Talon Resources Targets Ontario Gold Growth After AIM Move and Eagle Lake Acquisition, CEO Says. Watch here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksNyota Minerals Regulatory News (NYO)

  • There is currently no data for NYO

Drilling Update

18 Jan 2012 15:51

RNS Number : 7935V
Nyota Minerals Limited
18 January 2012
 



 

 

 

 

18 January 2012

 

Nyota Minerals Limited ("Nyota" or the "Company")

 

Tulu Kapi Update

 

Highlights

Recommencement of drilling at Tulu Kapi gold project underway following the Christmas break. Drilling to include step out drilling at the NE Extension, an infill drill programme between Tulu Kapi and the UNDP Target and for engineering and hydrogeology.
Further assay results for drilling across the Tulu Kapi deposit have been received. Peak intersections include 17.44g/t Au over 3.30m, 8.42g/t Au over 14.20m and 6.52g/t Au over 21.00m.

Work has commenced on the new JORC Mineral Resource.

 

Nyota Minerals (ASX/AIM: NYO), the gold exploration and development Company in East Africa, is pleased to provide shareholders with an exploration update at its Tulu Kapi Project, Ethiopia.

Richard Chase, Chief Executive Officer commented "Drilling continued right up until Christmas and recommenced yesterday. Although there are a large number of sample assay results still pending we anticipate all of this additional data being available for the new resource estimate, which is underway and on track for release later this quarter."

Central Tulu Kapi Drilling

Final assay results have been returned for the remaining six holes out of a total of 38 holes drilled to November 2011 covering the main Tulu Kapi deposit. Peak intersections included 17.44g/t Au over 3.30m, 8.42g/t Au over 14.20m and 6.52g/t Au over 21.00m.

The intersections provided additional infill data with an emphasis on the deeper mineralisation. With the exception of some possible additional structural and engineering drilling, there are no immediate plans for further infill drilling over the central section of the main Tulu Kapi deposit.

 

Borehole ID

Intersection

From

(m)

Intersection

To

(m)

Mineralised Intersection

(m)

Grade

(g/t Au)

TKBH-135

0.00

4.90

4.90

1.20

TKBH-136

230.50

234.53

4.03

5.16

260.70

264.00

3.30

17.44

329.45

347.70

18.25

2.12

428.90

452.00

14.20

8.42

TKBH-138

173.45

189.00

15.55

1.28

TKBH-146

340.00

361.00

21.00

6.52

TKBH-149

84.60

92.00

7.40

1.10

TKBH-151

8.60

26.00

17.40

0.70

 

NE Extension Drilling

A total of three diamond drill holes were completed over the NE Extension to Tulu Kapi. Results from all three holes were encouraging with peak intersections of 2.80g/t Au over 13.05m and 2.55g/t Au over 15.61m. Further step out drilling is required to complete the drill out of the NE Extension.

Borehole ID

Intersection

From

(m)

Intersection

To

(m)

Mineralised Intersection

(m)

Grade

(g/t Au)

TKBH-141

83.10

94.20

11.10

2.17

160.65

175.24

14.59

1.94

TKBH-145

3.10

7.20

4.10

1.51

123.10

133.50

10.40

1.63

TKBH-150

0.00

10.42

10.42

1.06

89.00

102.05

13.05

2.80

132-95

148.00

15.05

1.28

214.75

235.00

15.61

2.55

337.00

348.00

11.00

6.03

 

N Extension - UNDP Drilling

A total of three diamond drill holes were completed over the NE Extension to Tulu Kapi. Results from all three holes were encouraging with peak intersections of 2.80g/t Au over 13.05m and 2.55g/t Au over 15.61m. Further step out drilling is required to complete the drill out of the NE Extension.

 

Borehole ID

Intersection

From

(m)

Intersection

To

(m)

Mineralised Intersection

(m)

Grade

(g/t Au)

TKBH-139

14.60

20.30

5.70

0.60

TKBH-142

112.40

123.42

11.02

3.92

 

Engineering Drilling

As part of the on-going Definitive Feasibility Study ("DFS"), a programme of engineering - geotechnical - hydrogeological drilling is taking place. The current programme is operating to schedule and is expected to deliver the balance of information needed to support the DFS.

Programme

No of Holes

Total Metres (m)

Infill drilling to evaluate mineralised saprolite

70

1,400

Infrastructure Drilling - dam wall, crusher and plant site

10

360

Metallurgical Samples for additional testwork

5

714

Hydrogeological Drilling of Tailings Dam site

8

448

Geotechnical Drilling - In-pit

15

3,238

Hydrogeological Drilling - Open Pit

13

1,766

Total

121

7,926

 

Information on assay data and drilling

 

Reverse Circulation and Diamond drilling follow standard protocols that have been validated and refined by a number of independent consultants who have visited the Tulu Kapi site and monitored drilling operations. Sampling protocols and sample preparation procedures employed in the laboratory located at Tulu Kapi and operated by ALS Chemex have also been reviewed and found to be of an appropriate standard.

 

The Company inserts standards, blanks and duplicates in all its sample batches dispatched for assay and implements strict QA/QC procedures to monitor the assays attributable to these standards, blanks and duplicates.

 

Estimation of grade and mineralised widths

 

A cut‐off was employed of 0.40g/t Au for saprolite and 0.50g/t Au cut‐off for fresh rock. Any intercept of less than the respective cut‐off was excluded from any grade and mineralised width estimate except where an individual sample of 1.0m or less occurred between samples returning grades higher than cut‐off in which case single samples of 1.0m or less that were below the cut‐off would be included in a mineralised intersection.

 

The Tables below lists all mineralised intersections achieved since the last drilling update based upon a 0.40g/t Au and 0.50g/t Au cut‐off.

 

The technical exploration and mining information contained in this Announcement has been reviewed and approved by Mr D Hage Pr.Sci.Nat, Chief Geologist for Nyota Minerals Limited. Mr Hage has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity to which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves and as a qualified person under the AIM Note for Mining, Oil and Gas Companies. Mr Hage is an employee of Nyota Minerals Limited and is a Member of the South African Council for Natural Scientific Professions (SACNASP). Mr Hage consents to the inclusion in this Announcement of such information in the form and context in which it appears.

 

For enquires please contact:

 

Richard Chase (CEO)

Nyota Minerals Limited

+44 (0) 20 7400 5740

info@nyotaminerals.com

 

NOMAD

Richard Morrison / Jen Boorer

Ambrian Partners Limited

+44 (0)20 7634 4700

 

BROKER

Guy Wilkes

Ocean Equities Limited

(+44) (0) 20 7786 4370

 

BROKER

Rory Scott

Mirabaud Securities LLP

(+44) (0)20 7878 3360

 

FINANCIAL PR

Paul Youens / Jos Simson

Tavistock Communications

(+44) (0)20 7920 3150

 

Or visit: http://www.nyotaminerals.com

Neither the contents of the Company's website nor the contents of any website accessible from hyperlinks on the Company's website (or any other website) is incorporated into, or forms part of, this announcement.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLSFUFIAFESELF
Date   Source Headline
6th Sep 201611:05 amRNSSecond Price Monitoring Extn
6th Sep 201611:00 amRNSPrice Monitoring Extension
5th Sep 20164:40 pmRNSSecond Price Monitoring Extn
5th Sep 20164:35 pmRNSPrice Monitoring Extension
17th Aug 20168:02 amRNSHolding(s) in Company
1st Aug 20168:36 amRNSHolding(s) in Company
29th Jul 20168:09 amRNSQuarterly Report for the period ended 30 June 2016
18th Jul 20168:01 amRNSShare Price Movement
6th Jul 20168:03 amRNSCorporate Update
8th Jun 20168:28 amRNSHolding(s) in Company
26th May 20168:12 amRNSCorporate Update
25th May 20168:41 amRNSBoard Changes
25th May 20167:00 amRNSResult of General Meeting
13th May 20169:30 amRNSHolding(s) in Company
6th May 20162:00 pmRNSHolding(s) in Company
28th Apr 20163:00 pmRNSHolding(s) in Company
28th Apr 201612:15 pmRNSCeasing to be a Significant Shareholder
28th Apr 20168:04 amRNSQuarterly Report
22nd Apr 20168:09 amRNSNotice of General Meeting
18th Apr 20168:02 amRNSShareholder Update on General Meeting
8th Apr 20161:50 pmRNSHoldings in Company
24th Mar 20167:00 amRNSHoldings in Company
24th Mar 20167:00 amRNSHoldings in Company
14th Mar 20162:30 pmRNSInterim Results
11th Mar 20161:45 pmRNSUpdate on Requests for Board Changes
10th Mar 20162:09 pmRNSRequisition Notice For a General Meeting
4th Mar 20161:15 pmRNSRequisition Notice for a General Meeting
3rd Mar 20162:15 pmRNSUpdate on Requisition Notice
1st Mar 20161:41 pmRNSRequisition Notice
29th Feb 20161:30 pmRNSCorporate Update
29th Feb 20168:30 amRNSSignificant Shareholder
25th Feb 20163:30 pmRNSHolding(s) in Company
23rd Feb 20167:00 amRNSHoldings in Company
2nd Feb 20165:15 pmRNSHoldings in Company
1st Feb 20169:50 amRNSHolding(s) in Company
29th Jan 20168:00 amRNSQuarterly Report
27th Jan 201612:00 pmRNSHolding(s) in Company
21st Jan 20163:15 pmRNSPlacement Completed and Total Voting Rights
8th Jan 201612:30 pmRNSHolding(s) in Company
6th Jan 201612:40 pmRNSHolding(s) in Company
30th Nov 201512:00 pmRNSChairman's Statement
30th Nov 20158:30 amRNSResult of AGM
25th Nov 201511:50 amRNSCeasing to be a Significant Shareholder
10th Nov 20159:00 amRNSHolding(s) in Company
5th Nov 20159:15 amRNSHoldings in Company
30th Oct 20157:01 amRNSIssue of Performance Rights to Directors
30th Oct 20157:00 amRNSNotice of Annual General Meeting
29th Oct 20156:00 pmRNSQuarterly Report
29th Oct 20158:20 amRNSHoldings in Company
27th Oct 20159:53 amRNSSignificant Shareholder Notices

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.