Less Ads, More Data, More Tools Register for FREE

Pin to quick picksLandore Regulatory News (LND)

Share Price Information for Landore (LND)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2.70
Bid: 0.00
Ask: 0.00
Change: 0.00 (0.00%)
Spread: 0.20 (7.692%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 2.70
LND Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling Update - Junior Lake Nickel Project

18 Apr 2012 07:00

RNS Number : 5178B
Landore Resources Limited
18 April 2012
 



LANDORE RESOURCES LIMITED

(AIM Ticker: LND.L)

 

 

DRILLING UPDATE

JUNIOR LAKE NICKEL PROJECT

 B4-7 DEPOSIT

 

Highlights: 

 

·; The current drilling campaign on the eastern section of the B4-7 deposit has significantly enhanced the volume of B4-7 massive sulphide mineralisation within the upper 150-metre portion of the deposit along 475 metres of strike.

 

·; Drilling has consistently intersected massive sulphide mineralisation, including drill-hole 0412-378 reporting 23.97 metres with grades of 0.80% Nickel, 0.57% Copper, 0.07% Cobalt, 737ppb Palladium, and 124ppb Platinum.

 

·; The drilling has also successfully established continuity on the adjacent polymetallic zone ('alpha zone') along 375 metres of strike to date, including drill-hole 0412-370 reporting 3.00 metres at 2,134ppb Palladium, 171ppb Platinum, and 0.29% Nickel.

 

The current drilling campaign started in February 2012 is aimed at expanding the B4-7 deposit and providing adequate drill density to bring inferred portions of the deposit to indicated status. To date, 40 diamond core NQ size holes and 2 re-entered holes (0412-367 to 0412-406 and 0409-237/238) for 6,938 metres, have been completed. Assays are outstanding for 27 drill-holes and will be reported as they become available.

 

B4-7 mineralised intersections include: 

Drill-hole

From

Width*

Ni

Cu

Co

Pd

Pt

Au

No

Metres

Metres

%

%

%

ppb

ppb

ppb

0409-238

116.00

19.83

0.61

0.59

0.049

593

122

41

including

129.30

5.75

0.94

0.51

0.07

750

151

18

0412-371

57.50

17.38

0.79

0.43

0.06

816

176

15

including

57.50

7.50

0.97

0.52

0.06

1,033

215

22

0412-372

191.36

8.30

0.75

0.39

0.07

518

205

16

including

191.36

2.14

0.78

0.27

0.05

1,321

459

21

0412-374

96.60

13.96

0.71

0.61

0.07

591

98

31

0412-375

191.00

13.72

0.69

0.41

0.05

533

126

15

0412-378

46.90

23.97

0.80

0.57

0.07

737

124

22

including

61.5

7.50

0.93

0.69

0.06

1,055

198

20

0412-379

153.00

3.00

0.46

0.37

0.04

4,327

454

181

*The actual true thickness of mineralisation is estimated to represent between 75-80% of the intervals shown in the above table.

 

This campaign is also targeting the adjacent polymetallic zone (Alpha zone) located up to 70 metres to the north of the B4-7 main mineralized zone at 75W and merging with the main zone at approximately 350E. The Alpha zone consists of a series of sub-vertical contacts within metamorphosed gabbros, contains significant palladium and platinum, in addition to elevated nickel, copper and cobalt. Previously there were insufficient intersections of the Alpha zone for its inclusion into the resource. However the current drilling is successfully establishing continuity along strike.

 

Polymetallic alpha zone mineralised intersections include:

Drill-hole

From

Width*

Pd

Pt

Ni

Cu

Co

Au

No

Metres

Metres

ppb

ppb

%

%

%

ppb

0409-237

33.00

3.00

6,139

1,381

0.33

0.06

0.02

20

including

34.00

1.00

13,100

2,580

0.49

0.04

0.02

48

and

59.16

0.59

5,180

1,321

1.45

0.31

0.06

29

0412-369

90.95

1.85

1,557

331

0.53

0.09

0.03

3

0412-370

171.00

3.00

2,134

171

0.29

0.06

0.02

11

and

205.37

6.48

1,263

200

0.14

0.13

0.01

6

*The actual true thickness of mineralisation is estimated to represent between 75-80% of the intervals shown in the above table.

 

The Junior Lake property:

The Junior Lake property, 100% owned by Landore, is located in the province of Ontario, Canada, approximately 235 kilometres north-northeast of Thunder Bay, and is host to; the VW Nickel deposit; the B4-7 Nickel-Copper-Cobalt-PGMs deposit; the B4-8 prospect and numerous other highly prospective mineral occurrences.

 

The combined resources (Canadian National Instrument (NI) 43-101 compliant) of the VW and B4-7 deposits delineated to date, total 48,281 tonnes of nickel equivalent (NiEq), 82 per cent of which is in the Indicated category. Both deposits remain open down dip and along strike to the east and west.

 

Landore believes that for the Junior Lake Nickel projects to be economically viable, the above tonnage needs to be increased by 20 to 30 %. Accordingly, Landore's exploration effort is now focused on the discovery of additional mineralisation in the vicinity of the two main deposits.

 

B4-7 Nickel-Copper-Cobalt-PGEs deposit:

The B4-7 deposit is located approximately 3 kilometres to the northwest of the VW deposit. The B4-7 deposit mineralisation is hosted within a sub-vertical massive sulphide vein with stringers, net-textured and disseminated sulphides in the immediate hanging wall. In Q1 2010, an NI 43-101 compliant report and resource estimate upgrade for the B4-7 deposit was completed. The resource reported 26,521 tonnes NiEq, at a 0.25% Nickel cut-off.

 

The B4-7 deposit, so far delineated over 650 metres of strike, remains open to the east and west along strike and down plunge to the northwest. A previously completed airborne electromagnetic survey suggests the conductive horizon hosting the B4-7 deposit persists for an additional 800 metres to the west.

 

2012 Planned Works:

The results of the current drilling campaign on the B4-7 deposit are highly encouraging having significantly increased the potential tonnage amenable to open pit development. Landore will utilize these drilling results to produce an updated resource estimate, anticipated for completion in Q3, 2012. Pre-feasibility studies on the combined B4-7 and the VW deposits will be initiated in Q4 2012.

 

 

Michele Tuomi, (P.Geo., BSc. Geology), a Senior Geologist of Landore Resources Canada Inc. and a qualified person as defined in the Canadian National Instrument 43-101, has reviewed and verified all scientific or technical mining disclosure contained in this announcement.

 

- ENDS -

 

For more information please contact:

 

Bill Humphries, Chairman

Richard Prickett, Chief Executive Officer

Landore Resources Limited

Tel: 07734 681262

Tel: 07775 651421

www.landore.com

Simon Raggett /Angela Peace

Strand Hanson Limited

Nominated Adviser/ Broker

Tel: 020 7409 3494

 

David Bick

Tel: 07831 381201

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLLLFFSSAIDLIF
Date   Source Headline
23rd Sep 20147:00 amRNSInterim Results
15th Sep 20147:00 amRNSDrilling Results
19th Aug 20147:00 amRNSDrilling Update
22nd Jul 20147:00 amRNSGrant of Options
17th Jul 201412:00 pmRNSHolding(s) in Company
7th Jul 20147:00 amRNSOversubscribed Placing and Subscription
2nd Jul 20143:33 pmRNSResult of AGM
28th May 20143:53 pmRNSChange of Broker
20th May 201412:18 pmRNSPosting of Annual Report
15th May 20147:00 amRNSFinal Results
15th May 20147:00 amRNSAmendment to Loan Agreement with Lamaune Iron Inc.
23rd Apr 20147:00 amRNSJunior Lake Nickel-Copper Project Update
24th Mar 20147:00 amRNSProgress Update
18th Feb 20147:00 amRNS3D Geophysics Survey Complete
4th Feb 20147:00 amRNSCommencement of 3D Survey
13th Jan 20147:00 amRNSJunior Lake Geophysics Survey
25th Nov 20134:30 pmRNSGrant of Options
25th Oct 201311:19 amRNSHolding(s) in Company
15th Oct 20137:00 amRNSSubscription
30th Sep 20137:00 amRNSUpdate - Junior Lake Nickel-Copper Property
19th Sep 20137:00 amRNSHalf Yearly Report
1st Jul 201311:22 amRNSGrant of Options
20th Jun 201311:30 amRNSResult of AGM
14th May 20137:00 amRNSFinal Results
8th May 20137:00 amRNSChange of Adviser
8th Apr 20137:00 amRNSDrilling Update - Junior Lake Nickel Project
11th Mar 20137:00 amRNSSubscription
17th Jan 20137:00 amRNSResource Update - Junior Lake
12th Dec 20127:00 amRNSDrilling and Geophysical Survey Update
16th Oct 20127:00 amRNSDrilling, Geophysics Survey - Junior Lake
26th Sep 20122:45 pmRNSGrant of Options
20th Sep 201211:04 amRNSTotal Voting Rights
19th Sep 201210:14 amRNSAppointment of Broker
12th Sep 20127:00 amRNSSubscription
3rd Sep 20127:00 amRNSDrilling Update - Junior Lake Project
21st Aug 20127:00 amRNSHalf Yearly Report
25th Jul 20127:00 amRNSDrilling Report
12th Jul 20127:00 amRNSDrilling Update - Junior Lake Nickel Project
20th Jun 20123:11 pmRNSResult of AGM
20th Jun 20127:00 amRNSHolding(s) in Company
29th May 201211:26 amRNSFinal Results
22nd May 20127:00 amRNSDrilling Report
18th Apr 20127:00 amRNSDrilling Update - Junior Lake Nickel Project
21st Mar 20124:37 pmRNSGrant of options
13th Mar 201211:15 amRNSHolding(s) in Company
28th Feb 20127:00 amRNSAdditional Listing
21st Feb 201210:42 amRNSSubscription
23rd Jan 20127:01 amRNSDrilling Update - Junior Lake
3rd Nov 201111:36 amRNSDirector Declaration
2nd Sep 20117:00 amRNSInterim Statement

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.