Drilling Update

18 Jan 2012 15:51

RNS Number : 7935V
Nyota Minerals Limited
18 January 2012
 



 

 

 

 

18 January 2012

 

Nyota Minerals Limited ("Nyota" or the "Company")

 

Tulu Kapi Update

 

Highlights

Recommencement of drilling at Tulu Kapi gold project underway following the Christmas break. Drilling to include step out drilling at the NE Extension, an infill drill programme between Tulu Kapi and the UNDP Target and for engineering and hydrogeology.
Further assay results for drilling across the Tulu Kapi deposit have been received. Peak intersections include 17.44g/t Au over 3.30m, 8.42g/t Au over 14.20m and 6.52g/t Au over 21.00m.

Work has commenced on the new JORC Mineral Resource.

 

Nyota Minerals (ASX/AIM: NYO), the gold exploration and development Company in East Africa, is pleased to provide shareholders with an exploration update at its Tulu Kapi Project, Ethiopia.

Richard Chase, Chief Executive Officer commented "Drilling continued right up until Christmas and recommenced yesterday. Although there are a large number of sample assay results still pending we anticipate all of this additional data being available for the new resource estimate, which is underway and on track for release later this quarter."

Central Tulu Kapi Drilling

Final assay results have been returned for the remaining six holes out of a total of 38 holes drilled to November 2011 covering the main Tulu Kapi deposit. Peak intersections included 17.44g/t Au over 3.30m, 8.42g/t Au over 14.20m and 6.52g/t Au over 21.00m.

The intersections provided additional infill data with an emphasis on the deeper mineralisation. With the exception of some possible additional structural and engineering drilling, there are no immediate plans for further infill drilling over the central section of the main Tulu Kapi deposit.

 

Borehole ID

Intersection

From

(m)

Intersection

To

(m)

Mineralised Intersection

(m)

Grade

(g/t Au)

TKBH-135

0.00

4.90

4.90

1.20

TKBH-136

230.50

234.53

4.03

5.16

260.70

264.00

3.30

17.44

329.45

347.70

18.25

2.12

428.90

452.00

14.20

8.42

TKBH-138

173.45

189.00

15.55

1.28

TKBH-146

340.00

361.00

21.00

6.52

TKBH-149

84.60

92.00

7.40

1.10

TKBH-151

8.60

26.00

17.40

0.70

 

NE Extension Drilling

A total of three diamond drill holes were completed over the NE Extension to Tulu Kapi. Results from all three holes were encouraging with peak intersections of 2.80g/t Au over 13.05m and 2.55g/t Au over 15.61m. Further step out drilling is required to complete the drill out of the NE Extension.

Borehole ID

Intersection

From

(m)

Intersection

To

(m)

Mineralised Intersection

(m)

Grade

(g/t Au)

TKBH-141

83.10

94.20

11.10

2.17

160.65

175.24

14.59

1.94

TKBH-145

3.10

7.20

4.10

1.51

123.10

133.50

10.40

1.63

TKBH-150

0.00

10.42

10.42

1.06

89.00

102.05

13.05

2.80

132-95

148.00

15.05

1.28

214.75

235.00

15.61

2.55

337.00

348.00

11.00

6.03

 

N Extension - UNDP Drilling

A total of three diamond drill holes were completed over the NE Extension to Tulu Kapi. Results from all three holes were encouraging with peak intersections of 2.80g/t Au over 13.05m and 2.55g/t Au over 15.61m. Further step out drilling is required to complete the drill out of the NE Extension.

 

Borehole ID

Intersection

From

(m)

Intersection

To

(m)

Mineralised Intersection

(m)

Grade

(g/t Au)

TKBH-139

14.60

20.30

5.70

0.60

TKBH-142

112.40

123.42

11.02

3.92

 

Engineering Drilling

As part of the on-going Definitive Feasibility Study ("DFS"), a programme of engineering - geotechnical - hydrogeological drilling is taking place. The current programme is operating to schedule and is expected to deliver the balance of information needed to support the DFS.

Programme

No of Holes

Total Metres (m)

Infill drilling to evaluate mineralised saprolite

70

1,400

Infrastructure Drilling - dam wall, crusher and plant site

10

360

Metallurgical Samples for additional testwork

5

714

Hydrogeological Drilling of Tailings Dam site

8

448

Geotechnical Drilling - In-pit

15

3,238

Hydrogeological Drilling - Open Pit

13

1,766

Total

121

7,926

 

Information on assay data and drilling

 

Reverse Circulation and Diamond drilling follow standard protocols that have been validated and refined by a number of independent consultants who have visited the Tulu Kapi site and monitored drilling operations. Sampling protocols and sample preparation procedures employed in the laboratory located at Tulu Kapi and operated by ALS Chemex have also been reviewed and found to be of an appropriate standard.

 

The Company inserts standards, blanks and duplicates in all its sample batches dispatched for assay and implements strict QA/QC procedures to monitor the assays attributable to these standards, blanks and duplicates.

 

Estimation of grade and mineralised widths

 

A cut‐off was employed of 0.40g/t Au for saprolite and 0.50g/t Au cut‐off for fresh rock. Any intercept of less than the respective cut‐off was excluded from any grade and mineralised width estimate except where an individual sample of 1.0m or less occurred between samples returning grades higher than cut‐off in which case single samples of 1.0m or less that were below the cut‐off would be included in a mineralised intersection.

 

The Tables below lists all mineralised intersections achieved since the last drilling update based upon a 0.40g/t Au and 0.50g/t Au cut‐off.

 

The technical exploration and mining information contained in this Announcement has been reviewed and approved by Mr D Hage Pr.Sci.Nat, Chief Geologist for Nyota Minerals Limited. Mr Hage has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity to which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves and as a qualified person under the AIM Note for Mining, Oil and Gas Companies. Mr Hage is an employee of Nyota Minerals Limited and is a Member of the South African Council for Natural Scientific Professions (SACNASP). Mr Hage consents to the inclusion in this Announcement of such information in the form and context in which it appears.

 

For enquires please contact:

 

Richard Chase (CEO)

Nyota Minerals Limited

+44 (0) 20 7400 5740

info@nyotaminerals.com

 

NOMAD

Richard Morrison / Jen Boorer

Ambrian Partners Limited

+44 (0)20 7634 4700

 

BROKER

Guy Wilkes

Ocean Equities Limited

(+44) (0) 20 7786 4370

 

BROKER

Rory Scott

Mirabaud Securities LLP

(+44) (0)20 7878 3360

 

FINANCIAL PR

Paul Youens / Jos Simson

Tavistock Communications

(+44) (0)20 7920 3150

 

Or visit: http://www.nyotaminerals.com

Neither the contents of the Company's website nor the contents of any website accessible from hyperlinks on the Company's website (or any other website) is incorporated into, or forms part of, this announcement.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLSFUFIAFESELF
Date   Source Headline
13th Aug 20097:20 amRNSDwyka to secure 100% of Minerva - Offer closed
12th Aug 200910:13 amRNSMinerva Offer Closed, Compulsory Acqn commenced
12th Aug 20097:04 amRNSOFFER UPDATE
7th Aug 20097:00 amRNSIssue of Shares
4th Aug 20098:19 amRNSNotice of Meeting
30th Jul 20097:00 amRNSShareholder Letter
30th Jul 20097:00 amRNSIssue of Shares
29th Jul 20091:19 pmRNSUpdated Company Presentation
29th Jul 20098:41 amRNSAmended Offer Update
29th Jul 20097:00 amRNSOffer Update
27th Jul 20097:04 amRNSCompany Presentation
23rd Jul 20098:35 amRNSIssue of shares
23rd Jul 20097:47 amRNSDelisting of Minerva Resources PLC ("Minerva")
22nd Jul 20091:13 pmRNSWork programme commences at Ethiopian Gold Project
22nd Jul 20097:00 amRNSWork programme commences at Ethiopian Gold Project
21st Jul 20097:16 amRNSIssue of Shares
20th Jul 20097:26 amRNSQuarterly Report 30 June 2009
15th Jul 20097:00 amRNSOffer Update
1st Jul 20093:03 pmRNSRule 8.3- Dwyka Resources
25th Jun 200911:30 amRNSOffer Update
23rd Jun 20097:00 amRNSOffer for Minerva Resources PLC
18th Jun 200912:45 pmRNSRule 8.1- (Dwyka Resources plc)
17th Jun 20092:42 pmRNSRule 8.1- (Dwyka Resources plc)
17th Jun 20092:10 pmRNSStatement re Minerva EGM
15th Jun 20099:49 amRNSHolding(s) in Company
11th Jun 20094:37 pmRNSASX Waiver re: Possible Offer for Minerva
9th Jun 200912:46 pmRNSRule 8.3- Dwyka Resources - Replacement
9th Jun 200911:53 amRNSRule 8.3- Dwyka Resrouces
9th Jun 200911:52 amRNSRule 8.3- Dwyka Resources
8th Jun 20095:29 pmRNSRule 8.3- Dwyka Resources
8th Jun 200911:45 amRNSFurther re: Possible Offer for Minerva Resources
5th Jun 200911:55 amRNSRule 8.3- Dwyka Resources Ltd
1st Jun 20097:00 amRNSStatement re Possible Offer
28th May 20098:26 amRNSMuremera Nickel Project Phase 2 Update
20th May 20093:51 pmRNSStmnt re Share Price Movement
12th May 20097:05 amRNSIssue of Shares
8th May 20093:58 pmRNSHolding(s) in Company
30th Apr 20097:33 amRNSQuarterly Report 31 March 2009
23rd Apr 20093:56 pmRNSShareholder Letter
23rd Apr 20097:12 amRNSHolding(s) in Company
7th Apr 20097:00 amRNSHolding(s) in Company
27th Mar 20098:24 amRNSHolding(s) in Company
26th Mar 20098:04 amRNSHolding(s) in Company
13th Mar 200910:06 amRNSHalf Year Report 31 December 2008
13th Mar 20097:06 amRNSDWY secures 100% interest: Muremera Nickel Project
20th Feb 20097:38 amRNSBoard Change
18th Feb 20097:05 amRNSShareholder Letter
30th Jan 200910:58 amRNSQuarterly Report 31 December 2008
28th Nov 20088:27 amRNSResult of AGM
31st Oct 20087:18 amRNSQuarterly Report for 30 September 2008

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.