Sapan Gai, CCO at Sovereign Metals, discusses their superior graphite test results. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksKodal Minerals Regulatory News (KOD)

Share Price Information for Kodal Minerals (KOD)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.43
Bid: 0.42
Ask: 0.44
Change: 0.00 (0.00%)
Spread: 0.02 (4.762%)
Open: 0.43
High: 0.43
Low: 0.43
Prev. Close: 0.43
KOD Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Grimeli Drilling Update

19 Jan 2015 07:00

RNS Number : 4734C
Kodal Minerals PLC
19 January 2015
 

Kodal Minerals plc

("Kodal Minerals" or the "Company")

 

Grimeli Drilling Update

2,000 metres of diamond drilling to start in February

 

 

Kodal Minerals, the mineral development and exploration company owning extraction and exploration licences in Norway, is pleased to announce the signing of a contract to undertake a 2,000 metre diamond drill programme at the Grimeli Project. The Grimeli Project is a Copper ("Cu") project located in western Norway approximately 150km north of Bergen. The Company has previously announced in November 2014 the results of assays from a series of underground channel samples taken from the Grimeli Upper Mine that showed high grade copper mineralisation.

 

Highlights

 

· A contractor has been engaged to complete 2,000 metres of diamond drilling at the Grimeli Project.

· It is expected that drilling will start in early February 2015 with 18 holes planned.

· The programme will target 3 mineralised horizons, two of which were areas of historic mining activity

· Drill holes will target strike extensions and down dip extensions of the previously mined horizons.

· The un-mined horizon is a magnetic anomaly identified by ground geophysics in 2014.

· A land access agreement has been signed with the landowner.

· Authorisation has been obtained from the local municipality to access the high drill locations located in off-road areas.

· The contractor will also reinstate 900 metres of historic access track over an elevation gain of approximately 190 metres.

 

Luke Bryan, CEO of Kodal Minerals, commented: "The planned drilling will test three horizons, two of which have been mined previously and one which has been identified by the Company through ground geophysical surveys. In the previously mined areas, the drilling will target inferred strike and depth extensions of the mineralisation. In the third target area the first aim is to locate the structure responsible for the geophysical anomaly identified.

 

"This drilling will provide the Company with its first access to the full width of the mineralised structures; previously we have been limited to mine pillars and areas where we could safely access old underground workings. "

 

Contact details:

 

Kodal Minerals plcLuke Bryan, Chief Executive Officer Tel: 020 3470 0470

 

Allenby Capital Limited, Nominated Adviser Tel: 020 3328 5656

Jeremy Porter/Nick Harriss

 

SP Angel Corporate Finance LLP, Financial Adviser & Broker Tel: 020 3470 0470

John Mackay/Laura Harrison

 

Yellow Jersey PR Ltd, Financial PR Tel: 07768 537 739

Dominic Barretto/Kelsey Traynor

 

 

Further information

 

The Grimeli Project

 

The Company holds exploration permits over an area of 30 sq km, referred to as the Grimeli Project, which includes two previously producing copper mines, the Grimeli mine and the Vågendal mine. The two mines are located on opposite sides of a long hill forming a peninsular on the western coast of Norway and are approximately 7km apart. The copper mines were operational at various times between 1759 and 1920.

 

The Company has previously reported the results of channel samples taken from the lower mine at Grimeli as well as a geophysical anomaly extending for 3,200 metres.

 

 

Sampling results

 

The mineralised results from the Grimeli Upper Mine channel sampling is as follows:

 

Copper Grade (%)

Sample Width (m)

7.24

1.75

4.89

1.02

4.19

0.5

3.73

0.93

2.45

0.7

1.83

1.4

1.65

0.88

1.43

1.19

1.07

0.74

 

 

Multi element acid digest assays were completed by SGS Mineral Services on the ten reported channel samples. The assays returned relatively low arsenic of less than 3 ppm in all cases. These samples were taken from a mixture of pillars in a sub level connection to the 170 level and in in-situ ore in the vertical connection between the 150 level and the sub-level. The Company now has access to a significant exposure of in-situ ore from which a sample will be extracted for mineral processing test work in due course.

 

The samples taken in the Grimeli upper mine further support the view that the historic workings were targeting high grade copper mineralisation. The combined old workings at Grimeli have now been sampled over an approximate vertical extent of 225 metres and an approximate horizontal extent of 350 metres. Samples from the extents of the workings have returned copper assays approaching five percent copper with one result returning 7.24% Cu.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLUWAURVVAAAUR
Date   Source Headline
30th Apr 20249:28 amRNSBougouni Lithium Project
28th Mar 20249:20 amRNSBougouni Lithium Project
26th Mar 20247:00 amRNSBougouni Lithium Project Development Update
19th Mar 202410:25 amRNSAppointment of Non-Executive Director
22nd Dec 20237:00 amRNSKodal Minerals Interim Results to 30 Sept 2023
30th Nov 20235:00 pmRNSTotal Voting Rights
21st Nov 20235:53 pmRNSDirector dealings and shareholdings
16th Nov 20233:36 pmRNSExercise of Options, Warrants & Performance Rights
16th Nov 20237:00 amRNSNotification of Major Holdings
15th Nov 20238:00 amRNSKodal Minerals completion of Funding Transaction
14th Nov 20233:56 pmRNSIssue of Equity and Change to Total Voting Rights
14th Nov 20237:09 amRNSBougouni Lithium Project Mineral Resource Update
27th Oct 20239:57 amRNSKodal and Hainan Funding Package Completion
28th Sep 20234:00 pmRNSPost-AGM Webcast and Q&A Session
28th Sep 20232:48 pmRNSBougouni Funding Package: Long Stop Date Extension
22nd Sep 20237:00 amRNSUpdate on Project Development Preparations
18th Sep 20237:00 amRNSKodal Board Update
6th Sep 20237:00 amRNSFinal Results & Notice of AGM
31st Aug 20237:00 amRNSBougouni Funding – Extension of Long Stop Date
3rd Aug 20237:51 amRNSKodal receives Prepayment of US$3,500,000
30th Jun 20237:00 amRNSExtension of Long Stop Date for Bougouni Funding
31st May 20237:00 amRNSBougouni Assay Results & Funding Package Update
15th May 20235:31 pmRNSReplacement: Exercise of Options and TVR
12th May 20233:39 pmRNSExercise of Options and Total Voting Rights
2nd May 20235:04 pmRNSDirector/PDMR Shareholding
27th Apr 20238:02 amRNSExtension of Long Stop Date to 31 May 2023
19th Apr 20238:42 amRNSBougouni Drilling Results & Sale of Bougouni West
13th Apr 20238:00 amRNSBougouni Lithium Project Update on Funding Package
3rd Apr 20237:00 amRNSBougouni Lithium Project Update
3rd Apr 20237:00 amRNSReplacement: Total Voting Rights
31st Mar 20236:00 pmRNSTotal Voting Rights
23rd Mar 20237:00 amRNSDirector dealings and shareholdings
20th Mar 20237:00 amRNSExercise of options and change to TVR
1st Feb 202311:00 amRNSPrice Monitoring Extension
1st Feb 202310:45 amRNSFunding update – US$7million Deposit Received
19th Jan 20232:05 pmRNSSecond Price Monitoring Extn
19th Jan 20232:00 pmRNSPrice Monitoring Extension
19th Jan 20239:05 amRNSSecond Price Monitoring Extn
19th Jan 20239:00 amRNSPrice Monitoring Extension
19th Jan 20238:10 amRNSMajor Funding Package for Bougouni Lithium Project
3rd Jan 20234:40 pmRNSSecond Price Monitoring Extn
3rd Jan 20234:35 pmRNSPrice Monitoring Extension
3rd Jan 20232:05 pmRNSSecond Price Monitoring Extn
3rd Jan 20232:00 pmRNSPrice Monitoring Extension
3rd Jan 202311:05 amRNSSecond Price Monitoring Extn
3rd Jan 202311:00 amRNSPrice Monitoring Extension
23rd Dec 20227:00 amRNSInterim Results
19th Dec 20222:34 pmEQSKodal Minerals 'not looking to raise funds'
16th Dec 20227:00 amRNSBougouni Project Update & Appointment of Broker
8th Dec 20222:01 pmEQSKodal Minerals will be 'moving full steam ahead' once funding secured

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.