Less Ads, More Data, More Tools Register for FREE

Pin to quick picksKodal Minerals Regulatory News (KOD)

Share Price Information for Kodal Minerals (KOD)

Share Price is delayed by 15 minutes
Get Live Data
0.305    -0.01 (-3.23%)
Bid:
0.29
Ask:
0.32
Spread: 0.03 (10.345%)
Market Cap: £61.12m
KOD Live PriceLast checked at - London Stock Exchange

Intraday Kodal Minerals Share Chart

Grimeli Drilling Update

19 Jan 2015 07:00

RNS Number : 4734C
Kodal Minerals PLC
19 January 2015
 

Kodal Minerals plc

("Kodal Minerals" or the "Company")

 

Grimeli Drilling Update

2,000 metres of diamond drilling to start in February

 

 

Kodal Minerals, the mineral development and exploration company owning extraction and exploration licences in Norway, is pleased to announce the signing of a contract to undertake a 2,000 metre diamond drill programme at the Grimeli Project. The Grimeli Project is a Copper ("Cu") project located in western Norway approximately 150km north of Bergen. The Company has previously announced in November 2014 the results of assays from a series of underground channel samples taken from the Grimeli Upper Mine that showed high grade copper mineralisation.

 

Highlights

 

· A contractor has been engaged to complete 2,000 metres of diamond drilling at the Grimeli Project.

· It is expected that drilling will start in early February 2015 with 18 holes planned.

· The programme will target 3 mineralised horizons, two of which were areas of historic mining activity

· Drill holes will target strike extensions and down dip extensions of the previously mined horizons.

· The un-mined horizon is a magnetic anomaly identified by ground geophysics in 2014.

· A land access agreement has been signed with the landowner.

· Authorisation has been obtained from the local municipality to access the high drill locations located in off-road areas.

· The contractor will also reinstate 900 metres of historic access track over an elevation gain of approximately 190 metres.

 

Luke Bryan, CEO of Kodal Minerals, commented: "The planned drilling will test three horizons, two of which have been mined previously and one which has been identified by the Company through ground geophysical surveys. In the previously mined areas, the drilling will target inferred strike and depth extensions of the mineralisation. In the third target area the first aim is to locate the structure responsible for the geophysical anomaly identified.

 

"This drilling will provide the Company with its first access to the full width of the mineralised structures; previously we have been limited to mine pillars and areas where we could safely access old underground workings. "

 

Contact details:

 

Kodal Minerals plcLuke Bryan, Chief Executive Officer Tel: 020 3470 0470

 

Allenby Capital Limited, Nominated Adviser Tel: 020 3328 5656

Jeremy Porter/Nick Harriss

 

SP Angel Corporate Finance LLP, Financial Adviser & Broker Tel: 020 3470 0470

John Mackay/Laura Harrison

 

Yellow Jersey PR Ltd, Financial PR Tel: 07768 537 739

Dominic Barretto/Kelsey Traynor

 

 

Further information

 

The Grimeli Project

 

The Company holds exploration permits over an area of 30 sq km, referred to as the Grimeli Project, which includes two previously producing copper mines, the Grimeli mine and the Vågendal mine. The two mines are located on opposite sides of a long hill forming a peninsular on the western coast of Norway and are approximately 7km apart. The copper mines were operational at various times between 1759 and 1920.

 

The Company has previously reported the results of channel samples taken from the lower mine at Grimeli as well as a geophysical anomaly extending for 3,200 metres.

 

 

Sampling results

 

The mineralised results from the Grimeli Upper Mine channel sampling is as follows:

 

Copper Grade (%)

Sample Width (m)

7.24

1.75

4.89

1.02

4.19

0.5

3.73

0.93

2.45

0.7

1.83

1.4

1.65

0.88

1.43

1.19

1.07

0.74

 

 

Multi element acid digest assays were completed by SGS Mineral Services on the ten reported channel samples. The assays returned relatively low arsenic of less than 3 ppm in all cases. These samples were taken from a mixture of pillars in a sub level connection to the 170 level and in in-situ ore in the vertical connection between the 150 level and the sub-level. The Company now has access to a significant exposure of in-situ ore from which a sample will be extracted for mineral processing test work in due course.

 

The samples taken in the Grimeli upper mine further support the view that the historic workings were targeting high grade copper mineralisation. The combined old workings at Grimeli have now been sampled over an approximate vertical extent of 225 metres and an approximate horizontal extent of 350 metres. Samples from the extents of the workings have returned copper assays approaching five percent copper with one result returning 7.24% Cu.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLUWAURVVAAAUR
Date   Source Headline
3rd Jan 202311:05 amRNSSecond Price Monitoring Extn
3rd Jan 202311:00 amRNSPrice Monitoring Extension
23rd Dec 20227:00 amRNSInterim Results
19th Dec 20222:34 pmEQSKodal Minerals 'not looking to raise funds'
16th Dec 20227:00 amRNSBougouni Project Update & Appointment of Broker
8th Dec 20222:01 pmEQSKodal Minerals will be 'moving full steam ahead' once funding secured
2nd Nov 20224:40 pmRNSSecond Price Monitoring Extn
2nd Nov 20224:35 pmRNSPrice Monitoring Extension
29th Sep 202211:43 amRNSResult of AGM
29th Sep 20227:00 amRNSBougouni Project DMS Development Opportunity
28th Sep 20229:30 amRNSPost-AGM Presentation and Q&A
2nd Sep 20224:02 pmRNSPosting of Annual Report & Notice of AGM
18th Aug 20227:00 amRNSGrant of Share Options
28th Jul 20227:00 amRNSInvestor Presentation and Q&A
27th Jul 20227:00 amRNSSteven Zaninovich Appointed as Operations Director
19th Jul 20227:00 amRNSFinal Results
30th Jun 20224:28 pmRNSUpdate re major shareholder
16th Jun 20223:05 pmRNSAIM Rule 17 Notification
15th Jun 20227:00 amRNSBougouni Lithium Project Update
31st May 20225:00 pmRNSTotal Voting Rights
4th May 20229:05 amRNSSecond Price Monitoring Extn
4th May 20229:00 amRNSPrice Monitoring Extension
4th May 20227:00 amRNSSubscription & Oversubscribed Placing Raises £3.0m
9th Mar 20222:06 pmRNSSecond Price Monitoring Extn
9th Mar 20222:00 pmRNSPrice Monitoring Extension
14th Feb 20228:12 amRNSCompany Update
26th Jan 20224:41 pmRNSSecond Price Monitoring Extn
26th Jan 20224:36 pmRNSPrice Monitoring Extension
26th Jan 20222:06 pmRNSSecond Price Monitoring Extn
26th Jan 20222:00 pmRNSPrice Monitoring Extension
30th Dec 20212:05 pmRNSSecond Price Monitoring Extn
30th Dec 20212:01 pmRNSPrice Monitoring Extension
16th Dec 202110:30 amRNSCompany Presentation and Q & A session
16th Dec 20217:00 amRNSInterim Results
15th Dec 20212:06 pmRNSSecond Price Monitoring Extn
15th Dec 20212:00 pmRNSPrice Monitoring Extension
14th Dec 20219:05 amRNSSecond Price Monitoring Extn
14th Dec 20219:01 amRNSPrice Monitoring Extension
14th Dec 20217:03 amRNSGold Exploration Update & Bougouni Lithium Project
1st Dec 20214:41 pmRNSSecond Price Monitoring Extn
1st Dec 20214:36 pmRNSPrice Monitoring Extension
1st Dec 20212:06 pmRNSSecond Price Monitoring Extn
1st Dec 20212:00 pmRNSPrice Monitoring Extension
1st Dec 202111:06 amRNSSecond Price Monitoring Extn
1st Dec 202111:01 amRNSPrice Monitoring Extension
30th Nov 20215:00 pmRNSTotal Voting Rights
8th Nov 202111:05 amRNSSecond Price Monitoring Extn
8th Nov 202111:00 amRNSPrice Monitoring Extension
8th Nov 20219:06 amRNSSecond Price Monitoring Extn
8th Nov 20219:00 amRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.