Less Ads, More Data, More Tools Register for FREE

Pin to quick picksLandore Regulatory News (LND)

Share Price Information for Landore (LND)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2.70
Bid: 2.60
Ask: 2.80
Change: 0.00 (0.00%)
Spread: 0.20 (7.692%)
Open: 2.75
High: 2.75
Low: 2.70
Prev. Close: 2.70
LND Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling Results

15 Sep 2014 07:00

RNS Number : 5473R
Landore Resources Limited
15 September 2014
 



LANDORE RESOURCES LIMITED

(AIM Ticker: LND.L)

  

DRILLING CONFIRMS THE EXTENSION OF A SIGNIFICANT COPPER/GOLD MINERALISED STRUCTURE

B4-7 EAST AREA

JUNIOR LAKE NICKEL-COPPER PROPERTY

 

London, United Kingdom - 15th September 2014 - Landore Resources Limited (AIM:LND) ("Landore Resources" or "the Company") today announces a drilling update on the B4-7 East area of the Junior Lake Nickel-Copper Property, Ontario, Canada.

 

Highlights:

 

· The recently completed drill programme on the B4-7 East zone has successfully intersected a significant copper/gold mineralised structure extending eastwards from the B4-7 Nickel-Copper-Cobalt-PGEs deposit for 1,000 metres to line 1600E.

 

Significant intersections not previously reported:

Drill-hole

From

Width*

Ni

Cu

Co

Pd

Pt

Au

No

Metres

Metres

%

%

%

ppb

ppb

ppb

0414-482

174.5

1.00

0.14

1.15

0.02

136

38

187

And

200.74

0.69

0.29

0.93

0.02

131

21

2,150

And

226.20

0.80

0.09

1.14

0.01

20

7

76

0414-485

61.00

5.00

0.25

0.33

0.01

497

100

48

0414-489

6.28

3.02

0.32

0.95

0.02

533

123

134

Including

6.28

1.02

0.22

1.64

0.01

339

73

345

0414-491

137.00

1.00

0.09

1.25

0.01

93

12

54

\* The actual true thickness of mineralisation is estimated to represent between 60-70% of the intervals shown in the above table.

 

Results are pending for drill-hole 0414-492 and will be reported when received.

 

B4-7 East

A preliminary drill programme, consisting of 16 drill holes (0414-477 to 0414-492) for 4,201 metres, has been completed over the prospective area from the B4-7 Nickel-Copper-Cobalt-PGEs deposit (B4-7) eastwards for 1,500 metres to line 2100E.

 

Drilling has confirmed the extension of a significant copper/gold mineralized structure previously delineated from line 900W in the Scorpion zone eastwards adjacent to the B4-7. Values as high as 5.49% copper over 0.77 metres in drill-hole 0412-368 and 26.1g/t gold over 0.75 metres in drill-hole 0406-252 have been intersected by previous drilling. This copper/gold mineralisation is commonly hosted in foliated to sheared gabbro and leucogabbro.

 

The current drill programme, conducted during July and August 2014, confirmed the extension of this copper/gold trend through to line 1600E, with a further 500 metres potential strike length indicated by historical drill hole S-5 on line 2100E with 0.21 metres at 8.97% Cu, giving an overall potential strike extension of 3.0 kilometres.

 

The drilling also intersected elevated polymetallic mineralisation on line 1200E with drill-hole 0414-485 returning 5 metres at 0.25% Ni, 0.33% Cu, 0.01% Co, 497ppb Pd, 100ppb Pt, and 48ppb Au from 61 metres down-hole which together with previous highly encouraging trench results on line 1350E holds potential for near-surface, economic polymetallic mineralisation which would provide added value to the B4-7 deposit. Further drilling is necessary to ascertain the scope of this near-surface polymetallic mineralisation.

 

The results of this preliminary drill programme are currently being collated to determine what additional works are required to interpret the geological and mineralogical trends of the highly prospective B4-7 East Zone. Once completed, a drill programme will be designed to follow up on these promising areas.

 

Planned works:

The above area drilled is the first of three target areas containing 9 distinct geophysical anomalies as identified by the January 2014 3D DCIP + MT ground geophysical survey.

 

A second 4,000 metre drill programme has commenced , designed to test prospective targets identified in the VW West and BAM East areas by the December 2013 ground Electromagnetic (MaxMin), VLF and Magnetic geophysical surveys, as well as the January 2014 3D DCIP + MT ground geophysical survey.

 

The Junior Lake property:

The Junior Lake property, 100% owned by Landore Resources, is located in the province of Ontario, Canada, approximately 235 kilometres north-northeast of Thunder Bay, and is host to; the Scorpion Zone, which contains the B4-7 Nickel-Copper-Cobalt-PGEs resource, the recently-identified Exploration Target and the Alpha Zone. Junior Lake also contains the VW Nickel resource and numerous other highly prospective mineral occurrences.

 

B4-7 Nickel-Copper-Cobalt-PGEs Resource:

 

RESOURCE CLASS

VOLUME

(tonnes)

GRADE

(% NiEq)

Contained Metal (tonnes NiEq)

Indicated

2,695,000

1.24

33,248

 

Exploration Target

1,500,000 to 2,000,000

~1.24

~20,000

 

The report is compliant with the requirements of National Instrument 43-101 (NI 43-101). The resource remains open down plunge at depth and along strike to the west.

 

VW Nickel Resource:

 

RESOURCE CLASS

VOLUME

(tonnes)

GRADE

(% NiEq)

Contained Metal (tonnes NiEq)

Indicated

3,730,000

0.49

21,760

Inferred

720,000

0.49

 

The report is to NI 43-101 standards. The deposit remains open down plunge at depth and along strike to the east and to the west.

 

Works completed on the Junior Lake property to date have clearly demonstrated the existence of a geological environment that is favourable for the deposition of magmatic nickel-copper sulphide mineralisation. Based on geological signatures and available geological knowledge, this favourable environment is believed to exist along a strike length of approximately 10 kilometres. At its widest, the favourable rock sequences are in the order of 1,000 to 1,500 metres in thickness.

 

QAQC:

Landore has in place a stringent quality assurance and quality control programme to ensure best practices in sampling and assaying. All samples from the B4-7 project were collected by employees of Landore and shipped directly to ALS Laboratories, Thunder Bay, (ISO 9001 Certified) for preparation and assay in sealed bags. All samples are assayed for gold, platinum and palladium by fire assay, and nickel, copper, and cobalt by aqua regia digestion with AA finish, according to ALS's procedures PGM-ICP23, Ni Cu AA46, and Co AA45. Inductively-coupled plasma ("ICP") analyses for a suite of multi-elements (35 elements, including base metals and silver) were performed by procedure ME-ICP41.

 

Michele Tuomi, (P.Geo., BSc. Geology), Director/VP Exploration of Landore Resources Canada Inc. and a Qualified Person as defined in the Canadian National Instrument 43-101, has reviewed and verified all scientific or technical mining disclosure contained in this announcement.

 

- ENDS -

About Landore Resources

Landore Resources is an exploration company that seeks to grow shareholder value through the acquisition, exploration and development of precious and base metal projects in eastern Canada. The Company is primarily focused on the development of the Junior Lake Nickel Project. Landore Resources has mineral rights to 6 properties in eastern Canada. The Company is headquartered in London, UK, with an exploration office located in Thunder Bay, Ontario, Canada.

 

For more information please contact:

 

Bill Humphries, Chairman

Richard Prickett, Chief Executive Officer

Landore Resources Limited

Tel: 07734 681262

Tel: 07775 651421

www.landore.com

Angela Hallett / James Spinney

Strand Hanson Limited

Nominated Advisor

Tel: 020 7409 3494

 

Jon Belliss

Hume Capital Securities plc

Tel: 020 3693 1470

David Bick

Tel: 07831 381202

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLBGGDCGUBBGSD
Date   Source Headline
8th Apr 20213:09 pmRNSDisposal of 30% Interest in West Graham Property
29th Mar 20217:00 amRNSDrilling Update
3rd Mar 20217:00 amRNSJunior Lake Property BAM Gold & Battery Metals
22nd Feb 20215:24 pmRNSDirectors Subscription
17th Feb 20213:12 pmRNSExercise of Warrants and Issue of Equity
16th Feb 20215:57 pmRNS£3.5 Million Fundraising
15th Feb 20217:00 amRNSCorporate Presentation
12th Feb 20214:49 pmRNSStatement re Press Speculation
12th Feb 20218:24 amRNSExercise of Warrants and Issue of Equity
11th Feb 20217:00 amRNSDrilling Update
28th Jan 20214:28 pmRNSExercise of Warrants and Issue of Equity
21st Jan 20215:31 pmRNSExercise of Warrants and Issue of Equity
21st Jan 20213:16 pmRNSExercise of Warrants and Issue of Equity
21st Jan 20217:00 amRNSExercise of Warrants and Issue of Equity
14th Jan 20217:00 amRNSSoil Sampling Program Results
3rd Dec 20207:00 amRNSDrilling Update
9th Nov 202012:38 pmRNSChange of Admission Date
6th Nov 20207:29 amRNSExercise of Warrants and Issue of Equity
19th Oct 20207:00 amRNSDrilling Commences at BAM Gold Project
28th Sep 20207:00 amRNSInitiation of Research Coverage
21st Sep 20207:00 amRNSAcquisition of Royalty Rights at Lamaune Lake
21st Sep 20207:00 amRNSHalf-year Report
1st Sep 20207:00 amRNSDrilling Programme 2020/21 and Pit Optimisation
20th Aug 202012:46 pmRNSResults of General Meetings
6th Aug 202012:54 pmRNSHolding(s) in Company
24th Jul 20201:57 pmRNSAward of Options
24th Jul 20207:01 amRNSProposed Share Capital Consolidaton
24th Jul 20207:00 amRNSFinal Results & Notice of AGM
21st Jul 202011:26 amRNSHolding(s) in Company
20th Jul 202011:13 amRNSHolding(s) in Company
13th Jul 202011:42 amRNSResult of Extraordinary General Meeting
1st Jul 202011:05 amRNSSecond Price Monitoring Extn
1st Jul 202011:00 amRNSPrice Monitoring Extension
29th Jun 20207:00 amRNS£2.8 million Conditional Placing and Accounts Date
22nd Jun 20209:05 amRNSSecond Price Monitoring Extn
22nd Jun 20209:00 amRNSPrice Monitoring Extension
24th Apr 20207:00 amRNSSubscription to raise £260,000
15th Apr 20207:00 amRNSCorporate Presentation
9th Apr 20207:00 amRNSResource Estimate and Technical Report Publication
6th Apr 20204:11 pmRNSDirector/PDMR Shareholding
7th Feb 20204:26 pmRNSDirectorate Change
17th Jan 20207:00 amRNSAppointment of Non-Executive Director
16th Jan 202010:18 amRNSNew Corporate Presentation
14th Jan 202011:52 amRNSSubscription to raise £225,000
7th Jan 20207:00 amRNSBAM Gold Deposit Mineral Resource Estimate Update
9th Dec 20197:00 amRNSSoil Sampling Program Results
13th Nov 20197:00 amRNSGrant of Mining Leases to Lamaune Inc
21st Oct 20197:00 amRNSProgress Update - BAM Gold Project
18th Sep 20199:13 amRNSSubscription to raise £470,000
4th Sep 20197:00 amRNSDrilling Update - BAM Gold Project

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.