17 Jun 2009 07:00
ο»Ώ
LANDORE RESOURCES LIMITED
DRILLING UPDATE
JUNIOR LAKE-NICKEL PROJECT
B4-7 DEPOSIT
HIGHLIGHTS
Drilling on the historic B4-7 nickel-copper-cobalt-platinumΒ group elements (Ni-Cu-Co-PGE) deposit, locatedΒ on the Junior Lake Property,Β continues toΒ intersectΒ wide zones ofΒ mineralization,Β with assay resultsΒ Β returning grades up to of 3.11% nickelΒ together with substantial credits ofΒ copper, assayingΒ up toΒ 3.81%,Β palladium to 8.10Β grams per tonne (g/t), and cobalt to 0.44% (9.5 pounds per tonne).Β
The deposit,Β to dateΒ delineated overΒ 650 metresΒ of strike,Β remains openΒ along strike andΒ down plunge to the north-west.
Β Mineralized intersectionsΒ not previously reportedΒ include:
|
Drill-hole |
From |
Width |
Nickel |
Copper |
Cobalt |
Platinum |
Palladium |
|
No |
Metres |
Metres |
% |
% |
% |
g/t |
g/t |
|
0409-211 |
230.20 |
0.30 |
2.44 |
0.08 |
0.12 |
0.07 |
5.91 |
|
0409-212 |
60.22 |
7.12 |
0.82 |
0.70 |
0.10 |
0.23 |
0.75 |
|
including |
61.00 |
0.42 |
0.41 |
3.81 |
0.04 |
0.17 |
0.30 |
|
0419-215 |
57.20 |
0.47 |
0.53 |
0.21 |
0.06 |
0.20 |
8.10 |
|
and |
105.80 |
15.65 |
0.64 |
0.61 |
0.09 |
0.27 |
0.82 |
|
including |
114.80 |
4.00 |
1.04 |
0.56 |
0.08 |
0.22 |
0.63 |
|
0409-217 |
118.60 |
3.65 |
0.89 |
0.40 |
0.09 |
0.25 |
0.51 |
|
0409-219 |
13.14 |
2.61 |
3.11 |
0.19 |
0.13 |
0.04 |
3.46 |
|
and |
63.10 |
0.30 |
0.29 |
0.81 |
0.44 |
0.17 |
0.06 |
|
and |
64.54 |
15.31 |
0.78 |
0.56 |
0.08 |
0.15 |
0.80 |
|
0419-220 |
179.00 |
5.9 |
0.92 |
0.61 |
0.08 |
0.05 |
0.30 |
|
0419-221 |
209.95 |
0.33 |
1.28 |
0.04 |
0.08 |
0.09 |
2.55 |
|
and |
252.14 |
22.86 |
0.81 |
0.53 |
0.07 |
0.14 |
0.41 |
|
including |
253.04 |
3.96 |
1.04 |
0.23 |
0.06 |
0.04 |
0.37 |
Assay results are pendingΒ for the lastΒ 14 drill-holes.Β
TheΒ JuniorΒ LakeΒ property:
TheΒ JuniorΒ LakeΒ property is located in theΒ provinceΒ ofΒ Ontario,Β Canada, approximately 235 kilometres north-northeast ofΒ Thunder BayΒ and is situated within the Caribou-O'Sullivan Greenstone Belt in theΒ WabigoonΒ Subprovince. Β TheΒ JuniorΒ LakeΒ property is host to the VW Nickel (Ni) Deposit,Β the B4-7 Deposit, the recently reported IronΒ Deposit, the BAM zone gold occurrence and numerous other highly prospective mineral occurrences.
B4-7Β Deposit:
In May of 2008, LandoreΒ reportedΒ anΒ InferredΒ resource estimateΒ for the B4-7Β DepositΒ of 4,650,000 tonnes at 0.55% Nickel Equivalent (NiEq) (nickel plus copper-cobalt-PGE credits).Β
An infillΒ drill programme, consisting ofΒ 36 NQ size holesΒ for a total ofΒ 8,368Β metres, hasΒ recentlyΒ been completed on the B4-7Β Deposit. The programme wasΒ designedΒ toΒ provide sufficient information and drill densityΒ to advanceΒ the deposit to Indicated status. Additional metallurgical testing will be completed using core from the present programme. Β
Landore has appointedΒ Scott Wilson Roscoe Postle Associates Inc. (Scott Wilson RPA), consulting and engineering group from Toronto,Β Canada, to prepare aΒ CanadianΒ National Instrument 43-101 (NI43-101) compliant resource estimate upgrade on theΒ B4-7 deposit.
The drill campaignΒ has shown that the B4-7 deposit remains open to the west along strike and down plunge to the north-west. A previously completed airborne electromagnetic survey suggests theΒ conductiveΒ horizon hosting the B4-7 depositΒ persistsΒ for an additional 500 metersΒ to the west.
The deposit has excellent continuity with theΒ width along strike and down dip varying from 1 - 2 meters to over 15 meters. A separateΒ mineralizedΒ zone, named the Alpha zone,Β of highly anomalous PGE and Ni-Cu mineralization is observed in the hanging wall.Β
All drill-core was photographed prior to being cut for assaying. Samples were analyzed at Accurassay Laboratories (ISO/IEC 17025),Β Thunder Bay,Β Ontario, by geochemical analysis with atomic absorption finish (Ni). All samples reporting results of 1% nickel or higherΒ areΒ re-analysed by the assay method with atomic absorption finish. Check assays,Β blanks,Β standards and laboratory duplicatesΒ areΒ performed on a systematic basis at Accurassay Laboratories. ActlabsΒ Laboratory inΒ Thunder Bay,Β OntarioΒ is used forΒ systematic checks. Core is storedΒ onΒ site and in Landore'sΒ secureΒ facilities inΒ Thunder Bay,Β Ontario. Rejects are stored atΒ Landore'sΒ secureΒ facilities inΒ Thunder Bay.
Marc Sale, (BSC. Geology, Fellow AusIMM, member AIG) aΒ consultant to Landore Resources LimitedΒ Β and a qualified person as defined inΒ the CanadianΒ National Instrument 43-101, has reviewed and verified all scientific or technical mining disclosure contained in thisΒ announcement, which is stated in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum.
- ENDS -
For more information please contact:
|
Bill Humphries, Chairman Richard Prickett, Chief Executive Landore Resources Limited |
Tel:Β +44(0)7734 681262Β Tel:Β +44(0)7775 651421Β www.landore.com |
|
Simon Raggett/Angela Peace Strand Partners Limited |
Tel:Β +44(0)20 7409 3494 |
|
David Bick |
Tel:+44(0)7831 381201 |
Follow the stocks