The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPetro Matad Regulatory News (MATD)

Share Price Information for Petro Matad (MATD)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2.90
Bid: 2.80
Ask: 3.00
Change: -0.10 (-3.33%)
Spread: 0.20 (7.143%)
Open: 3.00
High: 3.00
Low: 2.80
Prev. Close: 3.00
MATD Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Operational update - 3D seismic campaign

24 Oct 2017 07:20

RNS Number : 4249U
Petro Matad Limited
24 October 2017
 

24 October 2017

Petro Matad Limited

("Petro Matad" or the "Company")

Operational update - 3D seismic campaign

Petro Matad (AIM: MATD) is pleased to provide an operational update.

Seismic Acquisition Campaign

· The Company has signed the contract with BGP Inc (a divisions of China National Petroleum Company) for 3D and 2D seismic work in Blocks IV and V

· Preliminary mobilization and camp construction is already underway, allowing for immediate preparatory and long lead work to begin

· The 218km2 3D survey in Blocks IV and V will be the first ever 3D seismic acquired in western Mongolia

Further to its announcement of 4 October 2017, the Company is pleased to provide the timelines and details regarding the planned seismic work programme following the signing of the BGP contract, as detailed further below. The 220km2 3D survey will be the first ever 3D seismic acquired in western Mongolia. It will be conducted over the Tugrug Basin of eastern Block V, a longstanding priority basin for Petro Matad with a proven working petroleum system including mature source rock, reservoir rocks with good porosity & permeability and live hydrocarbon staining found in previous stratigraphic coring operations. 

The survey in the Tugrug Basin of Block V is expected to begin 3D data recording operations by mid-November and to be completed by mid-December, 2017. The crew will then begin a 150 line km infill 2D survey in the same area, extending outward from the 3D, to cover surrounding prospects and leads. No camp move is required so the 2D acquisition can begin seamlessly after completion of the 3D. As such, the estimated completion date of the Tugrug Basin 2D program will be two weeks after the 3D. 

Following completion of the Tugrug Basin 2D, the crew and camp will move 350km NW into Block IV to acquire a new 205 line km 2D seismic grid over the Khangai Basin. The Khangai Basin is a deep and prospective basin in north-central Block IV. It has been high graded following the results of the airborne FTG/HRAM survey of 2015. Whilst only two regional 2D seismic lines currently cross the Khangai Basin, these lines show adequate basinal depths (3500M-4000M) and prospective structural and stratigraphic configurations. The Khangai Basin 2D survey is projected to start in late December, and complete before the end of January 2018.

Processing of both the 3D and 2D data has been contracted to Western GeCo (a division of Schlumberger Limited). The data will be delivered to the processors in near real time to allow maximum efficiency and return of processed data to the Company. Both the 3D and 2D programs are focused on high grading specific leads and prospects to potential drilling targets for the 2018/19 operational seasons.

-Ends -

 

For more information, please contact:

 

Petro Matad Limited

 

John Henriksen, CFO

+97 670 141 099 / +97 675 751 099

 

NOMAD and Broker

Stockdale Securities Limited

 

Richard Johnson / Elhanan Lee

+44 (0)20 7601 6100

 

 Business Advisory Firm

 FTI Consulting

 Edward Westropp +44 (0)20 3727 1521

 

About Petro Matad

Petro Matad is the parent company of a group focussed on oil exploration, as well as future development and production in Mongolia. At the current time, Petro Matad holds the sole operatorship of three Production Sharing Contracts with the Government of Mongolia. Block XX has an area of 10,340 km² in the far eastern part of the country, and Blocks IV and V have an area of 28,900 km2 and 21,100 km2, respectively, in the southwest part of the country.

Petro Matad Limited is incorporated in the Isle of Man under company number 1483V. Its registered office is at Victory House, Prospect Hill, Douglas, Isle of Man, IM1 1EQ.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
UPDQZLBLDBFFFBD
Date   Source Headline
31st Jul 20121:43 pmRNSTotal Voting Rights
26th Jul 20123:15 pmRNSDirector/PDMR Shareholding
9th Jul 20129:08 amRNSIssue of Equity
29th Jun 20127:00 amRNSFinal Results
25th May 20127:00 amRNSUpdate on oil shale operations
26th Apr 20123:53 pmRNSIssue of Equity and Award of Options
24th Apr 20127:23 amRNSPresentation to AAPG and Operations Update
20th Apr 20121:54 pmRNSChanges to Senior Management
2nd Apr 20121:39 pmRNSTotal Voting Rights
27th Mar 20127:00 amRNSDirectorate Change
13th Mar 20127:00 amRNSDirectorate Change
5th Mar 20129:50 amRNSIssue of Equity
13th Feb 20128:57 amRNSIssue of Equity
1st Feb 20127:00 amRNSRe-organisation of Nomad and Joint Broker
27th Jan 20127:00 amRNSDirectorate Change
18th Jan 20129:29 amRNSManagement change
2nd Dec 20119:24 amRNSTotal Voting Rights and Share Capital
21st Nov 201110:42 amRNSIssue of Equity and Director's Holding
17th Nov 20111:30 pmRNSOperational Update
10th Nov 20118:06 amRNSChange of Adviser
4th Nov 201110:49 amRNSOperational Update
2nd Nov 201110:40 amRNSResult of AGM
17th Oct 20111:07 pmRNSOperational Update
7th Oct 201111:48 amRNSNotice of AGM
30th Sep 20117:00 amRNSHalf Yearly Report
30th Sep 20117:00 amRNSOperational Update
27th Sep 20112:18 pmRNSOperational Update
14th Sep 201112:44 pmRNSExtension and Relinquishment of Licence Areas
9th Sep 201110:17 amRNSOperational Update
31st Aug 20119:39 amRNSTotal Voting Rights
30th Aug 20117:00 amRNSOperational Update - DT1
30th Aug 20117:00 amRNSOperational Update - DT9
22nd Aug 20117:00 amRNSOperational Update
5th Aug 20113:52 pmRNSIssue of Equity
4th Aug 201110:43 amRNSSpudding of DT-9
2nd Aug 20113:04 pmRNSOperational Update
14th Jul 201110:19 amRNSOperational Update
30th Jun 201111:33 amRNSTotal Voting Rights
27th Jun 20113:07 pmRNSSpudding of DT-7
23rd Jun 20111:50 pmRNSOperational Update
21st Jun 20117:00 amRNSFinal Results
10th Jun 20111:52 pmRNSIssue of Equity
9th Jun 201111:05 amRNSBlock XX Drilling Programme
8th Jun 20119:35 amRNSOperational Update
23rd May 201112:33 pmRNSDirectorate Change
19th May 20119:30 amRNSBlock XX Drilling Programme
16th May 201112:38 pmRNSOperational Update
4th May 20111:22 pmRNSDT-4 Operational Update
3rd May 20111:03 pmRNSTotal Voting Rights
28th Apr 201111:48 amRNSOperational Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.