Less Ads, More Data, More Tools Register for FREE

Pin to quick picksKibo Energy Regulatory News (KIBO)

  • This share is currently suspended. It was suspended at a price of 0.0065

Share Price Information for Kibo Energy (KIBO)

Share Price is delayed by 15 minutes
Get Live Data
0.0065    0.00 (0.00%)
Bid:
0.00
Ask:
0.00
Spread: 0.00 (0.00%)
Market Cap: £956.49k
KIBO Live PriceLast checked at - London Stock Exchange

Intraday Kibo Energy Share Chart

MCPP: Completion of Water Availability Study

30 Jun 2016 07:00

RNS Number : 6931C
Kibo Mining Plc
30 June 2016
 

Kibo Mining Plc

(Incorporated in Ireland)

(Registration Number: 451931)

(External registration number: 2011/007371/10)

Share code on the JSE Limited: KBO

Share code on the AIM: KIBO

ISIN:IE00B97C0C31

("Kibo" or "the Company")

 

30 June 2016

 

Mbeya Coal to Power Project: Completion of Water Availability Study

Kibo Mining plc ("Kibo" or the "Company") (AIM: KIBO; AltX: KBO), the Tanzania focussed mineral exploration and development company is pleased to announce completion of the independent, integrated Water Availability Study for the Mbeya Coal to Power Project ("MCPP").

The Water Availability Study ("the Study"), to determine sustainable groundwater yields and pit inflows through aquifer testing and numerical flow modelling, was performed by Shangoni Management Services, the consultants appointed to execute the Environmental and Social Impact Assessment for the MCPP. The following activities formed part of the Study:

1. Geophysics (resistivity surveys) within the vicinity of the Study area, with focus in and around the pit area to determine geological anomalies or lineaments and preferential flow paths for the movement of groundwater.

2. Drilling of boreholes into identified anomalies.

3. Aquifer testing (slug and pump testing) to determine aquifer hydraulics for flow modelling (pit inflows) and sustainable borehole yields.

4. Water sampling for hydro chemical and biological analyses (and general borehole surveys including GPS surveying (XYZ) and static water levels for model calibration.

5. Numerical modelling inclusive of steady- and transient state flow models to determine pit inflows for the Life of Mine ("LoM") and dewatering strategies. The numerical model aimed to:

a. estimate the groundwater seepage rate to the pit over the Life of Mine (LOM); and

b. estimate the sustainable yield of the aquifer(s) in the area with a view to meeting the bulk water supply to the proposed project.

The Study concluded that ground water would be available in sufficient and sustainable quantities throughout the life of plant, to adequately supply the power station with water in accordance with the power plant design specifications, stated in the MCPP Power Feasibility Study.

 

Louis Coetzee, CEO of Kibo Mining plc said " We are delighted with the outcome of the Water Availability Study and with yet another work stream completed we are getting ever closer to concluding work on the MCPP feasibility studies. This study also formed a very important part of the ESIA which is now also nearing completion as scheduled."

Contacts

 

 

Louis Coetzee

+27 (0) 83 2606126

Kibo Mining plc

Chief Executive Officer

Andreas Lianos

+27 (0) 83 4408365

River Group

Corporate Adviser and Designated Adviser on JSE

Jon Belliss

+44 (0) 207 382 8300

Beaufort Securities Limited

Broker

Oliver Morse

+61 8 9480 2500

RFC Ambrian Limited

Nominated Adviser on AIM

Daniel Thöle / Anna Legge

 

+44 (0) 203 772 2500

 

Bell Pottinger

Investor and Media Relations

 

Kibo Mining - Notes to editors

Kibo Mining is listed on the AIM market in London and the AltX in Johannesburg. The Company is focused on exploration and development of mineral projects in Tanzania, and controls one of Tanzania's largest mineral right portfolios. Tanzania provides a secure and stable operating environment for the mineral resource industry and Kibo Mining therein.

 

Kibo Mining holds a thermal coal deposit at Mbeya, which has a significant NI 43-101 compliant defined resource, and is developing a 250-350 MW mouth-of-mine thermal power station, the Mbeya Coal to Power Project ("MCPP"), previously called Mbeya Coal to Power Project ("MCPP"), with an established management team that includes Standard Bank as Financial Advisor. Kibo is undertaking a Coal Mining Definitive Feasibility Study and a Power Pre-Feasibility Study for the Mbeya project with an integrated Bankable Feasibility Study report for the MCPP to be released in the near term. On 20th April 2015, Kibo signed a Joint Development Agreement for the completion of the Definitive Feasibility Studies and development of the MCPP with China based EPC contractor SEPCO III.

 

The Company also has extensive gold focused interests including Lake Victoria Goldfields and Morogoro projects. At Lake Victoria, the Company has projects with a 550,000 oz. JORC compliant gold Mineral Resource at Imweru Project and a 168,000 oz. NI 43-101 compliant gold Mineral Resource at the Lubando Project in which the Company holds a 90% attributable interest. The Company is currently undertaking a Definitive Feasibility Study on its Imweru Project.

 

Kibo also holds the Haneti Project on which the latest technical report confirms prospectivity for nickel, PGMs, gold and strategic metals including lithium.

 

Kibo Mining further holds the Pinewood (coal & uranium) project where the company has entered into a 50/50 Exploration Joint Venture with Metal Tiger plc.

 

Finally, the Company also holds the Morogoro (gold) project where the company has also entered into a 50/50 Exploration Joint Venture with Metal Tiger plc.

 

The Company's projects are located in the established and gold prolific Lake Victoria Goldfields, the emerging goldfields of eastern Tanzania and the Mtwara Corridor in southern Tanzania where the Government has prioritized infrastructural development attracting significant recent investment in coal and uranium. The Company has a positive working relationship with the Tanzanian government at local, regional and national levels and works hard to maintain positive relationships with all communities where company interests are held. The Company recognizes the potential to enhance the quality of life and opportunity for Tanzanian citizens through careful development of its projects.

 

Updates on the Company's activities are regularly posted on its website www.kibomining.com

 

Johannesburg

30 June 2016

Corporate and Designated Adviser

River Group

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCEALKNALLKEFF
Date   Source Headline
10th Nov 20148:00 amRNSCommencement of Accelerated PFS for RCPP
28th Oct 20148:00 amRNSRukwa DMFS Project Update
14th Oct 20148:00 amRNSCommencement of DFS on Imweru
10th Oct 20148:11 amRNSClarification re CEO shareholding
9th Oct 20147:00 amRNSFirst Financial Indicators for RCPP
8th Oct 20149:15 amRNSKibo Mining raises £855,725 in Share Placing
29th Sep 20148:00 amRNSRCPP Update
25th Sep 20144:00 pmRNSInterim Results
18th Sep 20148:00 amRNSRCPP Update
9th Sep 20148:00 amRNSPreliminary Evaluation confirms Mining Viability
2nd Sep 20148:30 amRNSImweru Exploration Results
21st Aug 20148:31 amRNSProgress with DFS at RCPP
31st Jul 20148:00 amRNSResult of AGM & Completion of Placing
29th Jul 20148:00 amRNSRCPP to commence DMFS
15th Jul 20144:40 pmRNSSecond Price Monitoring Extn
15th Jul 20144:35 pmRNSPrice Monitoring Extension
14th Jul 20148:30 amRNSKibo Mining Plc Share Placing
7th Jul 20149:17 amRNSPosting of 2013 Annual Report
30th Jun 20143:56 pmRNSAnnual Financial Statements & Notice of AGM
27th Jun 201412:40 pmRNSFinal Results
27th May 20149:00 amRNS1st Quarter Results
2nd Apr 20141:00 pmRNSUK Investor Show & Registered Company Address
31st Mar 20149:00 amRNSKibo Mining raises £750,000 in Share Placing
17th Mar 20148:00 amRNSTechnical Report - Haneti
24th Feb 20148:00 amRNSTechnical Report Confirms Imweru Upside Potential
14th Feb 20149:30 amRNSAppointment of Director
23rd Jan 20149:00 amRNSShareholder Update: Financial Year 2013/14
14th Jan 20147:00 amRNSPositive Phase 1 Drilling Results From Imweru
20th Dec 20137:00 amRNSDistribution of Shareholding by Major Shareholder
19th Dec 20137:00 amRNSHaneti Nickel and Imweru Gold Projects Update
13th Dec 20137:30 amRNSHaneti Exploration Project Update
5th Dec 20133:48 pmRNSKibo Re-acquires 100% interest in Haneti
4th Dec 20137:30 amRNSIMWERU GOLD PROJECT COMPLETED AHEAD OF SCHEDULE
19th Nov 20137:30 amRNSUpdate on Exploration Activities
28th Oct 20137:30 amRNSKibo Commences 3,000 metre Drill Programme
8th Oct 20137:00 amRNSManagement Team and Financial Advisor Appointed
1st Oct 20137:00 amRNSKibo Issues of Shares for Cash
30th Sep 20139:45 amRNSHalf Year Results Announcement
16th Sep 20137:00 amRNSRecent Encouraging Stream Sampling Results
11th Sep 20137:00 amRNSRaises further £500,000 in Secondary Placement
9th Sep 20137:30 amRNSHaneti Joint Venture Project Update
30th Aug 201310:52 amRNSKibo raises £1,105,000 in Share Placing
13th Aug 20137:30 amRNSKibo Announces new Consolidated Lake Victoria Gold
1st Aug 20137:00 amRNSChange in UK Broking Arrangements
31st Jul 20134:45 pmRNSRESULTS OF THE ANNUAL GENERAL MEETING
31st Jul 20137:00 amRNSHaneti Project Interim Update
18th Jul 20137:00 amRNSMOU Signed with Korean East West Power
11th Jul 20137:00 amRNSHaneti Interim Project Update
8th Jul 201310:00 amRNSAnnual Report, AGM Date and Director Resignations
1st Jul 20137:00 amRNS15 months results for the period ended 31 Dec 2012

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.