Less Ads, More Data, More Tools Register for FREE

Pin to quick picksKodal Minerals Regulatory News (KOD)

Share Price Information for Kodal Minerals (KOD)

Share Price is delayed by 15 minutes
Get Live Data
0.305    -0.01 (-3.23%)
Bid:
0.29
Ask:
0.32
Spread: 0.03 (10.345%)
Market Cap: £61.12m
KOD Live PriceLast checked at - London Stock Exchange

Intraday Kodal Minerals Share Chart

Grimeli Drilling Update

19 Jan 2015 07:00

RNS Number : 4734C
Kodal Minerals PLC
19 January 2015
 

Kodal Minerals plc

("Kodal Minerals" or the "Company")

 

Grimeli Drilling Update

2,000 metres of diamond drilling to start in February

 

 

Kodal Minerals, the mineral development and exploration company owning extraction and exploration licences in Norway, is pleased to announce the signing of a contract to undertake a 2,000 metre diamond drill programme at the Grimeli Project. The Grimeli Project is a Copper ("Cu") project located in western Norway approximately 150km north of Bergen. The Company has previously announced in November 2014 the results of assays from a series of underground channel samples taken from the Grimeli Upper Mine that showed high grade copper mineralisation.

 

Highlights

 

· A contractor has been engaged to complete 2,000 metres of diamond drilling at the Grimeli Project.

· It is expected that drilling will start in early February 2015 with 18 holes planned.

· The programme will target 3 mineralised horizons, two of which were areas of historic mining activity

· Drill holes will target strike extensions and down dip extensions of the previously mined horizons.

· The un-mined horizon is a magnetic anomaly identified by ground geophysics in 2014.

· A land access agreement has been signed with the landowner.

· Authorisation has been obtained from the local municipality to access the high drill locations located in off-road areas.

· The contractor will also reinstate 900 metres of historic access track over an elevation gain of approximately 190 metres.

 

Luke Bryan, CEO of Kodal Minerals, commented: "The planned drilling will test three horizons, two of which have been mined previously and one which has been identified by the Company through ground geophysical surveys. In the previously mined areas, the drilling will target inferred strike and depth extensions of the mineralisation. In the third target area the first aim is to locate the structure responsible for the geophysical anomaly identified.

 

"This drilling will provide the Company with its first access to the full width of the mineralised structures; previously we have been limited to mine pillars and areas where we could safely access old underground workings. "

 

Contact details:

 

Kodal Minerals plcLuke Bryan, Chief Executive Officer Tel: 020 3470 0470

 

Allenby Capital Limited, Nominated Adviser Tel: 020 3328 5656

Jeremy Porter/Nick Harriss

 

SP Angel Corporate Finance LLP, Financial Adviser & Broker Tel: 020 3470 0470

John Mackay/Laura Harrison

 

Yellow Jersey PR Ltd, Financial PR Tel: 07768 537 739

Dominic Barretto/Kelsey Traynor

 

 

Further information

 

The Grimeli Project

 

The Company holds exploration permits over an area of 30 sq km, referred to as the Grimeli Project, which includes two previously producing copper mines, the Grimeli mine and the Vågendal mine. The two mines are located on opposite sides of a long hill forming a peninsular on the western coast of Norway and are approximately 7km apart. The copper mines were operational at various times between 1759 and 1920.

 

The Company has previously reported the results of channel samples taken from the lower mine at Grimeli as well as a geophysical anomaly extending for 3,200 metres.

 

 

Sampling results

 

The mineralised results from the Grimeli Upper Mine channel sampling is as follows:

 

Copper Grade (%)

Sample Width (m)

7.24

1.75

4.89

1.02

4.19

0.5

3.73

0.93

2.45

0.7

1.83

1.4

1.65

0.88

1.43

1.19

1.07

0.74

 

 

Multi element acid digest assays were completed by SGS Mineral Services on the ten reported channel samples. The assays returned relatively low arsenic of less than 3 ppm in all cases. These samples were taken from a mixture of pillars in a sub level connection to the 170 level and in in-situ ore in the vertical connection between the 150 level and the sub-level. The Company now has access to a significant exposure of in-situ ore from which a sample will be extracted for mineral processing test work in due course.

 

The samples taken in the Grimeli upper mine further support the view that the historic workings were targeting high grade copper mineralisation. The combined old workings at Grimeli have now been sampled over an approximate vertical extent of 225 metres and an approximate horizontal extent of 350 metres. Samples from the extents of the workings have returned copper assays approaching five percent copper with one result returning 7.24% Cu.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLUWAURVVAAAUR
Date   Source Headline
22nd May 20173:49 pmRNSIssue of warrants
19th May 20177:00 amRNSHigh-grade lithium results from Ngoualana prospect
8th May 201710:01 amRNSGrant of Options
8th May 20177:00 amRNSCompletion of Equity Subscription Agreement
3rd May 20177:00 amRNSFurther High-Grade Lithium Mineralisation,Bougouni
28th Apr 20171:57 pmRNSUpdate re proposed placing and off-take agreement
26th Apr 20177:00 amRNSHigh-Grade Lithium Mineralisation at Bougouni
11th Apr 20177:00 amRNSUpdate on Bougouni Lithium Project & Due Diligence
31st Mar 20175:00 pmRNSTotal Voting Rights
31st Mar 20177:00 amRNSHolding(s) in Company
15th Mar 20179:55 amRNSHolding(s) in Company
14th Mar 20177:00 amRNSTrenching Results,Bougouni Lithium Project, Mali
10th Mar 20174:40 pmRNSSecond Price Monitoring Extn
10th Mar 20174:35 pmRNSPrice Monitoring Extension
10th Mar 20179:00 amRNSPrice Monitoring Extension
10th Mar 20177:00 amRNSPlacement and Off-Take Agreement
3rd Mar 20177:00 amRNSLithium Project Update and Drilling to Commence
23rd Feb 20171:47 pmRNSHolding(s) in Company
21st Feb 20172:16 pmRNSHoldings in Company
9th Feb 20172:05 pmRNSSecond Price Monitoring Extn
9th Feb 20172:00 pmRNSPrice Monitoring Extension
8th Feb 20177:00 amRNSFinal Drilling Assays at Bougouni Lithium Project
3rd Feb 201712:49 pmRNSHolding in Company
2nd Feb 20177:00 amRNSFirst Drilling Assays at Bougouni Lithium Project
31st Jan 20177:00 amRNSUpdate on Bougouni Lithium Project
31st Jan 20177:00 amRNSTotal Voting Rights and Holding in Company
25th Jan 20174:40 pmRNSSecond Price Monitoring Extn
25th Jan 20174:35 pmRNSPrice Monitoring Extension
25th Jan 20172:05 pmRNSSecond Price Monitoring Extn
25th Jan 20172:00 pmRNSPrice Monitoring Extension
18th Jan 20174:40 pmRNSSecond Price Monitoring Extn
18th Jan 20174:35 pmRNSPrice Monitoring Extension
13th Jan 20174:25 pmRNSStatement re share price movement
9th Jan 20177:00 amRNSPlacing to Advance Bougouni Lithium Project
30th Dec 20167:00 amRNSDrilling update at Bougouni Lithium Project
7th Dec 20167:00 amRNSHigh-Grade Rock Chip Samples Returned, Mali
30th Nov 20167:00 amRNSDrilling commences at Bougouni Lithium Project
28th Nov 20167:00 amRNSAcquisition of Lithium Concessions, Southern Mali
8th Nov 20164:16 pmRNSHolding(s) in Company
7th Nov 20167:00 amRNSGold Project JV Exploration Update, Cote d'Ivoire
3rd Nov 20164:35 pmRNSPrice Monitoring Extension
3rd Nov 20162:06 pmRNSSecond Price Monitoring Extn
3rd Nov 20162:00 pmRNSPrice Monitoring Extension
3rd Nov 201611:05 amRNSSecond Price Monitoring Extn
3rd Nov 201611:00 amRNSPrice Monitoring Extension
3rd Nov 20167:00 amRNSInterim Results
31st Oct 20165:00 pmRNSTotal Voting Rights
19th Oct 20167:00 amRNSUpdate on Kodal Project
5th Oct 20167:00 amRNSDefines Four New Gold Anomalous Zones at Korhogo
3rd Oct 20167:00 amRNSPlacing to Advance High-Grade Lithium Project

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.