Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPetro Matad Regulatory News (MATD)

Share Price Information for Petro Matad (MATD)

Share Price is delayed by 15 minutes
Get Live Data
1.175    0.00 (0.00%)
Bid:
1.15
Ask:
1.20
Spread: 0.05 (4.348%)
Market Cap: £21.61m
MATD Live PriceLast checked at - London Stock Exchange

Intraday Petro Matad Share Chart

Operational update - 3D seismic campaign

24 Oct 2017 07:20

RNS Number : 4249U
Petro Matad Limited
24 October 2017
 

24 October 2017

Petro Matad Limited

("Petro Matad" or the "Company")

Operational update - 3D seismic campaign

Petro Matad (AIM: MATD) is pleased to provide an operational update.

Seismic Acquisition Campaign

· The Company has signed the contract with BGP Inc (a divisions of China National Petroleum Company) for 3D and 2D seismic work in Blocks IV and V

· Preliminary mobilization and camp construction is already underway, allowing for immediate preparatory and long lead work to begin

· The 218km2 3D survey in Blocks IV and V will be the first ever 3D seismic acquired in western Mongolia

Further to its announcement of 4 October 2017, the Company is pleased to provide the timelines and details regarding the planned seismic work programme following the signing of the BGP contract, as detailed further below. The 220km2 3D survey will be the first ever 3D seismic acquired in western Mongolia. It will be conducted over the Tugrug Basin of eastern Block V, a longstanding priority basin for Petro Matad with a proven working petroleum system including mature source rock, reservoir rocks with good porosity & permeability and live hydrocarbon staining found in previous stratigraphic coring operations. 

The survey in the Tugrug Basin of Block V is expected to begin 3D data recording operations by mid-November and to be completed by mid-December, 2017. The crew will then begin a 150 line km infill 2D survey in the same area, extending outward from the 3D, to cover surrounding prospects and leads. No camp move is required so the 2D acquisition can begin seamlessly after completion of the 3D. As such, the estimated completion date of the Tugrug Basin 2D program will be two weeks after the 3D. 

Following completion of the Tugrug Basin 2D, the crew and camp will move 350km NW into Block IV to acquire a new 205 line km 2D seismic grid over the Khangai Basin. The Khangai Basin is a deep and prospective basin in north-central Block IV. It has been high graded following the results of the airborne FTG/HRAM survey of 2015. Whilst only two regional 2D seismic lines currently cross the Khangai Basin, these lines show adequate basinal depths (3500M-4000M) and prospective structural and stratigraphic configurations. The Khangai Basin 2D survey is projected to start in late December, and complete before the end of January 2018.

Processing of both the 3D and 2D data has been contracted to Western GeCo (a division of Schlumberger Limited). The data will be delivered to the processors in near real time to allow maximum efficiency and return of processed data to the Company. Both the 3D and 2D programs are focused on high grading specific leads and prospects to potential drilling targets for the 2018/19 operational seasons.

-Ends -

 

For more information, please contact:

 

Petro Matad Limited

 

John Henriksen, CFO

+97 670 141 099 / +97 675 751 099

 

NOMAD and Broker

Stockdale Securities Limited

 

Richard Johnson / Elhanan Lee

+44 (0)20 7601 6100

 

 Business Advisory Firm

 FTI Consulting

 Edward Westropp +44 (0)20 3727 1521

 

About Petro Matad

Petro Matad is the parent company of a group focussed on oil exploration, as well as future development and production in Mongolia. At the current time, Petro Matad holds the sole operatorship of three Production Sharing Contracts with the Government of Mongolia. Block XX has an area of 10,340 km² in the far eastern part of the country, and Blocks IV and V have an area of 28,900 km2 and 21,100 km2, respectively, in the southwest part of the country.

Petro Matad Limited is incorporated in the Isle of Man under company number 1483V. Its registered office is at Victory House, Prospect Hill, Douglas, Isle of Man, IM1 1EQ.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
UPDQZLBLDBFFFBD
Date   Source Headline
28th May 202612:00 pmRNSResult of AGM
28th May 20267:00 amRNSOperational Update
15th May 20267:00 amRNSNotice of AGM Logistics
30th Apr 20267:00 amRNSNotice of AGM
18th Feb 20267:00 amRNSPetro Matad Operational Update
13th Jan 20267:00 amRNSBoard Changes
12th Dec 20257:00 amRNSOperational Update
10th Dec 20257:00 amRNS-RInvestor Presentation
5th Nov 20257:00 amRNSOperational Update
9th Oct 20257:00 amRNSOperational Update
29th Sep 20257:05 amRNSInterim results for six months ended 30 June 2025
29th Sep 20257:00 amRNSH1 Production Operations and Well Testing Update
24th Sep 20257:00 amRNSOperational Update
26th Aug 20257:00 amRNSOperational Update
30th Jul 20257:00 amRNSOperational Update
23rd Jul 202512:00 pmRNS-RInvestor Presentation
16th Jul 20257:00 amRNSResult of Retail Offer
11th Jul 20257:05 amRNSRetail Offer
11th Jul 20257:00 amRNSResults of Placing and Subscription
10th Jul 20254:35 pmRNSProposed Capital Raising
26th Jun 20254:58 pmRNSFinal results year ended 31 Dec 2024 - Replacement
26th Jun 20257:00 amRNSFinal results for year ended 31 December 2024
18th Jun 20257:00 amRNSProduction Revenue Received
30th May 20257:00 amRNSOperational Update
28th Apr 20257:00 amRNSSignature of Oil Sales Agreement
13th Mar 202510:40 amRNSResult of AGM
13th Mar 20257:00 amRNSOperational Update
28th Feb 20257:00 amRNSNotice of AGM Logistics
14th Feb 20257:00 amRNSNotice of AGM
5th Feb 20257:00 amRNSCertification of Block XX Exploitation Area
16th Jan 20257:00 amRNSOperational Update
14th Nov 20247:00 amRNSOperational Update
25th Oct 20247:00 amRNSProduction startup at Heron-1
22nd Oct 20247:00 amRNSPlanned production startup at Heron-1
7th Oct 20247:00 amRNSOperational Update
1st Oct 20247:07 amRNSHeron-2 drilling results
23rd Sep 20247:00 amRNSSpud of Gobi Bear-1 exploration well
19th Sep 20247:02 amRNSInterim results for six months ended 30 June 2024
19th Sep 20247:00 amRNSHeron-1 operational update
9th Sep 20247:00 amRNSOperational Update – Spud of Heron-2
22nd Aug 20247:00 amRNSOperational Update
23rd Jul 20247:00 amRNSCommencement of Heron-1 Completion Operations
10th Jul 20247:00 amRNSInvestor Presentation & Forward Work Programme
1st Jul 20247:00 amRNSResult of Retail Offer
28th Jun 20247:00 amRNSIssue of equity
26th Jun 20247:00 amRNSRetail Offer
26th Jun 20247:00 amRNSResults of Capital Raise
25th Jun 20244:40 pmRNSProposed fundraise to raise up to USD$8.5 million
19th Jun 20247:00 amRNSFinal results for year ended 31 December 2023
29th May 202411:32 amRNSOperational Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.