The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPetro Matad Regulatory News (MATD)

Share Price Information for Petro Matad (MATD)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2.90
Bid: 2.80
Ask: 3.00
Change: -0.10 (-3.33%)
Spread: 0.20 (7.143%)
Open: 3.00
High: 3.00
Low: 2.80
Prev. Close: 3.00
MATD Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Operational update - 3D seismic campaign

24 Oct 2017 07:20

RNS Number : 4249U
Petro Matad Limited
24 October 2017
 

24 October 2017

Petro Matad Limited

("Petro Matad" or the "Company")

Operational update - 3D seismic campaign

Petro Matad (AIM: MATD) is pleased to provide an operational update.

Seismic Acquisition Campaign

· The Company has signed the contract with BGP Inc (a divisions of China National Petroleum Company) for 3D and 2D seismic work in Blocks IV and V

· Preliminary mobilization and camp construction is already underway, allowing for immediate preparatory and long lead work to begin

· The 218km2 3D survey in Blocks IV and V will be the first ever 3D seismic acquired in western Mongolia

Further to its announcement of 4 October 2017, the Company is pleased to provide the timelines and details regarding the planned seismic work programme following the signing of the BGP contract, as detailed further below. The 220km2 3D survey will be the first ever 3D seismic acquired in western Mongolia. It will be conducted over the Tugrug Basin of eastern Block V, a longstanding priority basin for Petro Matad with a proven working petroleum system including mature source rock, reservoir rocks with good porosity & permeability and live hydrocarbon staining found in previous stratigraphic coring operations. 

The survey in the Tugrug Basin of Block V is expected to begin 3D data recording operations by mid-November and to be completed by mid-December, 2017. The crew will then begin a 150 line km infill 2D survey in the same area, extending outward from the 3D, to cover surrounding prospects and leads. No camp move is required so the 2D acquisition can begin seamlessly after completion of the 3D. As such, the estimated completion date of the Tugrug Basin 2D program will be two weeks after the 3D. 

Following completion of the Tugrug Basin 2D, the crew and camp will move 350km NW into Block IV to acquire a new 205 line km 2D seismic grid over the Khangai Basin. The Khangai Basin is a deep and prospective basin in north-central Block IV. It has been high graded following the results of the airborne FTG/HRAM survey of 2015. Whilst only two regional 2D seismic lines currently cross the Khangai Basin, these lines show adequate basinal depths (3500M-4000M) and prospective structural and stratigraphic configurations. The Khangai Basin 2D survey is projected to start in late December, and complete before the end of January 2018.

Processing of both the 3D and 2D data has been contracted to Western GeCo (a division of Schlumberger Limited). The data will be delivered to the processors in near real time to allow maximum efficiency and return of processed data to the Company. Both the 3D and 2D programs are focused on high grading specific leads and prospects to potential drilling targets for the 2018/19 operational seasons.

-Ends -

 

For more information, please contact:

 

Petro Matad Limited

 

John Henriksen, CFO

+97 670 141 099 / +97 675 751 099

 

NOMAD and Broker

Stockdale Securities Limited

 

Richard Johnson / Elhanan Lee

+44 (0)20 7601 6100

 

 Business Advisory Firm

 FTI Consulting

 Edward Westropp +44 (0)20 3727 1521

 

About Petro Matad

Petro Matad is the parent company of a group focussed on oil exploration, as well as future development and production in Mongolia. At the current time, Petro Matad holds the sole operatorship of three Production Sharing Contracts with the Government of Mongolia. Block XX has an area of 10,340 km² in the far eastern part of the country, and Blocks IV and V have an area of 28,900 km2 and 21,100 km2, respectively, in the southwest part of the country.

Petro Matad Limited is incorporated in the Isle of Man under company number 1483V. Its registered office is at Victory House, Prospect Hill, Douglas, Isle of Man, IM1 1EQ.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
UPDQZLBLDBFFFBD
Date   Source Headline
29th Oct 20157:00 amRNSOperational Update
29th Sep 20157:00 amRNSInterim results for 6 months ended 30 June 2015
13th Aug 20158:22 amRNSContract award for 2D Seismic
7th Aug 20157:00 amRNSContract award
27th Jul 20157:00 amRNSDirectors Dealing & Issue of Equity
21st Jul 20157:00 amRNSDirectors' Dealing
17th Jul 20157:00 amRNSAppointment of Chairperson and CEO
29th Jun 20158:50 amRNSFinal Results - Replacement
29th Jun 20157:00 amRNSFinal results for year ended 31 December 2014
22nd Jun 20157:00 amRNSFarm-out and Operational Update
11th Jun 20157:00 amRNSCompany Update
17th Apr 20157:00 amRNSIssue of Equity and Directors' Dealing
13th Apr 20151:27 pmRNSDirector/PDMR Shareholding
7th Apr 201511:02 amRNSFarm-out agreement
16th Mar 201512:31 pmRNSStmnt re Share Price Movement
28th Nov 201412:56 pmRNSBoard Changes
24th Nov 20144:30 pmRNSDirectorate Change
21st Nov 201412:16 pmRNSResult of AGM
29th Oct 20147:00 amRNSNotice of AGM
3rd Oct 20147:00 amRNSIssue of Equity and Total Voting Rights
22nd Sep 20147:00 amRNSHalf Yearly Report
30th Jun 20147:00 amRNSFinal Results
7th May 20147:00 amRNSOperational Update
12th Mar 201410:38 amRNSPresentation at APPEX
5th Feb 20147:00 amRNSAttendance at NAPE and change to Adviser's role
9th Jan 20148:56 amRNSShare price movement
2nd Dec 20139:05 amRNSTotal Voting Rights
27th Nov 20137:00 amRNSIssue of Equity and Total Voting Rights
21st Nov 20137:00 amRNSOperational Update
6th Nov 20137:00 amRNSManagement Changes
6th Nov 20137:00 amRNSOperational Update
23rd Sep 20137:06 amRNSHalf Yearly Report
16th Sep 20137:00 amRNSAward of seismic contract
11th Sep 20132:35 pmRNSResult of AGM
19th Jul 201312:25 pmRNSHolding(s) in Company
28th Jun 20137:00 amRNSFinal Results
12th Jun 201311:15 amRNSFundraising
8th Feb 20137:00 amRNSDirector Declaration
7th Feb 20137:00 amRNSPresentation at Oil Barrel Conference
25th Jan 20139:43 amRNSIssue of Equity
20th Dec 20127:05 amRNSOperations Update
20th Dec 20127:00 amRNSBoard Changes
30th Nov 20127:00 amRNSBoard Change
21st Nov 20128:00 amRNSHolding(s) in Company
28th Sep 20127:00 amRNSHalf Yearly Report
14th Sep 201211:54 amRNSChair Change
12th Sep 201211:34 amRNSResult of AGM
30th Aug 20127:00 amRNSExtension of Exploration Period of Block XX
7th Aug 20127:00 amRNSAppointment of Exploration Manager
1st Aug 20127:00 amRNSNotice of AGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.