

Mineralised Intersection

(m)

Grade

(g/t Au)

TKBH-141

83.10

94.20

11.10

2.17

160.65

175.24

14.59

1.94

TKBH-145

3.10

7.20

4.10

1.51

123.10

133.50

10.40

1.63

TKBH-150

0.00

10.42

10.42

1.06

89.00

102.05

13.05

2.80

132-95

148.00

15.05

1.28

214.75

235.00

15.61

2.55

337.00

348.00

11.00

6.03

 

N Extension - UNDP Drilling

A total of three diamond drill holes were completed over the NE Extension to Tulu Kapi. Results from all three holes were encouraging with peak intersections of 2.80g/t Au over 13.05m and 2.55g/t Au over 15.61m. Further step out drilling is required to complete the drill out of the NE Extension.

 

Borehole ID

Intersection

From

(m)

Intersection

To

(m)

Mineralised Intersection

(m)

Grade

(g/t Au)

TKBH-139

14.60

20.30

5.70

0.60

TKBH-142

112.40

123.42

11.02

3.92

 

Engineering Drilling

As part of the on-going Definitive Feasibility Study ("DFS"), a programme of engineering - geotechnical - hydrogeological drilling is taking place. The current programme is operating to schedule and is expected to deliver the balance of information needed to support the DFS.

Programme

No of Holes

Total Metres (m)

Infill drilling to evaluate mineralised saprolite

70

1,400

Infrastructure Drilling - dam wall, crusher and plant site

10

360

Metallurgical Samples for additional testwork

5

714

Hydrogeological Drilling of Tailings Dam site

8

448

Geotechnical Drilling - In-pit

15

3,238

Hydrogeological Drilling - Open Pit

13

1,766

Total

121

7,926

 

Information on assay data and drilling

 

Reverse Circulation and Diamond drilling follow standard protocols that have been validated and refined by a number of independent consultants who have visited the Tulu Kapi site and monitored drilling operations. Sampling protocols and sample preparation procedures employed in the laboratory located at Tulu Kapi and operated by ALS Chemex have also been reviewed and found to be of an appropriate standard.

 

The Company inserts standards, blanks and duplicates in all its sample batches dispatched for assay and implements strict QA/QC procedures to monitor the assays attributable to these standards, blanks and duplicates.

 

Estimation of grade and mineralised widths

 

A cut‐off was employed of 0.40g/t Au for saprolite and 0.50g/t Au cut‐off for fresh rock. Any intercept of less than the respective cut‐off was excluded from any grade and mineralised width estimate except where an individual sample of 1.0m or less occurred between samples returning grades higher than cut‐off in which case single samples of 1.0m or less that were below the cut‐off would be included in a mineralised intersection.

 

The Tables below lists all mineralised intersections achieved since the last drilling update based upon a 0.40g/t Au and 0.50g/t Au cut‐off.

 

The technical exploration and mining information contained in this Announcement has been reviewed and approved by Mr D Hage Pr.Sci.Nat, Chief Geologist for Nyota Minerals Limited. Mr Hage has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity to which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves and as a qualified person under the AIM Note for Mining, Oil and Gas Companies. Mr Hage is an employee of Nyota Minerals Limited and is a Member of the South African Council for Natural Scientific Professions (SACNASP). Mr Hage consents to the inclusion in this Announcement of such information in the form and context in which it appears.

 

For enquires please contact:

 

Richard Chase (CEO)

Nyota Minerals Limited

+44 (0) 20 7400 5740

info@nyotaminerals.com

 

NOMAD

Richard Morrison / Jen Boorer

Ambrian Partners Limited

+44 (0)20 7634 4700

 

BROKER

Guy Wilkes

Ocean Equities Limited

(+44) (0) 20 7786 4370

 

BROKER

Rory Scott

Mirabaud Securities LLP

(+44) (0)20 7878 3360

 

FINANCIAL PR

Paul Youens / Jos Simson

Tavistock Communications

(+44) (0)20 7920 3150

 

Or visit: http://www.nyotaminerals.com

Neither the contents of the Company's website nor the contents of any website accessible from hyperlinks on the Company's website (or any other website) is incorporated into, or forms part of, this announcement.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLSFUFIAFESELF
Date   Source Headline
11th Apr 20127:00 amRNSChange of name of nominated adviser
21st Mar 20128:34 amRNSAppointment and Retirement of Directors
15th Mar 20121:06 pmRNSSection 708A Notice
15th Mar 20128:37 amRNSHalf-Year Results to 31 December 2011
12th Mar 201212:24 pmRNSHoldings in Company
9th Mar 201211:09 amRNSHolding(s) in Company
9th Mar 20127:00 amRNSTulu Kapi Resource Update
7th Mar 20127:00 amRNSResults of General Meeting
3rd Feb 20127:00 amRNSUpdated Company Presentation
3rd Feb 20127:00 amRNSPlacing of approx £9.66 million and Notice of GM
3rd Feb 20127:00 amRNSNotice of General Meeting of Shareholders
31st Jan 20127:00 amRNSQuarterly Report 31 December 2011
27th Jan 20129:30 amRNSHolding(s) in Company
25th Jan 201212:22 pmRNSHolding(s) in Company
18th Jan 20123:51 pmRNSDrilling Update
5th Jan 201211:03 amRNSAppointment/resignation of Company Secretary
28th Dec 20117:00 amRNSHolding(s) in Company
19th Dec 20119:40 amRNSChange of Director's Interest
16th Dec 20117:00 amRNSExploration Update
29th Nov 20111:24 pmRNSHOLDINGS IN COMPANY
25th Nov 20117:00 amRNSAGM RESULTS
25th Nov 20117:00 amRNSAGM STATEMENT
4th Nov 20119:13 amRNSCHANGE OF DIRECTORS INTEREST REPLACEMENT
4th Nov 20118:54 amRNSCHANGE OF DIRECTORS INTEREST
31st Oct 20117:45 amRNSUPDATED COMPANY PRESENTATION
31st Oct 20117:00 amRNSTULU KAPI DRILLING UPDATE
31st Oct 20117:00 amRNSQUARTERLY REPORT 30 SEPTEMBER 2011
21st Oct 20117:00 amRNSNOTICE OF ANNUAL GENERAL MEETING
11th Oct 20111:22 pmRNSHOLDINGS IN COMPANY
10th Oct 201110:57 amRNSTulu Kapi Proximal Exploration Update - Guji
30th Sep 20117:00 amRNSFinal Results
22nd Sep 20113:33 pmRNSHolding(s) in Company
22nd Sep 20113:05 pmRNSHolding(s) in Company
20th Sep 20115:20 pmRNSCommencement of Definitive Feasibility Study
5th Sep 20114:36 pmRNSPrice Monitoring Extension
23rd Aug 20119:40 amRNSTULU KAPI FEEDER ZONE RESULTS AND DRILLING UPDATE
15th Aug 20117:00 amRNSUPDATED COMPANY PRESENTATION
10th Aug 20111:35 pmRNSISSUE OF SHARES - REPLACEMENT
10th Aug 20117:00 amRNSISSUE OF SHARES
29th Jul 20117:05 amRNSQUARTERLY REPORT 30 JUNE 2011
29th Jul 20117:00 amRNSTULU KAPI RESOURCE AND FEASIBILITY UPDATE
29th Jun 201112:22 pmRNSCHANGE OF DIRECTORS INTEREST
28th Jun 20117:00 amRNSCHANGE OF DIRECTORS INTEREST
3rd Jun 20111:15 pmRNSNYOTA BOARD APPOINTMENT/ISSUE OF OPTIONS
18th May 20117:00 amRNSNORTHERN BLOCK EXPLORATION: NEW TARGET DISCOVERIES
16th May 20117:00 amRNSNEW CHIEF EXECUTIVE OFFICER
13th May 20117:00 amRNSLODGEMENT OF TULU KAPI MINING LICENCE APPLICATION
11th May 20112:13 pmRNSTULU KAPI DRILLING UPDATE
6th May 201112:13 pmRNSCHANGE OF DIRECTORS INTEREST
3rd May 20117:00 amRNSQUARTERLY REPORT 31 MARCH 2011

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.