Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksKibo Energy Regulatory News (KIBO)

Share Price Information for Kibo Energy (KIBO)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.0375
Bid: 0.035
Ask: 0.04
Change: 0.00 (0.00%)
Spread: 0.005 (14.286%)
Open: 0.0375
High: 0.0375
Low: 0.0375
Prev. Close: 0.0375
KIBO Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Warrant Update

1 Mar 2018 09:15

RNS Number : 3711G
Kibo Mining Plc
01 March 2018
 

 

Kibo Mining Plc (Incorporated in Ireland) (Registration Number: 451931)

(External registration number: 2011/007371/10) Share code on the JSE Limited: KBO

Share code on the AIM: KIBO ISIN: IE00B97C0C31

('Kibo' or 'the Company')

 

 

 

Dated: 1 March 2018

 

Kibo Mining Plc ('Kibo' or the 'Company')

Correction to Kibo RNS dated 24 February 2017

 

The Company wishes to inform shareholders that the 10,000,000 warrants at an exercise price of 9p shown as outstanding to Metal Tiger plc in Kibo's RNS of 24 February 2017 expire on 23 March 2018 and not on 25 February 2018 as stated in the RNS. The Company apologises for this typographical error.

 

 

**ENDS**

 

For further information please visit www.kibomining.com or contact:

 

Louis Coetzee

louisc@kibomining.com

Kibo Mining Plc

Chief Executive Officer

Andreas Lianos

+27 (0) 83 4408365

River Group

Corporate Adviser and Designated Adviser on JSE

Jon Belliss

+44 (0) 20 7382 8300

 

Beaufort Securities Limited

Broker

Andrew Thomson

+61 8 9480 2500

RFC Ambrian Limited

NOMAD on AIM

Isabel de Salis / Priit Piip

+44 (0) 20 7236 1177

St Brides Partners Ltd

Investor and Media Relations Adviser

 

 

Notes to editors

Kibo is a multi-asset resource development and energy company with a long-term goal of becoming a leading power producer in Sub-Saharan Africa. The Company aims to tackle the acute power deficit which is severely hindering economic development in the region.

 

Kibo's flagship asset is the Mbeya Coal to Power Project ('MCPP') in Tanzania which comprises of the development of the Mbeya Coal Mine, a 1.5Mt p/a mining operation and the Mbeya Power Plant, a 300 MW mine-mouth thermal power station.

 

The Mbeya Coal Mine has a defined 120.8 Mt NI 43 101 thermal coal resource. A Definitive Feasibility Study has been conducted on the project which underpinned its value and confirmed an initial rate of return of 69.2%. The 300 MW mouth-of-mine thermal power station has long term scalability with the potential to become a 1000MW plant. The completed full Power Feasibility Study highlighted an annual power output target of 1.8 GW based on annual average coal consumption of 1.5 Mt. An Integrated Bankable Feasibility Study report for the entire project indicated total potential revenues of US$ 7.5-8.5 billion over an initial 25-year mine life, post tax equity IRR between 21-22%, debt pay-back period of 11-12 years and a construction period of 36 months.

 

At the end of 2017 Kibo agreed to acquire 85% of a nearly identical power project in Botswana from Shumba Energy in an all share transaction. Mabesekwa Coal Independent Power Project ('MCIPP') consists of 300Mt subset of the current in-situ 777 Mt coal resource. Notable synergies between the projects provide considerable benefits, including economies of scale in equipment, execution, project finance and strong existing MCPP strategic partnerships. MCIPP already has water and land use permits and environmental certification in place and Pre-Feasibility Study on the coal mine and a Scoping Study on the power plant have been completed. The power plant will have a maximum capacity of 600 MW (4x150MW) and based on a coal delivery rate of 3.2 Mtpa and a Life of Mine of over 30 years.

 

To assist in the execution of this critical power project of the MCPP, Kibo has assembled an international team of advisors and partners including Engineering Procurement and Construction ('EPC') contractors and financial teams that are assisting in the advancement and development of the MCPP. These include ABSA/Barclays as Financial Advisor, China based EPC contractor SEPCO III, General Electric, Tractebel Engineering (Power), Minxcon Consulting (Mining) and legal advisors Norton Rose Fulbright.

 

Johannesburg

1 March 2018

Corporate and Designated Adviser

River Group

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCEANDFEFAPEEF
Date   Source Headline
14th Jan 20217:55 amRNSTR-1: Notification of major holdings
12th Jan 20212:06 pmRNSSecond Price Monitoring Extn
12th Jan 20212:00 pmRNSPrice Monitoring Extension
22nd Dec 20208:00 amRNSBenga Power Plant Project Update
21st Dec 20207:00 amRNSSloan (MED) to Trigger 2nd Production-Ready Site
17th Dec 20208:00 amRNSUpdate on PPA with Baobab Resources Ltd
14th Dec 202012:40 pmRNSResults of AGM
11th Dec 20202:05 pmRNSSecond Price Monitoring Extn
11th Dec 20202:00 pmRNSPrice Monitoring Extension
20th Nov 202010:00 amRNSNotice of AGM
20th Nov 20208:00 amRNSTR-1: Notification of major holdings
19th Nov 20204:41 pmRNSSecond Price Monitoring Extn
19th Nov 20204:36 pmRNSPrice Monitoring Extension
12th Nov 202011:06 amRNSSecond Price Monitoring Extn
12th Nov 202011:00 amRNSPrice Monitoring Extension
10th Nov 202011:06 amRNSSecond Price Monitoring Extn
10th Nov 202011:00 amRNSPrice Monitoring Extension
6th Nov 20203:45 pmRNSIssue of Shares in lieu of payment to Contractors
3rd Nov 20204:41 pmRNSSecond Price Monitoring Extn
3rd Nov 20204:35 pmRNSPrice Monitoring Extension
3rd Nov 20202:06 pmRNSSecond Price Monitoring Extn
3rd Nov 20202:00 pmRNSPrice Monitoring Extension
28th Oct 20208:00 amRNSUK Subsidiary Secures Third Reserve Power Site
23rd Oct 20204:41 pmRNSSecond Price Monitoring Extn
23rd Oct 20204:35 pmRNSPrice Monitoring Extension
22nd Oct 20208:00 amRNSUnaudited Interim results 30 June 2020
22nd Oct 20207:55 amRNSTR-1: Notification of major holdings
15th Oct 202011:05 amRNSSecond Price Monitoring Extn
15th Oct 202011:00 amRNSPrice Monitoring Extension
14th Oct 20207:00 amRNSAppointment of Executive Director
13th Oct 202011:00 amRNSNew Corporate Presentation
13th Oct 20207:00 amRNSTR-1: notification of major holdings
9th Oct 20209:20 amRNSTR-1: Standard notification of major holdings
6th Oct 20204:40 pmRNSSecond Price Monitoring Extn
6th Oct 20204:35 pmRNSPrice Monitoring Extension
6th Oct 20209:40 amRNSInvestor Webinar
1st Oct 20209:55 amRNSUpdate on PPA with Baobab Resources Ltd
30th Sep 20207:00 amRNSTR-1: Standard form notification of major holdings
23rd Sep 20208:00 amRNSResults for the Year Ended 31 December 2019
18th Sep 20208:00 amRNSClarification to Company RNS of 17 September 2020
17th Sep 20207:00 amRNSSettlement and Termination of CLN's and Placing
7th Sep 20208:25 amRNSSloane Acquires 9 MW flexible power project
4th Sep 20209:35 amRNSTR-1: Notification of major holdings
2nd Sep 20201:35 pmRNSIssue of Conversion Shares
26th Aug 202010:10 amRNSUpdate on the Mozambique Power Project Portfolio
25th Aug 202012:00 pmRNSPublication of Full Year and Half-Yearly Accounts
24th Aug 20203:00 pmRNSFacility Arrangement Fee & Conversion Shares Issue
24th Aug 202010:35 amRNSResults of EGM
19th Aug 20204:41 pmRNSSecond Price Monitoring Extn
19th Aug 20204:36 pmRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.