Talon Resources Targets Ontario Gold Growth After AIM Move and Eagle Lake Acquisition, CEO Says. Watch here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksLandore Resources Limited Regulatory News (LND)

Share Price Information for Landore Resources Limited (LND)

Share Price is delayed by 15 minutes
Get Live Data
1.90    0.05 (2.70%)
Bid:
1.80
Ask:
2.00
Spread: 0.20 (11.111%)
Market Cap: £7.06m
LND Live PriceLast checked at - London Stock Exchange

Intraday Landore Resources Limited Share Chart

Drilling Update

11 Feb 2021 07:00

RNS Number : 6914O
Landore Resources Limited
11 February 2021
 

This announcement contains inside information as defined in Article 7 of the Market Abuse Regulation No 596/2014

 

LANDORE RESOURCES LIMITED

(AIM Ticker: LND.L)

 

 

 DRILLING UPDATE

BAM GOLD PROJECT

JUNIOR LAKE PROPERTY

 

 

London, United Kingdom 11th February 2021 - Landore Resources Limited (AIM: LND) ("Landore Resources" or "the Company") is pleased to provide an update on the progress of the drilling programme for 2020-21 (the "Drilling Programme") on the BAM Gold Deposit, Junior Lake Property, Ontario, Canada ("BAM Gold Deposit").

 

· The Drilling Programme continues with results received to-date confirming the depth and length extensions of the BAM west pit reporting widths and grades consistent with the defined resource. Visible Gold was reported in several intersections including drill-hole 0420-742 at 170.35m. See www.landore.com.

 

· Step out drilling to the east and west of the BAM Gold Deposit targets the highly anomalous gold trends established by the recently completed soil-till sampling program (reported 14th January 2021). Drilling has successfully traced the favourable lithologies and mineralized structures associated with the BAM Gold Deposit.

 

2020-2021 Winter Drilling Programme

The Drilling Programme is progressing as planned with a total of 10,719 metres of HQ diamond core drilling, comprising of 45 drill holes (0420-725 to 0421-769) completed to date. All drill holes have intersected prospective mineralised zones associated with the BAM Gold Deposit. 

 

Initial results include:

 

Easting

Northing

Drill-hole

From

Interval*

Au

 

 

No

Metres

Metres

g/t

00E

570N

0420-732

193.26

1.02

1.67

1050E

295N

0420-733

78.43

0.67

3.45

 

 

and

232.82

14.18

1.52

 

 

including

239.51

3.24

4.48

1150E

270N

0420-734

103.50

1.00

4.32

 

 

and

285.37

9.81

1.34

1450E

195N

0420-736

258.88

14.70

1.33

 

 

including

272.53

1.05

8.50

1500E

185N

0420-737

268.26

9.33

1.21

 

 

Including

268.26

1.08

6.34

1550E

190N

0420-739

259.46

6.85

1.76

2350E

85S

0420-738

324.38

9.90

1.09

 

* The above drill holes were drilled north at 45-52 degrees into a lithological package dipping approximately 85-75 degrees to the south. The actual true thickness of mineralisation is estimated to represent between 70-80% of the intervals shown in the above table.

 

Drilling Update-BAM Gold-

The Drilling Programme consisting of a total of 14,000 metres of HQ diamond core drilling, commenced on October 15th, 2020, was designed to further infill and extend the defined BAM Gold resource of 1,015,000 ounces.

 

a) Resource drilling: 3,476 metres have been completed through 16 drill holes located beneath the West defined pit from 1000E to 2000 E, to test for depth extension. All holes intersected typical BAM Gold lithology and mineralisation, including some with visible gold. Results received to date show widths and grades as previously seen for the West pit including drill hole 0420-733 reporting 14.18 metres at 1.52 g/t. Assay results are pending.

 

b) Resource drilling: 1,866 metres have been completed through 5 drill holes located beneath the East defined pit, 2,000E to 3,000E to test for depth extension. All holes intersected typical BAM Gold lithology and mineralisation. Assay Results are pending.

 

c) Exploration drilling: 1,632 metres have been completed to date through 8 drill holes to test the potential strike extension of the existing BAM Gold deposit for 2 kilometres further to the east from 3,000E to 5,000E. Drill holes have intersected typical BAM lithology. Assay results are pending.

 

d) Exploration drilling: 3,745 metres have been completed to date through 16 exploration drill holes to test the potential strike extension of the existing BAM Gold deposit for 1.2 kilometres to the west from 1000E to 200W. All holes intersected typical BAM lithology with assay results received to date for the first 8 holes reporting anomalous gold up to 1.67g/t. Assay results for the remaining holes are pending.

 

Note: Considerable delays in receiving assay results are being experienced in the exploration industry due to the Covid-19 pandemic together with the significant increase in drilling activity brought upon by the increase in metal prices, particularly gold. Consequently, ALS Minerals, one of the leading laboratories, has advised that a period of 8-10 weeks, from delivery of samples to the laboratory, is currently required for completion of full analysis.

 

BAM Geology and Mineralisation:

Interpretive work and conceptual modelling conducted by Landore's senior geological consultant and independent engineers has indicated the gold mineralization resides within a series of tabular shaped zones oriented in a roughly en-echelon configuration, generally parallel to the overall strike of the host rock units (east-southeast direction).

 

Shoots (Mullions) of significant gold mineralization within the BAM east pit and BAM west pit zones are interpreted to dip approximately 30º to the west. Preliminary interpretation of drilling results has indicated the potential for repeating shoots of significant gold mineralization along strike east and west of the defined BAM resource.

 

Results from the 2019/2020 soil-till sampling programs conducted west along strike for approximately 7 kilometres and east for approximately 2 kilometres from the BAM deposit further support the potential for significant gold mineralization in these areas. Soil-till sampling has established the presence of widespread anomalous gold and multiple gold trends, confirming this area's potential to contain extensions of the BAM Gold deposit.

 

Exploration drilling currently in progress will follow up on these encouraging results to confirm the presence of repeating gold-bearing shoots along strike east and west of the defined BAM Gold Deposit.

 

Planning: At the conclusion of the 2020-2021 Drilling programme the Company is planning to commission an updated Mineral Resource Estimate ("MRE") and Preliminary Economic Assessment ("PEA") on the BAM Gold Deposit.

 

BAM GOLD DEPOSIT:

The BAM Gold Deposit is located approximately mid-way along a highly prospective Archean greenstone belt which traverses the Junior Lake Property from east to west for approximately 31 kilometres. The favorable greenstone belt ranges from 0.5 to 1.5 kilometres wide and hosts multiple known gold occurrences including the Lamaune Gold Prospect.

 

Mineral Resource Estimate:

The Mineral Resource Estimate for the BAM Gold Deposit notified on 7th January 2020 reported 31,083,000 tonnes (t) at 1.02 grams/tonne (g/t) for 1,015,000 ounces of gold including 21,930,000t at 1.06g/t for 747,000 ounces gold in the Indicated category.

BAM Gold Resource and PEA:  

A Technical Report and Preliminary Economic Assessment of the BAM Gold Project was released on 20th February 2019 in compliance with the requirements of the Canadian National Instruments 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101").

 

The Junior Lake Property:

The Junior Lake Property, 100% owned by Landore Resources, together with the contiguous Lamaune Iron property (90.2% owned) (jointly the "Junior Lake Property"), consisting of 30,507 hectares, is located in the province of Ontario, Canada, approximately 235 kilometres north-northeast of Thunder Bay and is host to: The BAM Gold Deposit; the B4-7 Nickel-copper-cobalt-Platinum-Palladium-gold Deposit; the VW Nickel-Copper-cobalt Deposit; Lamaune Gold Prospect and numerous other precious and base metal occurrences.

 

Covid-19

The Company is following Government Covid-19 guidelines in its operations in Canada.

 

Michele Tuomi, (P.Geo., BSc. Geology), Director/VP Exploration of Landore Resources Canada Inc. and a Qualified Person as defined in the Canadian National Instrument 43-101 and the AIM Rules for Companies, has reviewed and verified all scientific or technical mining disclosure contained in this announcement.

 

- ENDS -

About Landore Resources

Landore Resources is an exploration company that seeks to grow shareholder value through the acquisition, exploration and development of precious and base metal projects in eastern Canada. The Company is primarily focused on the development of the Junior Lake Project. Landore Resources has mineral rights to 5 properties in eastern Canada. The Company is headquartered in Guernsey, with an exploration office located in Thunder Bay, Ontario, Canada.

 

For more information, please contact:

Landore Resources Limited

 

Bill Humphries, Chief Executive Officer

Tel: 07734 681262

Glenn Featherby, Finance Director

Tel: 07730 420318

 

 

Cenkos Securities (Nominated Advisor and Broker)

 

Derrick Lee / Peter Lynch

Tel: 0131 220 9100

 

 

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDDGGDDIGBDGBG
Date   Source Headline
17th Jul 20193:51 pmRNSAdmission Date for Subscription Shares
3rd Jul 20197:00 amRNSSubscription to raise £250,000
19th Jun 20197:00 amRNSFinal Results
12th Jun 20197:00 amRNSDrilling and Exploration Programme Commences
4th Jun 201912:31 pmRNSDirectors Subscription
31st May 20194:29 pmRNS£1 million Fundraising
4th Mar 20197:00 amRNSNew Corporate Presentation
20th Feb 20197:00 amRNSTechnical Report & Preliminary Economic Assessment
5th Feb 20197:00 amRNSDETAILED METALLURGICAL ASSESSMENT BAM GOLD DEPOSIT
8th Jan 20197:00 amRNSBAM Gold Deposit Mineral Resource Estimate Update
13th Dec 20187:00 amRNSBAM Gold Deposit
11th Dec 20187:00 amRNSChange of Adviser
26th Oct 201810:00 amRNSHolding(s) in Company
25th Oct 20186:00 pmRNSHolding(s) in Company
24th Oct 20187:04 amRNSBAM Gold Deposit Update
24th Sep 20187:00 amRNSProgress Report - Bam Gold Deposit
19th Sep 20187:00 amRNSHalf-year Report
7th Aug 20187:00 amRNSMineral Resource Estimate Update
20th Jul 201811:00 amRNSHolding(s) in Company
19th Jul 201812:00 pmRNSResult of AGM
17th Jul 20187:00 amRNSProgress Report - BAM Gold Deposits
1st Jun 20187:00 amRNSFinal Results
30th May 20187:00 amRNSProgress Report - BAM Gold Deposit
26th Apr 20187:00 amRNSUpdate on BAM East Gold Deposit
11th Apr 20187:00 amRNSMineral Resources Estimates, Junior Lake
10th Apr 20184:45 pmRNSHolding(s) in Company
10th Apr 20184:30 pmRNSHolding(s) in Company
10th Apr 20183:00 pmRNSHolding(s) in Company
3rd Apr 201811:48 amRNSResult of Extraordinary General Meeting
16th Mar 20182:45 pmRNSAppointment of broker
16th Mar 20181:00 pmRNS£3.15 million Fundraising
7th Feb 20187:00 amRNSNew Corporate Presentation
5th Feb 20187:00 amRNSUpdated Mineral Resource Estimate
22nd Dec 20177:00 amRNSAward of Share Options
11th Dec 20177:05 amRNSUpdated Mineral Resource Estimate - BAM East
6th Nov 20177:00 amRNSJunior Lake and Lamaune Update
30th Oct 20172:03 pmRNSHolding(s) in Company
26th Oct 20178:00 amRNSHolding(s) in Company
19th Oct 20177:00 amRNSLandore Resources raises £1 million
11th Oct 201711:47 amRNSResult of Lamaune Special Meeting
9th Oct 20177:00 amRNSUpdate on BAM East Gold Deposit
4th Oct 20177:00 amRNSUpdate on BAM East Gold Project
27th Sep 20177:00 amRNSInterim Results
21st Sep 20174:00 pmRNSHolding(s) in Company
18th Sep 20177:00 amRNSUpdate on BAM East Gold Project
13th Sep 20177:00 amRNSDebt Settlement Agreement with Lamaune Iron Inc.
27th Jul 20177:00 amRNSUpdate on BAM East Gold Project
5th Jul 201711:00 amRNSAward of Share Options
3rd Jul 201712:14 pmRNSResult of AGM
28th Jun 20177:00 amRNSUpdate on BAM East Gold Project

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.