If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksNyota Minerals Regulatory News (NYO)

  • There is currently no data for NYO

Drilling Update

18 Jan 2012 15:51

RNS Number : 7935V
Nyota Minerals Limited
18 January 2012
 



 

 

 

 

18 January 2012

 

Nyota Minerals Limited ("Nyota" or the "Company")

 

Tulu Kapi Update

 

Highlights

Recommencement of drilling at Tulu Kapi gold project underway following the Christmas break. Drilling to include step out drilling at the NE Extension, an infill drill programme between Tulu Kapi and the UNDP Target and for engineering and hydrogeology.
Further assay results for drilling across the Tulu Kapi deposit have been received. Peak intersections include 17.44g/t Au over 3.30m, 8.42g/t Au over 14.20m and 6.52g/t Au over 21.00m.

Work has commenced on the new JORC Mineral Resource.

 

Nyota Minerals (ASX/AIM: NYO), the gold exploration and development Company in East Africa, is pleased to provide shareholders with an exploration update at its Tulu Kapi Project, Ethiopia.

Richard Chase, Chief Executive Officer commented "Drilling continued right up until Christmas and recommenced yesterday. Although there are a large number of sample assay results still pending we anticipate all of this additional data being available for the new resource estimate, which is underway and on track for release later this quarter."

Central Tulu Kapi Drilling

Final assay results have been returned for the remaining six holes out of a total of 38 holes drilled to November 2011 covering the main Tulu Kapi deposit. Peak intersections included 17.44g/t Au over 3.30m, 8.42g/t Au over 14.20m and 6.52g/t Au over 21.00m.

The intersections provided additional infill data with an emphasis on the deeper mineralisation. With the exception of some possible additional structural and engineering drilling, there are no immediate plans for further infill drilling over the central section of the main Tulu Kapi deposit.

 

Borehole ID

Intersection

From

(m)

Intersection

To

(m)

Mineralised Intersection

(m)

Grade

(g/t Au)

TKBH-135

0.00

4.90

4.90

1.20

TKBH-136

230.50

234.53

4.03

5.16

260.70

264.00

3.30

17.44

329.45

347.70

18.25

2.12

428.90

452.00

14.20

8.42

TKBH-138

173.45

189.00

15.55

1.28

TKBH-146

340.00

361.00

21.00

6.52

TKBH-149

84.60

92.00

7.40

1.10

TKBH-151

8.60

26.00

17.40

0.70

 

NE Extension Drilling

A total of three diamond drill holes were completed over the NE Extension to Tulu Kapi. Results from all three holes were encouraging with peak intersections of 2.80g/t Au over 13.05m and 2.55g/t Au over 15.61m. Further step out drilling is required to complete the drill out of the NE Extension.

Borehole ID

Intersection

From

(m)

Intersection

To

(m)

Mineralised Intersection

(m)

Grade

(g/t Au)

TKBH-141

83.10

94.20

11.10

2.17

160.65

175.24

14.59

1.94

TKBH-145

3.10

7.20

4.10

1.51

123.10

133.50

10.40

1.63

TKBH-150

0.00

10.42

10.42

1.06

89.00

102.05

13.05

2.80

132-95

148.00

15.05

1.28

214.75

235.00

15.61

2.55

337.00

348.00

11.00

6.03

 

N Extension - UNDP Drilling

A total of three diamond drill holes were completed over the NE Extension to Tulu Kapi. Results from all three holes were encouraging with peak intersections of 2.80g/t Au over 13.05m and 2.55g/t Au over 15.61m. Further step out drilling is required to complete the drill out of the NE Extension.

 

Borehole ID

Intersection

From

(m)

Intersection

To

(m)

Mineralised Intersection

(m)

Grade

(g/t Au)

TKBH-139

14.60

20.30

5.70

0.60

TKBH-142

112.40

123.42

11.02

3.92

 

Engineering Drilling

As part of the on-going Definitive Feasibility Study ("DFS"), a programme of engineering - geotechnical - hydrogeological drilling is taking place. The current programme is operating to schedule and is expected to deliver the balance of information needed to support the DFS.

Programme

No of Holes

Total Metres (m)

Infill drilling to evaluate mineralised saprolite

70

1,400

Infrastructure Drilling - dam wall, crusher and plant site

10

360

Metallurgical Samples for additional testwork

5

714

Hydrogeological Drilling of Tailings Dam site

8

448

Geotechnical Drilling - In-pit

15

3,238

Hydrogeological Drilling - Open Pit

13

1,766

Total

121

7,926

 

Information on assay data and drilling

 

Reverse Circulation and Diamond drilling follow standard protocols that have been validated and refined by a number of independent consultants who have visited the Tulu Kapi site and monitored drilling operations. Sampling protocols and sample preparation procedures employed in the laboratory located at Tulu Kapi and operated by ALS Chemex have also been reviewed and found to be of an appropriate standard.

 

The Company inserts standards, blanks and duplicates in all its sample batches dispatched for assay and implements strict QA/QC procedures to monitor the assays attributable to these standards, blanks and duplicates.

 

Estimation of grade and mineralised widths

 

A cut‐off was employed of 0.40g/t Au for saprolite and 0.50g/t Au cut‐off for fresh rock. Any intercept of less than the respective cut‐off was excluded from any grade and mineralised width estimate except where an individual sample of 1.0m or less occurred between samples returning grades higher than cut‐off in which case single samples of 1.0m or less that were below the cut‐off would be included in a mineralised intersection.

 

The Tables below lists all mineralised intersections achieved since the last drilling update based upon a 0.40g/t Au and 0.50g/t Au cut‐off.

 

The technical exploration and mining information contained in this Announcement has been reviewed and approved by Mr D Hage Pr.Sci.Nat, Chief Geologist for Nyota Minerals Limited. Mr Hage has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity to which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves and as a qualified person under the AIM Note for Mining, Oil and Gas Companies. Mr Hage is an employee of Nyota Minerals Limited and is a Member of the South African Council for Natural Scientific Professions (SACNASP). Mr Hage consents to the inclusion in this Announcement of such information in the form and context in which it appears.

 

For enquires please contact:

 

Richard Chase (CEO)

Nyota Minerals Limited

+44 (0) 20 7400 5740

info@nyotaminerals.com

 

NOMAD

Richard Morrison / Jen Boorer

Ambrian Partners Limited

+44 (0)20 7634 4700

 

BROKER

Guy Wilkes

Ocean Equities Limited

(+44) (0) 20 7786 4370

 

BROKER

Rory Scott

Mirabaud Securities LLP

(+44) (0)20 7878 3360

 

FINANCIAL PR

Paul Youens / Jos Simson

Tavistock Communications

(+44) (0)20 7920 3150

 

Or visit: http://www.nyotaminerals.com

Neither the contents of the Company's website nor the contents of any website accessible from hyperlinks on the Company's website (or any other website) is incorporated into, or forms part of, this announcement.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLSFUFIAFESELF
Date   Source Headline
20th Apr 20117:00 amRNSCEO APPOINTMENT
18th Mar 20118:57 amRNSCHANGE OF DIRECTORS INTEREST
15th Mar 201111:58 amRNSHALF YEAR REPORT 31 DECEMBER 2010
7th Mar 201112:17 pmRNSDRILLING TO COMMENCE ON PRIORITY TARGET
4th Mar 20117:20 amRNSAdmission to S&P ASX All Ordinaries Index
3rd Mar 201110:30 amRNSDRILLING UPATE
3rd Mar 201110:15 amRNSTERRY TUCKER - RESIGNED AS CEO
3rd Mar 201110:05 amRNSTULU KAPI PROJECT TO PROGRESS TO PRE FEASABILITY
24th Feb 20114:29 pmRNSREPLACEMENT: LETTER TO SHAREHOLDER
24th Feb 20113:44 pmRNSLETTER TO SHAREHOLDER
11th Feb 20119:50 amRNSIFC EXERCISES ALL NYOTA OPTIONS
9th Feb 201110:00 amRNSUPDATED COMPANY PRESENTATION
8th Feb 20117:00 amRNSEXPLORATION UPDATE
4th Feb 20111:05 pmRNSISSUE OF OPTIONS/APPENDIX 3B
1st Feb 20117:00 amRNSAPPOINTMENT OF ROCKBURY CAPITAL
28th Jan 20117:00 amRNSQUARTERLY REPORT 31 DECEMBER 2010
27th Jan 20117:00 amRNSDRILLING UPDATE
5th Jan 20117:21 amRNSISSUE OF SHARES
24th Dec 20107:00 amRNSSECURITIES DEALING POLICY
23rd Dec 20107:00 amRNSNYO INTEREST IN REGIONAL PORTFOLIO TO MOVE TO 100%
16th Dec 201011:33 amRNSTULU KAPI COMMUNITY & ENVIRONMENTAL PROGRAM UPDATE
9th Dec 20108:39 amRNSDRILLING UPDATE
6th Dec 20107:00 amRNSCOMMENCEMENT OF REGIONAL DRILLING PROGRAMME
30th Nov 20107:00 amRNSGRANT OF OPTIONS
24th Nov 201010:17 amRNSRESULTS OF ANNUAL GENERAL MEETING
16th Nov 201012:43 pmRNSISSUE OF SHARES
8th Nov 20107:00 amRNSCOMPLETION OF GBP21.58 MILLION FUNDRAISING
5th Nov 201011:34 amRNSLETTER TO SHAREHOLDER
1st Nov 20107:55 amRNSRESULTS OF GENERAL MEETING/ISSUE OF SHARES
28th Oct 20108:03 amRNSQUARTERLY REPORT 30 SEPTEMBER 2010
21st Oct 20107:00 amRNSNOTICE OF ANNUAL GENERAL MEETING
21st Oct 20107:00 amRNSNOTICE OF ANNUAL GENERAL MEETING
18th Oct 20107:00 amRNSTULU KAPI DRILLING UPDATE
6th Oct 20107:00 amRNSREGIONAL AIRBORNE SURVEY COMMENCES
4th Oct 20107:00 amRNSFURTHER METALLURGICAL TEST RESULTS FROM TULU KAPI
29th Sep 20107:57 amRNSCAPITAL RAISING OF ?21.58M
13th Sep 20101:29 pmRNSBOARD CHANGES
10th Sep 201010:14 amRNS2010 ANNUAL REPORT
9th Sep 20107:00 amRNSUPDATED COMPANY PRESENTATION
8th Sep 20107:00 amRNSREGIONAL EXPLORATION PROGRAMME COMMENCES
6th Aug 20107:04 amRNSNYOTA BOARD AND MANAGEMENT APPOINTMENTS
5th Aug 20107:05 amRNSFURTHER POSITIVE DRILLING RESULTS AT TULU KAPI
29th Jul 20107:10 amRNSQUARTERLY REPORT 30 JUNE 2010
15th Jul 20107:50 amRNSFeasibility Study and New Appointments
14th Jul 201011:24 amRNSAPPOINTMENT OF MIRABAUD AS JOINT BROKER
5th Jul 20101:25 pmRNSEXERCISE OF JUNE 2010 OPTIONS
1st Jul 201012:41 pmRNSHOLDING(S) IN COMPANY
1st Jul 20107:00 amRNSCHANGE OF DIRECTORS INTEREST
29th Jun 20107:00 amRNSFOURTH DRILL RIG ARRIVES AT TULU KAPI
24th Jun 201011:58 amRNSCHANGE OF DIRECTORS INTEREST

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.