Less Ads, More Data, More Tools Register for FREE

Pin to quick picksLandore Resources Limited Regulatory News (LND)

Share Price Information for Landore Resources Limited (LND)

Share Price is delayed by 15 minutes
Get Live Data
1.85    0.00 (0.00%)
Bid:
1.70
Ask:
2.00
Spread: 0.30 (17.647%)
Market Cap: £6.87m
LND Live PriceLast checked at - London Stock Exchange

Intraday Landore Resources Limited Share Chart

Drilling Update

20 Jul 2021 07:00

RNS Number : 7298F
Landore Resources Limited
20 July 2021
 

This announcement contains inside information as defined in Article 7 of the Market Abuse Regulation No 596/2014

 

LANDORE RESOURCES LIMITED

(AIM Ticker: LND.L)

 

 

 DRILLING UPDATE

BAM GOLD PROJECT

JUNIOR LAKE PROPERTY

 

London, United Kingdom - 20 July 2021 - Landore Resources Limited (AIM: LND) ("Landore Resources" or "the Company") is pleased to provide an update on the progress of the drilling programme for 2020-21 (the "Drilling Programme") on the BAM Gold Deposit, Junior Lake Property, Ontario, Canada ("BAM Gold Deposit").

Highlights

· Targeted drilling has successfully intersected high grade gold in the vicinity of the Bonanza grade quartz vein in drill hole 0421-875 (reported 20th April 2021) with drill hole 0421-793 reporting 0.61 metres at 29.40 grams/tonne (g/t). The results from this drilling will assist further targeting of the recently discovered high grade 'footwall' mineralisation.

 

· Drilling results confirmed wide, relatively shallow zones of ore grade gold mineralisation within the gabbro 'hanging wall' unit of the extended East pit, including drill hole 0421-793 reporting 15.09 metres at 1.75g/t gold and 0421-796 reporting 18.47 metres at 0.87g/t gold.

 

BAM Gold Deposit:

Five drill holes have been drilled at 25 metre centres to test the zone around the bonanza gold intercept on line 2850E. Assay results for these have been received. They include:

 

Easting

Northing

Drill-hole

From

Interval*

Au

No

Metres

Metres

g/t

2850E

100S

0421-793

72.60

39.99

0.58

including

83.77

1.01

5.57

and

144.76

15.09

1.75

including

156.59

0.61

29.40

2850E

150S

0421-794

191.80

13.80

0.76

including

197.38

3.65

1.83

and

209.33

0.49

3.73

2800E

125S

0421-795

112.70

7.98

0.91

and

190.86

11.62

0.55

2825E

110S

0421-796

84.06

18.47

0.87

including

89.28

10.16

1.14

2875E

140S

0421-797

88.00

16.08

0.70

and

179.36

10.08

1.28

including

183.72

0.87

8.20

* The drill holes were drilled north at 45 degrees into a lithological package dipping approximately 60 to 50 degrees to the south. The actual true thickness of mineralisation is estimated to represent 75% to 85% of the intervals shown in the above table

 

The above drilling has successfully intersected high grade gold in the vicinity of the 432g/t Bonanza grade vein (reported 20th April 2021). In addition, the drilling intersected wide, relatively shallow zones of ore grade mineralisation in the gabbro 'hanging wall' of the extended East pit, substantially enhancing the existing defined resource between 2600E and 2900E.

 

The information gained from the Drilling Programme will be used for further targeting of this recently discovered high grade 'footwall' vein.

 

2020-2021 Drilling Programme:

The Drilling Programme, consisting of a total of 23,000 metres of HQ diamond core drilling, commenced on October 15th, 2020 and was designed to further infill and extend the defined BAM Gold Deposit resource of 1,015,000 ounces.

 

To date, a total of 20,597 metres of HQ diamond core drilling, comprising 89 drill holes, (0420-725 to 0421-813), have been completed.

 

The programme consists of four sections:

1) Extension and Exploration from 3000E to 5000E.

Completed 6,042 metres of HQ diamond core for 30 holes. Assays are outstanding for 8 holes.

 

2) Extension and Exploration from 200W to 1000E

Completed 5,055 metres of HQ diamond core for 21 holes. Drilling continuing with 2 holes to complete

 

3) Deepening and Extending the West Pit from 1,000E to 2000E

Completed 3,464 metres of HQ diamond core fot16 holes. Drilling continuing with 1 hole to complete

 

4) Deepening and Extending the East Pit from 2000E to 3,000E

Completed 6,036 metres of HQ diamond core. Assays are outstanding for 8 holes.

 

Planning:

At the conclusion of the Drilling Programme the Company plans to commission an updated Mineral Resource Estimate ("MRE") and Preliminary Economic Assessment ("PEA") on the BAM Gold Deposit.

 

BAM GOLD DEPOSIT:

The BAM Gold Deposit is located approximately mid-way along a highly prospective Archean greenstone belt which traverses the Junior Lake Property from east to west for approximately 31 kilometres. The favorable greenstone belt ranges from 0.5 to 1.5 kilometres wide and hosts multiple known gold occurrences including the Lamaune Gold Prospect.

 

The Junior Lake Property:

The Junior Lake Property, 100% owned by Landore Resources, together with the contiguous Lamaune Iron property (90.2% owned) (jointly the "Junior Lake Property"), consisting of 30,507 hectares, is located in the province of Ontario, Canada, approximately 235 kilometres north-northeast of Thunder Bay and is host to: The BAM Gold Deposit; the B4-7 Nickel-copper-cobalt-Platinum-Palladium-gold Deposit; the VW Nickel-Copper-cobalt Deposit; Lamaune Gold Prospect and numerous other precious and base metal occurrences.

 

Covid-19

The Company is following Government Covid-19 guidelines in its operations in Canada.

 

Michele Tuomi, (P.Geo., BSc. Geology), Director/VP Exploration of Landore Resources Canada Inc. and a Qualified Person as defined in the Canadian National Instrument 43-101 and the AIM Rules for Companies, has reviewed and verified all scientific or technical mining disclosure contained in this announcement.

 

- ENDS -

 

About Landore Resources

Landore Resources is an exploration company that seeks to grow shareholder value through the acquisition, exploration and development of precious and base metal projects in eastern Canada. The Company is primarily focused on the development of the Junior Lake Project. Landore Resources has mineral rights to 5 properties in eastern Canada. The Company is headquartered in Guernsey, with an

Exploration office located in Thunder Bay, Ontario, Canada.

 

For more information, please contact:

Landore Resources Limited

Bill Humphries, Chief Executive Officer

Tel: 07734 681262

Glenn Featherby, Finance Director

Tel: 07730 420318

Cenkos Securities (Nominated Advisor and Broker)

Derrick Lee / Peter Lynch

Tel: 0131 220 9100

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLEKLFFFDLEBBL
Date   Source Headline
31st May 20177:00 amRNSFinal Results
17th May 20177:00 amRNSUpdate on BAM East Gold Project
7th Apr 20178:26 amRNSAward & Update on BAM East Gold Deposit
16th Mar 201710:00 amRNSIssue of Equity and Total Voting Rights
13th Mar 201710:20 amRNSHolding(s) in Company
13th Mar 201710:15 amRNSHolding(s) in Company
3rd Mar 201712:50 pmRNSFurther Subscription
3rd Mar 20177:30 amRNSLandore Resources raises C$3.3 million
17th Feb 20177:00 amRNSMAIDEN MINERAL RESOURCE ESTIMATE AND REPORT
23rd Jan 20177:00 amRNSUpdate on BAM East Gold Prospect
12th Jan 20177:00 amRNSUpdate on BAM East Gold Prospect
5th Dec 20167:00 amRNSUpdate on BAM East Gold Prospect
4th Nov 201612:00 pmRNSExercise of Options and Total Voting Rights
4th Nov 20167:00 amRNSNew Corporate Presentation
20th Oct 20167:00 amRNSUpdate on BAM East Gold Prospect
28th Sep 20167:00 amRNSInterim Results
21st Sep 20167:00 amRNSUpdate on BAM East Gold Prospect
5th Sep 20167:00 amRNSUpdate on BAM East Gold Prospect
3rd Aug 20167:00 amRNSUpdate on BAM East Gold Prospect
11th Jul 20167:00 amRNSOption agreement to sell Root Lake Property
23rd Jun 20167:00 amRNSAward of Share Options
21st Jun 201612:00 pmRNSIssue of Shares
21st Jun 201611:52 amRNSResult of AGM
10th Jun 20167:00 amRNSSubscription
17th May 20167:00 amRNSUpdate on BAM East Gold and Junior Lake Lithium
13th May 20167:00 amRNSFinal Results
4th Apr 20167:00 amRNSSignificant Gold Discovery - Junior Lake
14th Mar 20167:00 amRNSJunior Lake Update
18th Feb 20167:00 amRNSDrilling Results
10th Feb 20167:00 amRNSOption agreement to sell Root Lake Property
8th Dec 20157:00 amRNSJunior Lake Update
30th Nov 20157:00 amRNSAdditional Listing
11th Nov 20152:32 pmRNSHolding(s) in Company
30th Oct 20154:08 pmRNSSubscription
12th Oct 20157:00 amRNSJunior Lake - Mineral Potential Investigation
29th Sep 20157:00 amRNSInterim Results
21st Sep 20157:00 amRNSJunior Lake - Geophysics Review
4th Aug 201512:15 pmRNSHolding(s) in Company
7th Jul 20157:00 amRNSJunior Lake - Independent Review
30th Jun 20151:08 pmRNSResult of AGM / Change in Board positions
19th May 20157:00 amRNSFinal Results
13th Apr 20157:00 amRNSDrilling Results
23rd Mar 201511:03 amRNSChange of Broker
4th Mar 20153:40 pmRNSHolding(s) in Company
29th Jan 20157:00 amRNSJunior Lake Nickel-Copper Project Update
19th Dec 201412:02 pmRNSDirector's Dealing
19th Nov 20147:00 amRNSJunior Lake drilling results
23rd Sep 20147:00 amRNSInterim Results
15th Sep 20147:00 amRNSDrilling Results
19th Aug 20147:00 amRNSDrilling Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.