Less Ads, More Data, More Tools Register for FREE

Pin to quick picksLandore Regulatory News (LND)

Share Price Information for Landore (LND)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2.70
Bid: 2.60
Ask: 2.80
Change: 0.00 (0.00%)
Spread: 0.20 (7.692%)
Open: 2.70
High: 2.70
Low: 2.70
Prev. Close: 2.70
LND Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling Update - Junior Lake Nickel Project

8 Apr 2013 07:00

RNS Number : 7245B
Landore Resources Limited
08 April 2013
 



LANDORE RESOURCES LIMITED

(AIM Ticker: LND.L)

 

 

DRILLING UPDATE

THE SCORPION NICKEL-COPPER-COBALT-PGEs PROJECT

JUNIOR LAKE PROPERTY

 

London, United Kingdom - 8th April 2013 - Landore Resources Plc ( AIM:LND) ("Landore Resources" or the "Company") today announces a drilling update on its Scorpion Zone Nickel-Copper-Cobalt-PGEs project on the Junior Lake Property, Ontario, Canada.

 

Highlights:

 

·; Drilling on the exploration target immediately west of the B4-7 deposit within the Scorpion Zone ("Exploration Target") successfully intersected massive sulphide mineralisation, with drill-hole 0413-470 reporting 5 metres at 0.87% Ni, 0.53% Cu, 0.08% Co, and 531ppb Pd.

·; Alpha Zone mineralisation has also been intersected in the Exploration Target, with drill hole 0413-470 reporting 3 metres at 0.73% Ni, 0.15% Cu, 0.04% Co, 3,283ppb Pd, and 240ppb Pt.

·; Landore has initiated Pre-Feasibility Studies on the combined B4-7 Nickel-Copper-Cobalt-PGEs deposit and VW Nickel Deposit.

 

The recently completed drilling program on the Scorpion Zone has confirmed the continuation of the B4-7 massive sulphide mineralisation between the existing intercepts on line 175W and 300W, and further validates the Exploration Target which contains a potential 1.5 Mt to 2.0 Mt of sulphide mineralisation of similar grade range to that which has been outlined to date.

 

B4-7 main zone intersections include:

Drill-hole

From

Width*

Ni

Cu

Co

Pd

Pt

Au

No

Metres

Metres

%

%

%

ppb

ppb

ppb

0413-469

413.00

11.00

0.38

0.23

0.04

274

73

15

including

414.00

3.00

0.63

0.23

0.05

389

183

28

0413-470

453.00

31.00

0.31

0.29

0.04

276

98

10

including

467.00

3.00

0.80

0.39

0.09

636

271

12

and

472.00

1.00

0.18

1.50

0.12

217

81

10

0413-470

488.00

5.00

0.87

0.53

0.08

531

36

17

including

489.00

1.00

0.46

1.17

0.06

379

14

36

0413-472

543.67

6.08

0.49

0.26

0.05

414

34

18

including

543.67

1.33

0.91

0.01

0.07

695

83

19

*The actual true thickness of mineralisation is estimated to represent between 60-70% of the intervals shown in the above table.

 

Alpha Zone

Drilling on the Exploration Target has also intersected Alpha Zone style disseminated sulphide mineralisation. The Alpha Zone contains significant palladium with elevated nickel, copper, cobalt, platinum and gold. This zone is found in both the open pit and underground portions of the B4-7 deposit.

 

Alpha Zone/Hanging wall intersections include:

Drill-hole

From

Width*

Ni

Cu

Co

Pd

Pt

Au

No

Metres

Metres

%

%

%

ppb

ppb

ppb

0413-470

400.00

3.00

0.73

0.15

0.04

3,283

240

15

including

401.00

1.00

1.34

0.09

0.07

3,790

139

9

0413-471

393.00

6.00

0.29

0.22

0.01

736

110

38

And

408.00

1.00

0.25

0.11

0.02

2,890

580

25

0413-473

425.00

1.00

0.51

0.14

0.03

1,880

112

5

*The actual true thickness of mineralisation is estimated to represent between 60-70% of the intervals shown in the above table.

 

Alpha Zone mineralisation has not been included in the B4-7 resource due to its complexity along strike. Landore Resources has retained RPA Inc, of Toronto, Canada ("RPA") to conduct a study into the Alpha Zone style mineralization so as to better understand the structural, lithological, and genetic characteristics of this style of mineralization. Should these studies provide positive results, the potential exists to consider portions of the Alpha Zone as mineral resources.

 

The Junior Lake property:

The Junior Lake property, 100% owned by Landore Resources, is located in the province of Ontario, Canada, approximately 235 kilometres north-northeast of Thunder Bay, and is host to; the Scorpion Zone which contains the B4-7 Nickel-Copper-Cobalt-PGEs deposit, the Alpha Zone and the recently-identified Exploration Target. Junior Lake also contains the VW Nickel deposit and numerous other highly prospective mineral occurrences.

 

The Scorpion Zone:

The Scorpion Zone is a distinctive geophysical magnetic anomaly located approximately 3 kilometres to the northwest of the VW deposit and is host to the B4-7 deposit together with the Alpha Zone and Exploration Target. The zone extends 500 metres to the east of the 00 base line of the B4-7 deposit and extends 1,000 metres to the west of line 00 where it is truncated by the Juno Lake shear, and curls north and then to the east around a prominent 150 metre diameter magnetic low.

 

The B4-7 deposit resource estimate and report, completed by RPA in January 2013, identified 2,695,000 tonnes at 1.24% Nickel equivalent (NiEq) for 33,248 tonnes of contained metal, all in the Indicated category. The deposit remains open down plunge at depth and along strike to the west. The report also identified the potential Exploration Target to the immediate west of the B4-7 deposit.

 

The recently completed winter drilling programme, consisting of 14 NQ diamond drill-holes from 0413-463 to 0413-476 for 5,172 metres, was concentrated on the potential Exploration Target, together with its extension to the west. Results are pending for drill-holes 0413-474 to 0413-476 inclusive and will be reported when received.

 

2013 Planned Works:

Pre-feasibility studies, including metallurgical and geotechnical works, on the combined B4-7 and the VW deposits have been initiated with selection of independent engineers in progress.

A drill program for metallurgical, geotechnical and infra-structure condemnation is currently being prepared to be carried out during Q2/3.

 

QAQC

Landore has in place a stringent quality assurance and quality control programme to ensure best practices in sampling and assaying. All samples from the B4-7 project were collected by employees of Landore and shipped directly to ALS Laboratories, Thunder Bay, (ISO 9001 Certified) for preparation and assay in sealed bags. All samples are assayed for gold, platinum and palladium by fire assay, and nickel, copper, and cobalt by aqua regia digestion with AA finish, according to ALS's procedures PGM-ICP23, Ni Cu AA46, and Co AA45. Inductively-coupled plasma ("ICP") analyses for a suite of multi-elements (35 elements, including base metals and silver) were performed by procedure ME-ICP41.

 

Michele Tuomi, (P.Geo., BSc. Geology), Exploration Manager of Landore Resources Canada Inc. and a qualified person as defined in the Canadian National Instrument 43-101, has reviewed and verified all scientific or technical mining disclosure contained in this announcement.

 

- ENDS -

About Landore Resources

 

Landore Resources is an exploration company that seeks to grow shareholder value through the acquisition, exploration and development of precious and base metal projects in eastern Canada. The Company is primarily focused on the development of the Junior Lake Nickel Project, anticipated to enter into pre-feasibility stage Q1 2013. Landore Resources has mineral rights to 5 properties in eastern Canada. The Company is headquartered in London, UK, with an exploration office located in Thunder Bay, Ontario, Canada.

 

Landore Resources is listed on the AIM market of the London Stock Exchange under the symbol LND.

 

Cautionary Statement Regarding Forward-Looking Information

This news release includes certain information that may constitute "forward-looking information" under applicable securities legislation. Forward looking information includes, but is not limited to, forecasts as to free-cash flow, strategic plans, mineral resources estimates, future operations, results of exploration, future works programs, capital expenditures and objectives. Forward-looking information is necessarily based on a number of estimates and assumptions that, while considered reasonable, are subject to known and unknown risks, uncertainties, and other factors which may cause the actual results and future events to differ materially from those expressed or implied by such forward-looking information, including the risks identified in the Company's public disclosure. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance on forward-looking information. All forward-looking information contained in this press release is given as of the date hereof and is based upon the opinions and estimates of management and information available to management at the date hereof. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, except as required by law.

 

For more information please contact:

 

Bill Humphries, Chairman

Richard Prickett, Chief Executive Officer

Landore Resources Limited

Tel: 07734 681262

Tel: 07775 651421

www.landore.com

Angela Hallett / James Spinney

Strand Hanson Limited

Nominated Adviser

 

Dominic Morley / Adam Pollock

Panmure Gordon & Co

Broker

 

Tel: 020 7409 3494

 

 

 

Tel: 020 7886 2500

David Bick

Tel: 07831 381201

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLLLFLSSVIEIIV
Date   Source Headline
15th Aug 20197:00 amRNSHalf-year Report
25th Jul 20194:14 pmRNSAward of Options
24th Jul 20191:25 pmRNSResult of AGM
17th Jul 20193:51 pmRNSAdmission Date for Subscription Shares
3rd Jul 20197:00 amRNSSubscription to raise £250,000
19th Jun 20197:00 amRNSFinal Results
12th Jun 20197:00 amRNSDrilling and Exploration Programme Commences
4th Jun 201912:31 pmRNSDirectors Subscription
31st May 20194:29 pmRNS£1 million Fundraising
4th Mar 20197:00 amRNSNew Corporate Presentation
20th Feb 20197:00 amRNSTechnical Report & Preliminary Economic Assessment
5th Feb 20197:00 amRNSDETAILED METALLURGICAL ASSESSMENT BAM GOLD DEPOSIT
8th Jan 20197:00 amRNSBAM Gold Deposit Mineral Resource Estimate Update
13th Dec 20187:00 amRNSBAM Gold Deposit
11th Dec 20187:00 amRNSChange of Adviser
26th Oct 201810:00 amRNSHolding(s) in Company
25th Oct 20186:00 pmRNSHolding(s) in Company
24th Oct 20187:04 amRNSBAM Gold Deposit Update
24th Sep 20187:00 amRNSProgress Report - Bam Gold Deposit
19th Sep 20187:00 amRNSHalf-year Report
7th Aug 20187:00 amRNSMineral Resource Estimate Update
20th Jul 201811:00 amRNSHolding(s) in Company
19th Jul 201812:00 pmRNSResult of AGM
17th Jul 20187:00 amRNSProgress Report - BAM Gold Deposits
1st Jun 20187:00 amRNSFinal Results
30th May 20187:00 amRNSProgress Report - BAM Gold Deposit
26th Apr 20187:00 amRNSUpdate on BAM East Gold Deposit
11th Apr 20187:00 amRNSMineral Resources Estimates, Junior Lake
10th Apr 20184:45 pmRNSHolding(s) in Company
10th Apr 20184:30 pmRNSHolding(s) in Company
10th Apr 20183:00 pmRNSHolding(s) in Company
3rd Apr 201811:48 amRNSResult of Extraordinary General Meeting
16th Mar 20182:45 pmRNSAppointment of broker
16th Mar 20181:00 pmRNS£3.15 million Fundraising
7th Feb 20187:00 amRNSNew Corporate Presentation
5th Feb 20187:00 amRNSUpdated Mineral Resource Estimate
22nd Dec 20177:00 amRNSAward of Share Options
11th Dec 20177:05 amRNSUpdated Mineral Resource Estimate - BAM East
6th Nov 20177:00 amRNSJunior Lake and Lamaune Update
30th Oct 20172:03 pmRNSHolding(s) in Company
26th Oct 20178:00 amRNSHolding(s) in Company
19th Oct 20177:00 amRNSLandore Resources raises £1 million
11th Oct 201711:47 amRNSResult of Lamaune Special Meeting
9th Oct 20177:00 amRNSUpdate on BAM East Gold Deposit
4th Oct 20177:00 amRNSUpdate on BAM East Gold Project
27th Sep 20177:00 amRNSInterim Results
21st Sep 20174:00 pmRNSHolding(s) in Company
18th Sep 20177:00 amRNSUpdate on BAM East Gold Project
13th Sep 20177:00 amRNSDebt Settlement Agreement with Lamaune Iron Inc.
27th Jul 20177:00 amRNSUpdate on BAM East Gold Project

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.