Less Ads, More Data, More Tools Register for FREE

Pin to quick picksLandore Resources Limited Regulatory News (LND)

Share Price Information for Landore Resources Limited (LND)

Share Price is delayed by 15 minutes
Get Live Data
1.85    0.00 (0.00%)
Bid:
0.00
Ask:
0.00
Spread: 0.30 (17.647%)
Market Cap: £6.87m
LND Live PriceLast checked at - London Stock Exchange

Intraday Landore Resources Limited Share Chart

Drilling and Exploration Programme Commences

12 Jun 2019 07:00

RNS Number : 8628B
Landore Resources Limited
12 June 2019
 

LANDORE RESOURCES LIMITED

(AIM Ticker: LND.L)

 

 

DRILLING AND EXPLORATION PROGRAMME COMMENCES

BAM GOLD PROJECT

JUNIOR LAKE PROPERTY

 

 

London, United Kingdom 12 June 2019 - Landore Resources Limited (AIM: LND) ("Landore Resources" or "the Company") is pleased to announce the commencement of the recently funded drilling and exploration programme (the "Drilling Programme") on the BAM Gold Deposit, Junior Lake Property, Ontario, Canada ("BAM East Gold Deposit").

 

Highlights:

 

· A Drilling Programme, consisting of 4,500 metres of HQ diamond core, has commenced on the BAM Gold Deposit aimed at further infilling and extending the defined resource of 951,000 ounces of gold.

 

· In addition an extensive exploration campaign, including ground geophysics and soil sampling followed by selected line drilling, will be carried out on the highly prospective seven kilometres along strike between the BAM Gold Deposit and Lamaune Gold Exploration Target.

 

PLANNED WORKS:

Drilling: The defined NI43-101-compliant BAM Gold resource of 951,000 ounces extends over a distance of 1.7 kilometres within a drilled zone of 3.1 kilometre length. Infill drilling will be carried out within the remaining 1.4 kilometres to bring that section up to defined resource level.

 

In addition, extension drilling will be completed adjacent to the existing resource westwards for approximately 700 metres, following promising IP (Inverse Polarisation) geophysics results which indicate underlying structures similar to those within the existing resource. These geophysical results demonstrate a high potential that this area represents the western extension of the BAM Gold Deposit.

 

The recently completed estimation work modelled potential mineralised material within the above target areas for a possible 14,761,000t at 0.93g/t ounces gold for a further 441,000 ounces gold, in the 'Unclassified' material category.

Landore's 2019 drilling campaign is aimed at advancing the above 'Unclassified' material into the resource category

 

The BAM Gold Deposit remains open at depth and along strike to the east and to the West.

 

Exploration: The zone along strike for seven kilometres between the BAM Gold Deposit and the Lamaune Gold Exploration Target has been previously lightly explored for base metals and is traversed by the highly prospective East-West trending 'Grassy Pond Gabbro Sill' which contains the BAM Gold Deposit along its northern flank.

 

There are two previously drilled prospects along this zone, Windy Hill and Felix, with similar lithology to BAM Gold containing anomalous to medium grade gold. Felix is currently being re-logged with prospective sections being cut and assayed. Field exploration in 2004 identified other prospective sections in the above zone containing sediments adjacent to the Grassy Pond Gabbro Sill.

A major portion of the BAM Gold mineralisation itself resides within metasedimentary rock adjacent to the Grassy Pond Gabbro Sill.

 

BAM GOLD DEPOSIT: 

The BAM Gold Deposit is located in the south central area of the Junior Lake property and is interpreted as an Archean-aged mesothermal gold deposit in which gold mineralisation is hosted by sheared and altered rocks of the Grassy Pond (Gabbro) Sill and the BAM Sequence. The host rock units strike in an east-southeast direction (average of azimuth 105°) and dip steeply to moderately to the south at 70 to 75 degrees. The gold mineralisation is interpreted to reside within a series of tabular shaped zones that are oriented in a roughly en-echelon configuration and are generally parallel to the overall strike of the host rock units.

 

The 2018 summer drill campaign concentrated on infilling and extending the existing BAM Gold Deposit, the results of which were subsequently used to complete a revised Mineral Resource Estimate and prepare a Preliminary Economic Assessment ("PEA") with Technical Report, reported by Landore on 8th January and 20th February 2019 respectively.

 

BAM Gold Resource: The new Mineral Resource Estimate (MRE) modelling significantly increased the BAM Gold resource to: 28,826,000 tonnes (t) at 1.03 grams/tonne (g/t) for 951,000 ounces of gold including 20,198,000t at 1.08g/t for 701,000 ounces gold in the Indicated Category.

 

Drilling on BAM Gold to date has recorded a success rate of 30.1 ounces gold for every metre drilled with an average discovery cost of US$8.36 per ounce placing BAM in the lowest quartile of discovery within the Gold Industry.

The continued rapid growth of the BAM Gold Deposit together with the possible future development of the other known gold prospects such as Lamaune plus the likelihood of new discoveries along this highly prospective 31 kilometre long Archean greenstone belt bodes well for the future of the Junior Lake Property hosting a multi- million ounce gold deposit.

BAM Gold PEA: The BAM Project Base case considered the economics of exploiting a resource of 12.7 Mt at 1.26 g/t Au containing 515,000 ounces gold (koz Au). An 'Extended' (or upside) case considers a 19.7 Mt resource also at 1.26 g/t Au containing 800 koz Au.

At US$1,300/ounce the Base case generates a post-tax net present value ("NPV") of US$69.2M with an internal rates of return "(IRR") of 22.4%. The 'Extended' case generates a post-tax NPV5 of US$123.7M and post-tax real IRR of 26.9%.

The Base case has an all-in-sustaining cost ("AISC") of US$ 806/oz with the 'Extended' case being slightly higher at US$ 816/oz. Initial CAPEX is US$73.53M for Plant and infrastructure plus US$ 20.28M for pre-production including mining and G+A

The PEA demonstrated the economic viability of this project as well as its high growth potential, and has reinforced Landore's opinion that in the initial stage the BAM Gold Project can be developed as a low-cost open pit mining operation.

 

LAMAUNE GOLD:

Lamaune Gold is situated within the Lamaune Iron Property and is located approximately 10 kilometers from the BAM Gold Deposit.

 

The Lamaune Gold deposit is an Advanced Exploration Target associated with the Lamaune Iron deposit and located in close proximity to, but not in, the banded iron formation (BIF). Lamaune Gold was discovered in late 2008 by sampling prospective structures and sulphide mineralization of the Lamaune Iron diamond drill core for gold.  (Reported 5th October 2010)

A drill campaign, consisting of 75 drill holes for a total of 11,644 metres, was completed on Lamaune Gold in the 2009/10 drilling programs. Drilling intersected narrow vein high grade gold and wide zones of lower grade gold mineralization, including:

 

0.60 metres @ 118.66 g/t Au in drill hole 1110-88

21.50 metres @ 0.99 g/t Au in drill hole 1109-83

 

A review and conceptual model of the Lamaune gold deposit defined an initial exploration target of 1,350,000 to 1,650,000 tonnes of mineralised material containing between forty to fifty thousand ounces of gold (oz-Au) at a cut-off grade of 0.3 grams per tonne (g/t).

The deposit remains open at depth and to the west along strike.

 

The Junior Lake Property:

The Junior Lake Property, 100% owned by Landore Resources, together with the contiguous Lamaune Iron property (90.2% owned) (jointly the "Junior Lake Property"), consisting of 30,507 hectares, is located in the province of Ontario, Canada, approximately 235 kilometres north-northeast of Thunder Bay and is host to: The BAM Gold Deposit; the B4-7 Nickel-copper-cobalt-Platinum-Palladium-gold Deposit; the VW Nickel-Copper-cobalt Deposit; Lamaune Gold Prospect and numerous other precious and base metal occurrences.

A highly prospective Archean greenstone belt traverses the Junior Lake Property from east to west for approximately 31 kilometres. The greenstone belt ranges from 0.5 to 1.5 kilometres wide and contains all of Landore Resources' stated mineral resources and prospects. However, the greater proportion of this belt remains unexplored.

 

Michele Tuomi, (P.Geo., BSc. Geology), Director/VP Exploration of Landore Resources Canada Inc. and a Qualified Person as defined in the Canadian National Instrument 43-101 and the AIM Rules for Companies, has reviewed and verified all scientific or technical mining disclosure contained in this announcement.

 

- ENDS -

About Landore Resources

Landore Resources is an exploration company that seeks to grow shareholder value through the acquisition, exploration and development of precious and base metal projects in eastern Canada. The Company is primarily focused on the development of the Junior Lake Project. Landore Resources has mineral rights to 5 properties in eastern Canada. The Company is headquartered in Guernsey, with an exploration office located in Thunder Bay, Ontario, Canada.

 

For more information, please contact:

Bill Humphries, Chief Executive Officer Tel: 07734 681262

Richard Prickett, Finance Director Tel: 07775 651421

Landore Resources Limited www.landore.com

 

Derrick Lee / Beth McKiernan / Peter Lynch Tel: 01312209771

Cenkos Securities plc

Nominated Advisor and Broker

 

This announcement contains inside information as defined in Article 7 of the Market Abuse Regulation No 596/2014.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLLLFSVRDILLIA
Date   Source Headline
4th Jun 20267:00 amRNS-RCorporate Presentation and Newsletter
3rd Jun 20267:00 amRNSFinal Results for the Year Ended 31 December 2025
7th May 20267:00 amRNSCorporate Update and 2026 Field Programme
5th May 20267:00 amRNSAppointment of Nominated Adviser and Joint Broker
1st May 20267:00 amRNSDirectorate change
31st Mar 20267:06 amRNS-RAwarded OJEP Grant
16th Feb 20267:00 amRNSCompletion of Storm Option Agreement
22nd Jan 20267:30 amRNSRestoration - Landore Resources Limited
22nd Jan 20267:00 amRNSUpdated Mineral Resource Estimates for Junior Lake
21st Jan 20267:00 amRNSUpdate re Suspension of Trading on AIM
2nd Jan 20267:00 amRNSUpdate on Suspension of Trading on AIM
2nd Jan 20267:00 amRNSUpdate on Suspension of Trading on AIM
11th Dec 20253:31 pmRNSTemporary Suspension of Trading on AIM
11th Dec 202512:59 pmRNSSuspension - Landore Resources Limited
3rd Dec 20257:00 amRNSStorm Enters Agreement to Sell Miminiska Project
10th Nov 20257:00 amRNSAmalgamation of Landore Canada and Lamaune
27th Oct 20257:00 amRNS£1,465,000 Equity Fundraise
17th Oct 20254:39 pmRNSExercise of Warrants and Issue of Equity
16th Oct 20257:00 amRNSAppointment of Alexander Shaw to Storm Board
29th Sep 20258:52 amRNSInterim Results
5th Aug 20254:11 pmRNSResult of Annual General Meeting
27th Jun 20256:10 pmRNSFinal Results and Notice of Annual General Meeting
18th Jun 20257:00 amRNSPositive Drill Campaign Results at BAM
6th May 20257:00 amRNSDrilling Campaign at BAM Gold Project Completed
25th Apr 20257:58 amRNSCompletion of BAM Mineral Rights Acquisition
4th Apr 20251:08 pmRNSDirector’s Dealing
26th Mar 20257:00 amRNSAcquisition of Additional BAM Mineral Rights
24th Mar 20257:00 amRNSReceipt of Option Payment from Storm
17th Mar 20257:00 amRNSDrilling Programme Commences on BAM
3rd Mar 20257:00 amRNSDrill Core Sampling Identifies Gold Upside
3rd Mar 20257:00 amRNSExercise of Warrants and Issue of Equity
12th Feb 20257:00 amRNSSampling Programme Identifies New Gold Anomalies
19th Dec 20247:00 amRNSAppointment of Joint Broker
13th Nov 20247:00 amRNSReceipt of Option Payment from Storm
30th Sep 20247:00 amRNSInterim Results to 30 June 2024
16th Sep 20247:00 amRNSBAM Gold Project Update
19th Aug 20247:00 amRNSUpdate on Option Agreement
17th Jul 20247:00 amRNSNotification of Major Holdings
16th Jul 202412:21 pmRNSCORRECTION: Notification of Major Holdings
16th Jul 20247:00 amRNSNotification of Major Holdings
12th Jul 20243:03 pmRNSNotification of Major Holdings
8th Jul 20241:23 pmRNSRESULT OF AGM, DIRECTORATE CHANGE & TVR
3rd Jul 20243:30 pmRNSOPTION AGREEMENT ON MIMINISKA LAKE & KEEZHIK LAKE
24th Jun 202412:30 pmRNSPosting of 2023 Annual Report and Notice of AGM
21st Jun 20242:30 pmRNSHolding(s) in Company
17th Jun 20247:00 amRNSFinal Results and Notice of AGM
12th Jun 20247:00 amRNSFundraise, Proposed CEO Appointment & Board Change
28th May 20247:00 amRNSStorm Option Agreement and Corporate Updates
15th Feb 20247:00 amRNS2023 Soil Sampling Identifies New Gold Trends
8th Feb 20246:09 pmRNSFurther Amendment to Storm Option Agreement

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.