Less Ads, More Data, More Tools Register for FREE

Pin to quick picksLandore Resources Limited Regulatory News (LND)

Share Price Information for Landore Resources Limited (LND)

Share Price is delayed by 15 minutes
Get Live Data
1.85    0.00 (0.00%)
Bid:
1.70
Ask:
2.00
Spread: 0.30 (17.647%)
Market Cap: £6.87m
LND Live PriceLast checked at - London Stock Exchange

Intraday Landore Resources Limited Share Chart

Drilling Update

20 Jul 2021 07:00

RNS Number : 7298F
Landore Resources Limited
20 July 2021
Β 

This announcement contains inside information as defined in Article 7 of the Market Abuse Regulation No 596/2014

Β 

LANDORE RESOURCES LIMITED

(AIM Ticker: LND.L)

Β 

Β 

Β DRILLING UPDATE

BAM GOLD PROJECT

JUNIOR LAKE PROPERTY

Β 

London, United Kingdom - 20 July 2021 - Landore Resources Limited (AIM: LND) ("Landore Resources" or "the Company") is pleased to provide an update on the progress of the drilling programme for 2020-21 (the "Drilling Programme") on theΒ BAM Gold Deposit, Junior Lake Property, Ontario, Canada ("BAM Gold Deposit").

Highlights

Β· Targeted drilling has successfully intersected high grade gold in the vicinity of the Bonanza grade quartz vein in drill hole 0421-875 (reported 20th April 2021) with drill hole 0421-793 reporting 0.61 metres at 29.40 grams/tonne (g/t). The results from this drilling will assist further targeting of the recently discovered high grade 'footwall' mineralisation.

Β 

Β· Drilling results confirmed wide, relatively shallow zones of ore grade gold mineralisation within the gabbro 'hanging wall' unit of the extended East pit, including drill hole 0421-793 reporting 15.09 metres at 1.75g/t gold and 0421-796 reporting 18.47 metres at 0.87g/t gold.

Β 

BAM Gold Deposit:

Five drill holes have been drilled at 25 metre centres to test the zone around the bonanza gold intercept on line 2850E. Assay results for these have been received. They include:

Β 

Easting

Northing

Drill-hole

From

Interval*

Au

No

Metres

Metres

g/t

2850E

100S

0421-793

72.60

39.99

0.58

including

83.77

1.01

5.57

and

144.76

15.09

1.75

including

156.59

0.61

29.40

2850E

150S

0421-794

191.80

13.80

0.76

including

197.38

3.65

1.83

and

209.33

0.49

3.73

2800E

125S

0421-795

112.70

7.98

0.91

and

190.86

11.62

0.55

2825E

110S

0421-796

84.06

18.47

0.87

including

89.28

10.16

1.14

2875E

140S

0421-797

88.00

16.08

0.70

and

179.36

10.08

1.28

including

183.72

0.87

8.20

*Β The drill holes were drilled north at 45 degrees into a lithological package dipping approximately 60 to 50 degrees to the south.Β The actual true thickness of mineralisation is estimated to represent 75% to 85% of the intervals shown in the above table

Β 

The above drilling has successfully intersected high grade gold in the vicinity of the 432g/t Bonanza grade vein (reported 20th April 2021). In addition, the drilling intersected wide, relatively shallow zones of ore grade mineralisation in the gabbro 'hanging wall' of the extended East pit, substantially enhancing the existing defined resource between 2600E and 2900E.

Β 

The information gained from the Drilling Programme will be used for further targeting of this recently discovered high grade 'footwall' vein.

Β 

2020-2021 Drilling Programme:

The Drilling Programme, consisting of a total of 23,000 metres of HQ diamond core drilling, commenced on October 15th, 2020 and was designed to further infill and extend the defined BAM Gold Deposit resource of 1,015,000 ounces.

Β 

To date, a total of 20,597 metres of HQ diamond core drilling, comprising 89 drill holes, (0420-725 to 0421-813), have been completed.

Β 

The programme consists of four sections:

1) Extension and Exploration from 3000E to 5000E.

Completed 6,042 metres of HQ diamond core for 30 holes. Assays are outstanding for 8 holes.

Β 

2) Extension and Exploration from 200W to 1000E

Completed 5,055 metres of HQ diamond core for 21 holes. Drilling continuing with 2 holes to complete

Β 

3) Deepening and Extending the West Pit from 1,000E to 2000E

Completed 3,464 metres of HQ diamond core fot16 holes. Drilling continuing with 1 hole to complete

Β 

4) Deepening and Extending the East Pit from 2000E to 3,000E

Completed 6,036 metres of HQ diamond core. Assays are outstanding for 8 holes.

Β 

Planning:

At the conclusion of the Drilling Programme the Company plans to commission an updated Mineral Resource Estimate ("MRE") and Preliminary Economic Assessment ("PEA") on the BAM Gold Deposit.

Β 

BAM GOLD DEPOSIT:

The BAM Gold Deposit is located approximately mid-way along a highly prospective Archean greenstone belt which traverses the Junior Lake Property from east to west for approximately 31 kilometres. The favorableΒ greenstone belt ranges from 0.5 to 1.5 kilometres wide and hosts multiple known gold occurrences including the Lamaune Gold Prospect.

Β 

The Junior Lake Property:

The Junior Lake Property, 100% owned by Landore Resources, together with the contiguous Lamaune Iron property (90.2% owned) (jointly the "Junior Lake Property"), consisting of 30,507 hectares, is located in the province of Ontario, Canada, approximately 235 kilometres north-northeast of Thunder Bay and is host to: The BAM Gold Deposit; the B4-7 Nickel-copper-cobalt-Platinum-Palladium-gold Deposit; the VW Nickel-Copper-cobalt Deposit; Lamaune Gold Prospect and numerous other precious and base metal occurrences.

Β 

Covid-19

The Company is following Government Covid-19 guidelines in its operations in Canada.

Β 

Michele Tuomi, (P.Geo., BSc. Geology), Director/VP Exploration of Landore Resources Canada Inc. and a Qualified Person as defined in the Canadian National Instrument 43-101 and the AIM Rules for Companies, has reviewed and verified all scientific or technical mining disclosure contained in this announcement.

Β 

- ENDS -

Β 

About Landore Resources

Landore Resources is an exploration company that seeks to grow shareholder value through the acquisition, exploration and development of precious and base metal projects in eastern Canada. The Company is primarily focused on the development of the Junior Lake Project. Landore Resources has mineral rights to 5 properties in eastern Canada. The Company is headquartered in Guernsey, with an

Exploration office located in Thunder Bay, Ontario, Canada.

Β 

For more information, please contact:

Landore Resources Limited

Bill Humphries, Chief Executive Officer

Tel: 07734 681262

Glenn Featherby, Finance Director

Tel: 07730 420318

Cenkos Securities (Nominated Advisor and Broker)

Derrick Lee / Peter Lynch

Tel: 0131 220 9100

Β 

Β 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
Β 
END
Β 
Β 
DRLEKLFFFDLEBBL
Date   Source Headline
4th Jul 20112:13 pmRNSExercise of Warrants
15th Jun 20112:35 pmRNSResult of AGM
14th Jun 20117:00 amRNSNotice of EGM
14th Jun 20117:00 amRNSHolding(s) in Company
6th Jun 201112:00 pmRNSSubscription
12th May 20117:00 amRNSFinal Results
10th May 20117:00 amRNSDRILLING UPDATE
25th Jan 20117:00 amRNSSubscription
30th Nov 20107:00 amRNSProgress Report - Junior Lake
15th Nov 20104:36 pmRNSHolding(s) in Company
5th Oct 20107:00 amRNSLAMAUNE GOLD DEPOSIT PROGRESS REPORT
24th Aug 201010:12 amRNSHalf Yearly Report
30th Jul 20108:44 amRNSHolding(s) in Company
22nd Jul 201011:58 amRNSExercise of Options - Replacement
22nd Jul 201011:17 amRNSExercise of Options
8th Jul 20108:53 amRNSTR1 Disclosure
30th Jun 20102:55 pmRNSResult of AGM
29th Jun 20107:00 amRNSSubscription
4th Jun 20107:00 amRNSFinal Results
4th May 20107:00 amRNSDrilling Report
7th Apr 20107:00 amRNSIssue of Equity
15th Mar 20108:45 amRNSProgress Report
9th Mar 20107:00 amRNSProgress Report
12th Feb 20107:00 amRNSAppointment of Joint Broker
3rd Dec 20097:00 amRNSJUNIOR LAKE GOLD DISCOVERY
29th Oct 20091:03 pmRNSGrant and exercise of options
29th Oct 20097:00 amRNSPlacing
15th Oct 20092:37 pmRNSChange of Name of Nominated Adviser and Broker
15th Sep 20097:00 amRNSROOT LAKE PROPERTY LITHIUM DEPOSIT
4th Sep 20099:36 amRNSHalf Yearly Report
18th Aug 20097:00 amRNSDrilling Report
3rd Aug 20097:00 amRNSDrilling Update
24th Jun 200911:21 amRNSResult of AGM
18th Jun 20092:16 pmRNSIssue of Equity
17th Jun 20097:00 amRNSDrilling Report
27th May 20097:00 amRNSDrilling Report
23rd Apr 200911:40 amRNSFinal Results
10th Feb 20093:44 pmRNSWEST GRAHAM-FIRST NICKEL OPTION RESOURCE STATEMENT
23rd Jan 200910:50 amRNSDirectorate Change
9th Jan 200911:44 amRNSChange of Adviser
9th Dec 20089:00 amRNSExercise of Options
18th Nov 20087:00 amRNSJUNIOR LAKE MINING LEASES
5th Nov 200812:21 pmRNSGrant of Options
4th Nov 200811:39 amRNSIssue of Equity
27th Oct 20087:00 amRNSJunior Lake Property Iron Ore Deposit
6th Oct 20087:00 amRNSLamaune Lake Property Acquisition
30th Sep 20087:00 amRNSProgress Report
17th Sep 20087:00 amRNSInterim Results
5th Sep 200812:01 pmRNSIssue of Equity
18th Jun 20083:36 pmRNSPosting of Annual Report & Ac

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.