Ryan Mee, CEO of Fulcrum Metals, reviews FY23 and progress on the Gold Tailings Hub in Canada. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksKibo Energy Regulatory News (KIBO)

Share Price Information for Kibo Energy (KIBO)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.0375
Bid: 0.035
Ask: 0.04
Change: 0.00 (0.00%)
Spread: 0.005 (14.286%)
Open: 0.0375
High: 0.0375
Low: 0.0375
Prev. Close: 0.0375
KIBO Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Warrant Update

1 Mar 2018 09:15

RNS Number : 3711G
Kibo Mining Plc
01 March 2018
 

 

Kibo Mining Plc (Incorporated in Ireland) (Registration Number: 451931)

(External registration number: 2011/007371/10) Share code on the JSE Limited: KBO

Share code on the AIM: KIBO ISIN: IE00B97C0C31

('Kibo' or 'the Company')

 

 

 

Dated: 1 March 2018

 

Kibo Mining Plc ('Kibo' or the 'Company')

Correction to Kibo RNS dated 24 February 2017

 

The Company wishes to inform shareholders that the 10,000,000 warrants at an exercise price of 9p shown as outstanding to Metal Tiger plc in Kibo's RNS of 24 February 2017 expire on 23 March 2018 and not on 25 February 2018 as stated in the RNS. The Company apologises for this typographical error.

 

 

**ENDS**

 

For further information please visit www.kibomining.com or contact:

 

Louis Coetzee

louisc@kibomining.com

Kibo Mining Plc

Chief Executive Officer

Andreas Lianos

+27 (0) 83 4408365

River Group

Corporate Adviser and Designated Adviser on JSE

Jon Belliss

+44 (0) 20 7382 8300

 

Beaufort Securities Limited

Broker

Andrew Thomson

+61 8 9480 2500

RFC Ambrian Limited

NOMAD on AIM

Isabel de Salis / Priit Piip

+44 (0) 20 7236 1177

St Brides Partners Ltd

Investor and Media Relations Adviser

 

 

Notes to editors

Kibo is a multi-asset resource development and energy company with a long-term goal of becoming a leading power producer in Sub-Saharan Africa. The Company aims to tackle the acute power deficit which is severely hindering economic development in the region.

 

Kibo's flagship asset is the Mbeya Coal to Power Project ('MCPP') in Tanzania which comprises of the development of the Mbeya Coal Mine, a 1.5Mt p/a mining operation and the Mbeya Power Plant, a 300 MW mine-mouth thermal power station.

 

The Mbeya Coal Mine has a defined 120.8 Mt NI 43 101 thermal coal resource. A Definitive Feasibility Study has been conducted on the project which underpinned its value and confirmed an initial rate of return of 69.2%. The 300 MW mouth-of-mine thermal power station has long term scalability with the potential to become a 1000MW plant. The completed full Power Feasibility Study highlighted an annual power output target of 1.8 GW based on annual average coal consumption of 1.5 Mt. An Integrated Bankable Feasibility Study report for the entire project indicated total potential revenues of US$ 7.5-8.5 billion over an initial 25-year mine life, post tax equity IRR between 21-22%, debt pay-back period of 11-12 years and a construction period of 36 months.

 

At the end of 2017 Kibo agreed to acquire 85% of a nearly identical power project in Botswana from Shumba Energy in an all share transaction. Mabesekwa Coal Independent Power Project ('MCIPP') consists of 300Mt subset of the current in-situ 777 Mt coal resource. Notable synergies between the projects provide considerable benefits, including economies of scale in equipment, execution, project finance and strong existing MCPP strategic partnerships. MCIPP already has water and land use permits and environmental certification in place and Pre-Feasibility Study on the coal mine and a Scoping Study on the power plant have been completed. The power plant will have a maximum capacity of 600 MW (4x150MW) and based on a coal delivery rate of 3.2 Mtpa and a Life of Mine of over 30 years.

 

To assist in the execution of this critical power project of the MCPP, Kibo has assembled an international team of advisors and partners including Engineering Procurement and Construction ('EPC') contractors and financial teams that are assisting in the advancement and development of the MCPP. These include ABSA/Barclays as Financial Advisor, China based EPC contractor SEPCO III, General Electric, Tractebel Engineering (Power), Minxcon Consulting (Mining) and legal advisors Norton Rose Fulbright.

 

Johannesburg

1 March 2018

Corporate and Designated Adviser

River Group

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCEANDFEFAPEEF
Date   Source Headline
14th Jun 20188:00 amRNSFinal Results for the year ended 31 December 2017
6th Jun 20182:30 pmRNSNew Energy Joint Venture Agreement in Mozambique
21st May 20188:02 amRNSDuplicate Announcement
21st May 20187:00 amRNSEPC Contract Signed
21st May 20187:00 amRNSFinal Lot of EPC Contract Signed on MCPP
17th May 201810:00 amRNSChange of South African Share Registrar
1st May 201810:44 amRNSIssue of Equity and Directorate Change
17th Apr 20188:00 amRNSUK Investor Show
10th Apr 20182:00 pmRNSCompany Update
5th Apr 20182:00 pmRNSCorrection of Broker Information
5th Apr 201812:51 pmRNSMCPP PPA Update
3rd Apr 201811:15 amRNSAcquisition of a Botswana Power Project Completed
26th Mar 20184:40 pmRNSSecond Price Monitoring Extn
26th Mar 20184:35 pmRNSPrice Monitoring Extension
21st Mar 20188:00 amRNSTanzanian Government Prioritises Private Sector
5th Mar 201810:30 amRNSNew Broker & Update on Placement Proceeds
2nd Mar 201811:45 amRNSUpdate on Broker and Placement Proceeds
2nd Mar 20188:01 amRNSHolding(s) in Company
1st Mar 20189:15 amRNSWarrant Update
1st Mar 20187:30 amRNSNew Corporate Presentation
27th Feb 20184:34 pmRNSPress Speculation
27th Feb 20189:00 amRNSPlacing to raise £750,000
14th Feb 201810:31 amRNSKibo Signs MOU with TANESCO on MCPP
5th Feb 20188:25 amRNSMOU Update
17th Jan 20189:44 amRNSHoldings in Company
10th Jan 20182:15 pmRNSMbeya Coal to Power Project MOU & PPA Update
5th Jan 20187:00 amRNSMbeya Coal to Power Project MOU Update
18th Dec 20177:00 amRNSMbeya Power Project MOU and PPA Update
7th Dec 20178:00 amRNSShareholder Conference Call
30th Nov 20177:00 amRNSAcquisition of Strategic Botswanan Power Project
17th Nov 20178:27 amRNSMonthly Q&A for Investors
16th Nov 20177:00 amRNSUpdated MCPP MOU to Fast-track PPA
31st Oct 20178:00 amRNSCEO Mr Cotzee presenting at OBOR summit in Beijing
27th Oct 20177:00 amRNSMCPP Awarded ESIA Certificate from the Government
12th Oct 20179:37 amRNSKibo's October Investor Q&A Will Be Released Today
28th Sep 20177:00 amRNSConversion of Loan Notes
27th Sep 20177:00 amRNSConvertible Loan Notes
26th Sep 20172:00 pmRNSInterim Results
18th Sep 20177:00 amRNSPPA and Financing Update for African Power Project
12th Sep 20172:45 pmRNSMonthly Q&A for Investors
8th Sep 20178:00 amRNSWins GE Innovation Award for African Power Project
5th Sep 201710:30 amRNSAppointment of Adviser
29th Aug 20177:00 amRNSMCPP Finalizes Transmission Line Bid
22nd Aug 20177:00 amRNSMbeya Coal to Power Project ("MCPP") - Update
26th Jul 20177:00 amRNSMbeya Coal to Power Project ("MCPP") - Update
20th Jul 20177:00 amRNSImweru Drill Programme Complete
14th Jul 201712:30 pmRNSMbeya Coal to Power Project ("MCPP") - Update
12th Jul 20177:00 amRNSImweru Drill Programme Ahead of Schedule
10th Jul 201710:01 amRNSChange of Registered Office
4th Jul 20177:59 amRNSComment on Proposed Legislative Change in Tanzania

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.