PYX Resources: Achieving volume and diversification milestones. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksKibo Energy Regulatory News (KIBO)

Share Price Information for Kibo Energy (KIBO)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.035
Bid: 0.03
Ask: 0.04
Change: -0.0025 (-6.67%)
Spread: 0.01 (33.333%)
Open: 0.035
High: 0.0375
Low: 0.035
Prev. Close: 0.0375
KIBO Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Kibo Commences 3,000 metre Drill Programme

28 Oct 2013 07:30

RNS Number : 4232R
Kibo Mining Plc
28 October 2013
 

 

Kibo Mining Plc

(Incorporated in Ireland)

(Registration Number: 451931)

(External registration number: 2011/007371/10)

Share code on the JSE Limited: KBO

Share code on the AIM: KIBO

ISIN: IE00B61XQX41

("Kibo" or "the Company")

 

Dated: 28 October 2013

 

Kibo Commences 3,000 metre Drill Programme at Imweru

 

Kibo Mining plc ("Kibo" or the "Company") (AIM: KIBO; AltX: KBO), the mineral exploration and development company focused on gold, nickel, coal and uranium projects in Tanzania, is pleased to announce that it has commenced a 3,000 m drill programme at its Imweru project in northern Tanzania. The project is located in the gold prolific Lake Victoria Goldfield and is situated approximately 35 km west of and along strike of AngloGold Ashanti's world class Geita deposits which have an estimated pre-mining gold endowment of ~ 23 M oz @ 4g/t. Imweru, together with Lubando (approximately 35 km East of Geita) contain a total gold resource of 797,900 oz and are two brownfield exploration projects recently acquired by the Company (refer Kibo RNS dated 13 August 2013 as well as resource table under the "General Background & Strategy" section below).

 

The drill programme at Imweru will comprise approximately 750 m of diamond drilling and 2,250 m of reverse circulation drilling (total 3,000 m) in 20 holes and has been designed to further evaluate the gold mineralized zones identified by previous operators on the project. These mineralized zones extend over 10 km along strike and have been drilled to a maximum depth of about 200 m. Based on this drilling a NI 43-101 compliant Inferred gold resource of 629,000 oz. of gold was calculated for Imweru, the details of which are shown in the table below (taken from report by EBA Engineering Consultants Ltd Report dated March 2010).

 

TABLE1:IMWERU MINERAL RESOURCE SUMMARY - BASECASE*

Category

Measured Resource

Indicated Resource

Inferred Resource

Resource(t)

-

-

17,649,900

Grade(g/t)

-

-

1.11

Grade(oz/ton)

-

-

0.032

Total Gold(oz)

-

-

629,600

 

The current drill programme is designed to infill drill one of the western mineralized zones on the project in order to evaluate it both along strike and at depths of >200m. The drill programme is scheduled to be completed within two months. Kibo anticipates that the results of the drilling will enable it to produce a JORC-compliant resource that will improve on the existing resource and resource categorization, based on the additional geological data from the drilling as well as the re-modeling of the resource, utilizing the current gold price (which is >US$1,300/oz compared to the US$850/oz used in the previous resource estimate).

 

Louis Coetzee, CEO of the Company, commented today:

 

"The Company is very pleased that it has been able to quickly mobilize a drilling team to the Imweru project to fulfill its previously announced objective of completing a drill programme in this area before the end of 2013. The Imweru programme represents the first phase of drilling on its recently acquired projects (Imweru and Lubando) in the Lake Victoria Goldfield, where the Company is confident it can both increase the resources in the mineralized zones outlined to date and also make further significant discoveries."

 

Contacts

 

Louis Coetzee

+27 (0)83 2606126

Kibo Mining plc

Chief Executive Officer

 

Andreas Lianos

 

+27 (0)83 4408365

River Group

Corporate Adviser and Designated Adviser on JSE

Jon Belliss

+44 (0) 20 3216 2630

XCAP

Broker

Stuart Laing

+61 8 94802500

RFC Ambrian Limited

Nominated Adviser on AIM

Matt Beale

+44 (0)7966 389196

Fortbridge

Investor Relations

 

Updates on the Company's activities are regularly posted on its website www.kibomining.com

 

General Background & Strategy

 

Kibo was established in early 2008 to explore and develop mineral deposits in Tanzania, East Africa and was admitted to AIM in London on 27 April 2010 and AltX in Johannesburg on 30 May 2011. The Board of Kibo is composed of professionals whose experience include mineral exploration, mine development, mining finance, tax, law, mergers and acquisitions, and financial control of public companies. It is supported by competent and motivated a Tanzanian staff that operates from Kibo's operations office in Dar es Salaam.

 

The mineral assets of the Company comprise five projects areas in Tanzania - Haneti (nickel, PGE and gold), Morogoro (Gold), Lake Victoria (Gold), Rukwa (Coal) and Pinewood (Coal & Uranium).

 

The Lake Victoria project covering a gold prospective licence portfolio in Tanzania's premier gold mining region, the Lake Victoria Goldfield, been recently enhanced by the addition of two brownfield gold projects Imweu and Lubando. Both projects have NI 43-101 compliant total gold resource of approximately 798,000 ounces (total of Measured, Indicated and Inferred for both projects).

 

TABLE1: IMWERU MINERAL RESOURCE SUMMARY-BASECASE*

Category

Measured Resource

Indicated Resource

Inferred Resource

Resource (t)

-

-

17,649,900

Grade (g/t)

-

-

1.11

Grade (oz/ton)

-

-

0.032

Total Gold (oz)

-

-

629,600

*Numbers are rounded. Composites capped at 25g/t gold. Cut-off grade of 0.5g/t gold based on a gold price of US$850/oz and assumed100% metallurgical recovery .CIM definitions were followed for Mineral Resources.

 

 

TABLE2:LUBANDO MINERALRESOURCE SUMMARY-BASECASE*

 

Category

 

West Zone

East Zone South

 

East Zone Mid

East Zone North

 

Total

Measured Resource

Measured Resource (t)

107,900

4,880

16,900

54,440

184,150

Grade (g/t)

1.69

2.52

1.72

2.48

1.95

Total Gold (oz)

5,900

400

950

4,340

11,500

Indicated Resource

Indicated Resource (t)

280,710

18,330

61,000

149,350

509,420

Grade (g/t)

1.61

2.23

1.89

2.73

1.99

Total Gold (oz)

14,500

1,300

3,700

13,120

32,600

Inferred Resource

Total Resource (t)

1,090,000

65,470

209,340

535,330

1,900,140

Grade (g/t)

1.27

1.56

3.34

3.13

2.03

Total Gold (oz)

44,550

3,300

22,500

53,900

124,200

*Numbers are rounded. Composites capped at10.85g/tgold. Cut-off grade of 0.5g/t gold based on a gold price of US$850/oz and assumed100% metallurgical recovery .CIM definitions were followed for Mineral Resources.

 

These projects provide the Company with drill ready targets supporting its objective to increase the size and quality of the existing resource in the short term.

 

The Haneti project is the subject of a joint venture with Brazilian Votorantim Metais Participações Ltda, a member of Votorantim Group. The Rukwa and Pinewood projects are situated close to the Mtwara Corridor, an area where the Tanzanian Government has committed to significant infrastructure development and which has seen recent multi-million dollar investment in coal and coal-fired power stations and uranium exploration.

 

The Rukwa project is substantially more advanced than Kibo's existing exploration projects, with a significant Mineral Resource of thermal coal already defined. The project enjoys strong support expressed by the Tanzanian Government for the expedited development of a coal mine and mine-mouth coal-fired power plant and which is further enhanced by the now formal relationship between the Korean Government owned Korean East - West Power Co. Ltd. ("EWP") and Kibo. In this relationship the parties have entered into a formal MOU which states the parties' respective commitments towards the joint development of the Rukwa Coal to Power Project ("RCPP"), where EWP will be responsible for developing and operating the power generation side of the RCPP and Kibo will be responsible for developing and operating the mining side of the RCPP.

 

RUKWA COAL RESOURCE SUMMARY- GEMECS (Pty) Ltd

SEAM

NI 43-101

IN SITU

SEAM

THICKNESS

CLASS

MILLION TONS

S4

1.14

Indicated

2.17

S3U

2.04

Indicated

6.92

S3L

2.3

Indicated

12.63

S2

3.45

Indicated

23.43

S1U

2.48

Indicated

7.34

S1L

2.92

Indicated

17.4

S0

1.08

Indicated

1.44

Total Indicated Resources

 

71.34

S4

1.31

Inferred

1.38

S3U

2.24

Inferred

2.94

S3L

2.27

Inferred

3.86

S2

3.42

Inferred

7.94

S1U

2.05

Inferred

6.5

S1L

3.15

Inferred

12.83

S0

1.06

Inferred

2.6

Total Inferred Resources

 

38.05

TOTAL RESOURCES

 

109.39

 

 

Kibo's objective is to build shareholder value in a sustainable manner. This objective will be pursued primarily through active exploration of its own projects and by using the Company's experience in Tanzania to acquire attractive exploration and development assets on competitive terms that can be moved swiftly up the value curve by using the Company's own skills base whilst also seeking to benefit from strategic collaborative relationships with industry leaders who have special skills and competencies within their chosen fields of focus. Kibo will undertake continual risk assessment of its projects and take whatever actions it believes are necessary to ensure that these risks are mitigated.

 

Review by Qualified Person

 

The information in this announcement that relates to the Imweru and Lubando mineral resources is taken from reports titled "Technical Report on the Imweru property (Updated), Mwanza, Tanzania" dated March 1, 2010 and "Technical Report on the Lubando property, Mwanza, Tanzania" dated 31st August 2009" (the "Reports") Both Reports are NI 43-101 compliant and were prepared for Great Basin Gold Rusaf Gold Limited by Nathan Eric Fier C.P.G., P.Eng. Market Director for EBA Engineering Consultants Ltd and a Senior Mining Consultant. Mr. Fier is registered as a Certified Professional Geologist with the American Institute of Professional Geologists, Registration No 10062, and a professional Engineer in British Columbia, Canada Registration No. 135165. He has extensive experience in the evaluation and reporting of Archaean Gold projects and is a "Qualified Person" for reporting gold resources to the NI 43-101 Standard. Theinformation in this announcement that relates to the Rukwa coal resource is taken from a report "Independent Technical Report for the Rukwa Coal Project, Mbeya Region, United Republic of Tanzania" dated 19th April 2012 by CD van Niekerk Director and Principal Geologist with the firm GEMECS (Pty) Ltd. Mr van Niekerk is a Professional Natural Scientist with the South African Council for Natural Scientific Professions (SACNASP), Registration No. 400066/98 and a Fellow Member of the Geological Society of South Africa. He has relevant experience and technical qualifications to be a "Qualified Person" for reporting coal resources to the NI 43-101 Standard.The Company's Exploration Director, Noel O'Keeffe has also reviewed the technical reports and the references to them in this announcement.

 

Johannesburg

28 October 2013

 

Corporate and Designated Adviser

River Group

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCZMMZGGKFGFZM
Date   Source Headline
9th May 202410:45 amRNSKibo Subsidiary MAST Major Shareholdings
8th May 20247:00 amRNSKibo Subsidiary Notice of Annual General Meeting
7th May 20247:00 amRNSKibo Subsidiary Business Update & Financing
30th Apr 20247:00 amRNSKibo Subsidiary MED Accounts’ Publication
26th Apr 20247:00 amRNSKibo Subsidiary Announces Business Update
23rd Apr 20242:30 pmRNSKibo Subsidiary Announces Major Shareholdings
11th Apr 20247:00 amRNSKibo Subsidiary MAST Announces Business Update
5th Mar 20247:00 amRNSIssue of Shares to Service Provider
4th Mar 202410:45 amRNSKibo Subsidiary Announces TR-1 Notification
28th Feb 20247:00 amRNSMAST New Funding Partner & Proventure Cancellation
21st Feb 20242:46 pmRNSHolding(s) in Company
20th Feb 20241:00 pmRNSKibo Subsidiary Announces TR-1 Notification
9th Feb 202412:45 pmRNSResults of Extraordinary General Meeting
5th Feb 20241:55 pmRNSKibo Subsidiary MAST Announces TR-1 Notification
31st Jan 202410:48 amRNSDirector/PDMR Shareholding
24th Jan 20243:45 pmRNSKibo Subsidiary MAST Announces TR-1 Notification
19th Jan 20241:52 pmRNSPDMR Share Sale
18th Jan 20247:00 amRNSNotice of Extraordinary General Meeting (“EGM”)
16th Jan 202410:50 amRNSCorrection on MED Shareholding
16th Jan 20247:00 amRNSKibo Strategy Update
11th Jan 20247:00 amRNSConversion, Equity Issue, TVR & Board Changes
8th Jan 20247:00 amRNSKibo Subsidiary Announces an Update on JVA
2nd Jan 20247:00 amRNSKibo Subsidiary - Further Update of Payment to JVA
22nd Dec 20237:00 amRNSKibo Subsidiary Announces JVA Completion Update
19th Dec 20232:00 pmRNSPDMR Share Sale
15th Dec 20237:00 amRNSSubsidiary Director Loan & PMDR Share Sale
11th Dec 20238:21 amRNSKibo Subsidiary Update JVA Completion Announcement
11th Dec 20237:00 amRNSMAST: Further Update to the Completion of JVA
7th Dec 20232:15 pmRNSResult of AGM
1st Dec 20237:00 amRNSKibo Subsidiary Announces Update of JVA
15th Nov 20237:00 amRNSNotice of AGM
13th Nov 20237:00 amRNSKibo UK Subsidiary JVA Interim Payment Update
26th Oct 20237:00 amRNSChange of Holding in Mast Energy Developments PLC
23rd Oct 20237:00 amRNSKibo Subsidiary - Update on the Completion of JVA
5th Oct 20237:00 amRNSPartial Settlement of Outstanding Shareholder Loan
4th Oct 20237:00 amRNSSale of Coal Interest in Botswana Power Project
29th Sep 20237:00 amRNSUnaudited Interim Results
22nd Sep 20237:00 amRNSKibo Subsidiary Announces Update on JVA Completion
1st Sep 20237:00 amRNSKibo Subsidiary Announces Further Update on JVA
25th Aug 20237:00 amRNSKibo Subsidiary MED Unaudited Interim Results
16th Aug 202310:10 amRNSClarification on Inaccurate Moneyweb Article
7th Aug 202310:25 amRNSDirector/PDMR Shareholding
4th Aug 20237:00 amRNSKibo Subsidiary Announces Update on JV Completion
31st Jul 20237:00 amRNSUpdate on MED Definitive and Binding JVA
24th Jul 20234:40 pmRNSTR-1: Notification of major holdings
12th Jul 20231:15 pmRNSKibo Subsidiary Announces Definitive & Binding JVA
3rd Jul 20237:00 amRNSOperational Update: Q2 2023
29th Jun 20237:00 amRNSAnnual Financial Report
16th Jun 20233:51 pmRNSHolding(s) in Company
2nd Jun 20232:30 pmRNSResults of EGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.