Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksKibo Energy Regulatory News (KIBO)

Share Price Information for Kibo Energy (KIBO)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.0375
Bid: 0.035
Ask: 0.04
Change: 0.00 (0.00%)
Spread: 0.005 (14.286%)
Open: 0.0375
High: 0.0375
Low: 0.0375
Prev. Close: 0.0375
KIBO Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Warrant Update

1 Mar 2018 09:15

RNS Number : 3711G
Kibo Mining Plc
01 March 2018
 

 

Kibo Mining Plc (Incorporated in Ireland) (Registration Number: 451931)

(External registration number: 2011/007371/10) Share code on the JSE Limited: KBO

Share code on the AIM: KIBO ISIN: IE00B97C0C31

('Kibo' or 'the Company')

 

 

 

Dated: 1 March 2018

 

Kibo Mining Plc ('Kibo' or the 'Company')

Correction to Kibo RNS dated 24 February 2017

 

The Company wishes to inform shareholders that the 10,000,000 warrants at an exercise price of 9p shown as outstanding to Metal Tiger plc in Kibo's RNS of 24 February 2017 expire on 23 March 2018 and not on 25 February 2018 as stated in the RNS. The Company apologises for this typographical error.

 

 

**ENDS**

 

For further information please visit www.kibomining.com or contact:

 

Louis Coetzee

louisc@kibomining.com

Kibo Mining Plc

Chief Executive Officer

Andreas Lianos

+27 (0) 83 4408365

River Group

Corporate Adviser and Designated Adviser on JSE

Jon Belliss

+44 (0) 20 7382 8300

 

Beaufort Securities Limited

Broker

Andrew Thomson

+61 8 9480 2500

RFC Ambrian Limited

NOMAD on AIM

Isabel de Salis / Priit Piip

+44 (0) 20 7236 1177

St Brides Partners Ltd

Investor and Media Relations Adviser

 

 

Notes to editors

Kibo is a multi-asset resource development and energy company with a long-term goal of becoming a leading power producer in Sub-Saharan Africa. The Company aims to tackle the acute power deficit which is severely hindering economic development in the region.

 

Kibo's flagship asset is the Mbeya Coal to Power Project ('MCPP') in Tanzania which comprises of the development of the Mbeya Coal Mine, a 1.5Mt p/a mining operation and the Mbeya Power Plant, a 300 MW mine-mouth thermal power station.

 

The Mbeya Coal Mine has a defined 120.8 Mt NI 43 101 thermal coal resource. A Definitive Feasibility Study has been conducted on the project which underpinned its value and confirmed an initial rate of return of 69.2%. The 300 MW mouth-of-mine thermal power station has long term scalability with the potential to become a 1000MW plant. The completed full Power Feasibility Study highlighted an annual power output target of 1.8 GW based on annual average coal consumption of 1.5 Mt. An Integrated Bankable Feasibility Study report for the entire project indicated total potential revenues of US$ 7.5-8.5 billion over an initial 25-year mine life, post tax equity IRR between 21-22%, debt pay-back period of 11-12 years and a construction period of 36 months.

 

At the end of 2017 Kibo agreed to acquire 85% of a nearly identical power project in Botswana from Shumba Energy in an all share transaction. Mabesekwa Coal Independent Power Project ('MCIPP') consists of 300Mt subset of the current in-situ 777 Mt coal resource. Notable synergies between the projects provide considerable benefits, including economies of scale in equipment, execution, project finance and strong existing MCPP strategic partnerships. MCIPP already has water and land use permits and environmental certification in place and Pre-Feasibility Study on the coal mine and a Scoping Study on the power plant have been completed. The power plant will have a maximum capacity of 600 MW (4x150MW) and based on a coal delivery rate of 3.2 Mtpa and a Life of Mine of over 30 years.

 

To assist in the execution of this critical power project of the MCPP, Kibo has assembled an international team of advisors and partners including Engineering Procurement and Construction ('EPC') contractors and financial teams that are assisting in the advancement and development of the MCPP. These include ABSA/Barclays as Financial Advisor, China based EPC contractor SEPCO III, General Electric, Tractebel Engineering (Power), Minxcon Consulting (Mining) and legal advisors Norton Rose Fulbright.

 

Johannesburg

1 March 2018

Corporate and Designated Adviser

River Group

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCEANDFEFAPEEF
Date   Source Headline
8th Mar 20198:15 amRNSUpdate Conversion of Sanderson Interest in Mbeya
5th Mar 201910:45 amRNSConversion of Sanderson Minority Interest in Mbeya
27th Feb 201910:20 amRNSUpdate on MAST Energy Developments Limited
15th Feb 20198:00 amRNSHolding(s) in Company
14th Feb 201910:15 amRNSUpdate on MCPP in Tanzania
8th Feb 201910:45 amRNSTR 1: Major Holdings Notification
30th Jan 20197:05 amRNSUpdate on Benga Power Plant Project
30th Jan 20197:00 amRNSUpdate on MAST Energy Developments Limited
29th Jan 201910:00 amRNSNew Corporate Presentation
22nd Jan 20197:00 amRNSInvestor Event
9th Jan 20192:00 pmRNSPrice Monitoring Extension
7th Jan 20197:00 amRNSLetter to Shareholders
12th Dec 20187:00 amRNSRenewed MOU with Mozambican electric utility EDM
11th Dec 20187:00 amRNSSEPCO III Strategic Development Agreement
10th Dec 20187:25 amRNSExclusivity to Acquire 1st UK Reserve Power Sites
7th Dec 201810:20 amRNSUpdate on MCPP in Tanzania
3rd Dec 20188:15 amRNSStrategic Development Agreement with SEPCOIII
26th Nov 20182:35 pmRNSCompleted Sale of Haneti Nickel Project
9th Nov 201812:45 pmRNSUpdate on Mabesekwa Project, Botswana
7th Nov 20189:55 amRNSUpdate on MCPP in Tanzania
2nd Nov 201811:15 amRNSUpdate on MCPP in Tanzania
23rd Oct 20187:00 amRNSShareholder Q&A
19th Oct 20184:45 pmRNSUpdate on MCPP in Tanzania - Replacement
19th Oct 20187:00 amRNSUpdate on MCPP in Tanzania
16th Oct 201812:45 pmRNSChange of Adviser
16th Oct 20187:02 amRNSLaunch of New Website
9th Oct 20188:10 amRNSCompleted Acquisition of 60% Interest in MED
1st Oct 20187:00 amRNSStrategic Development Agreement with SEPCOIII
26th Sep 20187:00 amRNSFurther update on MCPP in Tanzania
18th Sep 20188:30 amRNSUpdate on MCPP in Tanzania
14th Sep 201812:00 pmRNSUnaudited Interim results - 30 June 2018
5th Sep 20188:45 amRNSNew Corporate Presentation
29th Aug 20181:25 pmRNSCollaboration Agreement with General Electric
16th Aug 20187:00 amRNSMCPP Update
15th Aug 20187:00 amRNSAcquisition of 60% in UK Power Project Company
6th Aug 20187:02 amRNSCompletion of Second School Support Project
3rd Aug 20187:00 amRNSChange of Name
30th Jul 201811:00 amRNSResult of AGM
30th Jul 20188:20 amRNSDetails of Equity Placing
27th Jul 20188:00 amRNSCorporate Presentation and Change of Advisor
19th Jul 20187:00 amRNSMbeya Special Mining Licence Update
9th Jul 20187:47 amRNSFull settlement of the Sanderson Facility
3rd Jul 20187:00 amRNSStrategic Development Agreement with SEPCOIII
29th Jun 201811:15 amRNSMBEYA COAL TO POWER PROJECT PPA UPDATE
29th Jun 20187:00 amRNSPress Speculation
28th Jun 20187:00 amRNSBenga JV Finalised and Commencement of Feasibility
25th Jun 20187:00 amRNSNotice of AGM and 2017 AFS available on website
22nd Jun 201812:05 pmRNSVox Markets Podcast
22nd Jun 20187:15 amRNSSale of Haneti Nickel Project
21st Jun 20182:55 pmRNSSAMREC-Compliant Coal Resource Statement Mabesekwa

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.