15 Mar 2010 08:45

RNS Number : 5647I
Landore Resources Limited
15 March 2010
 



15 March 2010

Landore Resources Limited

("Landore" or the "Company")

 

PROGRESS REPORT

JUNIOR LAKE-LAMAUNE IRON DEPOSIT

 

HIGHLIGHTS

 

·; An Independent Technical study has been completed for Landore on its Lamaune Iron prospect identifying an exploration target of 545 million tonnes at an average grade of 29%Fe.

 

·; Test work results show that a 68% Fe concentrate, with acceptable levels of impurities, could be achieved.

 

·; Infrastructure for the project is excellent with Canadian National Rail just 13 kilometres from the iron project, the proposed Hydropower transmission line passing through the project, abundant water and the Thunder Bay Port facilities.

 

The Junior Lake property:

The Junior Lake property, 100% owned by Landore, is located in the province of Ontario, Canada, approximately 235 kilometres north-northeast of Thunder Bay and is host to; the Lamaune Iron deposit, the B4-7 nickel deposit, the VW Nickel deposit, the BAM zone gold occurrence, numerous other highly prospective mineral occurrences and the recently discovered Lamaune Gold Prospect.

.

Lamaune Iron Deposit:

In October 2008, Landore reported that exploration, including geophysical surveys, trenching and drilling, had identified the presence of a large magnetite iron deposit at the western end of the Junior Lake property.

 

Further exploration works during 2009, including a Helicopter-borne high resolution 'Impulse' geophysical survey over 12 kilometres of potential strike, together with additional drilling and trenching, indicated that the deposit could be of economical significance.

 

Accordingly, Landore initiated independent studies to provide an estimate of the potential size and quality of the Lamaune Iron deposit.

 

Potential size:

 An independent study has recently been completed for Landore in order to determine the size of the exploration target of its Lamaune Iron prospect. The study was completed using advanced geophysical modelling of the high resolution, high quality geophysical data set acquired in 2009, measurements of core sample magnetism, field work and assay results. This work has identified:

 

·; at a cut-off grade of 20%Fe, and to a depth of 300m, there is an exploration target of 545,000,000 tonnes at an average grade of 29%Fe

·; At a cut-off grade of 25%Fe, and to a depth of 300m, there is an exploration target of 297,000,000 tonnes at an average grade of 36%Fe.

 

The potential quantity and grade expressed above is conceptual in nature and in order to define a mineral resource further drilling is required.

 

Landore has drilled 39 diamond drill holes to date, for a total of 6,690m, over 3.5km of the central core area and is continuing to advance the Lamaune Iron project through drilling that is simultaneously exploring the Junior Lake gold prospect, metallurgical test work and ongoing geological and geophysical modelling.

 

The Lamaune Iron Deposit is just 13 kilometres from the Canadian National Railway providing direct access to the Port of Thunder Bay on Lake Superior. The port still has much of the infrastructure used by Steep Rock Iron Mines to ship Iron ore to the iron mills of North America.

 

In addition the iron deposit has abundant water resources nearby and is just 10 kilometres from the planned hydroelectric power station on the Little Jackfish River with the main transmission line passing through the property.

 

Landore now intends to conduct market research for potential customers in the Great Lakes area.

 

Test work:

A test work program has been carried out to determine the physical and chemical characteristics of the magnetite ore samples supplied from the central zone of the ore body.

 

Ten composite samples, selected from drill-holes spaced along the central 3.5 kilometre zone, were submitted for 'Davis Tube Recovery' (DTR) tests. The DTR test provides a critical basis of design parameter. The test determines the recovery and grade of the magnetic product that can be obtained through grinding and magnetic separation only.

 

The average grade of the submitted composite samples was 32.19% Fe. The average grade of the DTR tests results was 65.5% Fe with a weight to concentrate averaging 25.2%.

 

Preliminary sighter flotation tests have indicated success at reducing silica in the concentrate to acceptable levels and improving iron recoveries. The magnetic separation/flotation circuit is common in the iron mines of Minnesota and Northern Michigan.

 

The flotation tests show that a 68% Fe, 4.5% SiO2, 0.3% S grade concentrate, at a 72% product weight recovery and 83% Fe yield could be achieved.

(Note: An estimated feed tonnage of 11.6Mtpa would be required to produce 2.5Mtpa of iron pellets.)

 

Further flotation test work will be required to optimise this circuit but the initial sighter test work yielded positive results and it is expected that a combined sulphur and silica flotation circuit will produce the final product grade at acceptable yields.

 

Andrew Cheatle, (P. Geo., MBA, FGS, ARSM), General Manager of Landore Resources Canada Inc and a qualified person as defined in the Canadian National Instrument 43-101, has reviewed and verified all scientific or technical mining disclosure contained in this announcement, which is stated in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum.

 

- ENDS -

 

 

For more information please contact:

 

Bill Humphries, Chairman

Richard Prickett, Chief Executive

Landore Resources Limited

Tel: 07734 681262

Tel: 07775 651421

www.landore.com

Simon Raggett

Strand Hanson Limited

Nominated Adviser/Joint Broker

 

Ewan Leggat

Fairfax I.S. PLC

Joint Broker

Tel: 020 7409 3494

 

 

 

Tel: 0207598 5368

David Bick

 

Tel: 07831 381201

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLVELBFBXFZBBX
Date   Source Headline
4th Jun 20267:00 amRNS-RCorporate Presentation and Newsletter
3rd Jun 20267:00 amRNSFinal Results for the Year Ended 31 December 2025
7th May 20267:00 amRNSCorporate Update and 2026 Field Programme
5th May 20267:00 amRNSAppointment of Nominated Adviser and Joint Broker
1st May 20267:00 amRNSDirectorate change
31st Mar 20267:06 amRNS-RAwarded OJEP Grant
16th Feb 20267:00 amRNSCompletion of Storm Option Agreement
22nd Jan 20267:30 amRNSRestoration - Landore Resources Limited
22nd Jan 20267:00 amRNSUpdated Mineral Resource Estimates for Junior Lake
21st Jan 20267:00 amRNSUpdate re Suspension of Trading on AIM
2nd Jan 20267:00 amRNSUpdate on Suspension of Trading on AIM
2nd Jan 20267:00 amRNSUpdate on Suspension of Trading on AIM
11th Dec 20253:31 pmRNSTemporary Suspension of Trading on AIM
11th Dec 202512:59 pmRNSSuspension - Landore Resources Limited
3rd Dec 20257:00 amRNSStorm Enters Agreement to Sell Miminiska Project
10th Nov 20257:00 amRNSAmalgamation of Landore Canada and Lamaune
27th Oct 20257:00 amRNS£1,465,000 Equity Fundraise
17th Oct 20254:39 pmRNSExercise of Warrants and Issue of Equity
16th Oct 20257:00 amRNSAppointment of Alexander Shaw to Storm Board
29th Sep 20258:52 amRNSInterim Results
5th Aug 20254:11 pmRNSResult of Annual General Meeting
27th Jun 20256:10 pmRNSFinal Results and Notice of Annual General Meeting
18th Jun 20257:00 amRNSPositive Drill Campaign Results at BAM
6th May 20257:00 amRNSDrilling Campaign at BAM Gold Project Completed
25th Apr 20257:58 amRNSCompletion of BAM Mineral Rights Acquisition
4th Apr 20251:08 pmRNSDirector’s Dealing
26th Mar 20257:00 amRNSAcquisition of Additional BAM Mineral Rights
24th Mar 20257:00 amRNSReceipt of Option Payment from Storm
17th Mar 20257:00 amRNSDrilling Programme Commences on BAM
3rd Mar 20257:00 amRNSDrill Core Sampling Identifies Gold Upside
3rd Mar 20257:00 amRNSExercise of Warrants and Issue of Equity
12th Feb 20257:00 amRNSSampling Programme Identifies New Gold Anomalies
19th Dec 20247:00 amRNSAppointment of Joint Broker
13th Nov 20247:00 amRNSReceipt of Option Payment from Storm
30th Sep 20247:00 amRNSInterim Results to 30 June 2024
16th Sep 20247:00 amRNSBAM Gold Project Update
19th Aug 20247:00 amRNSUpdate on Option Agreement
17th Jul 20247:00 amRNSNotification of Major Holdings
16th Jul 202412:21 pmRNSCORRECTION: Notification of Major Holdings
16th Jul 20247:00 amRNSNotification of Major Holdings
12th Jul 20243:03 pmRNSNotification of Major Holdings
8th Jul 20241:23 pmRNSRESULT OF AGM, DIRECTORATE CHANGE & TVR
3rd Jul 20243:30 pmRNSOPTION AGREEMENT ON MIMINISKA LAKE & KEEZHIK LAKE
24th Jun 202412:30 pmRNSPosting of 2023 Annual Report and Notice of AGM
21st Jun 20242:30 pmRNSHolding(s) in Company
17th Jun 20247:00 amRNSFinal Results and Notice of AGM
12th Jun 20247:00 amRNSFundraise, Proposed CEO Appointment & Board Change
28th May 20247:00 amRNSStorm Option Agreement and Corporate Updates
15th Feb 20247:00 amRNS2023 Soil Sampling Identifies New Gold Trends
8th Feb 20246:09 pmRNSFurther Amendment to Storm Option Agreement

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.