Less Ads, More Data, More Tools Register for FREE

Pin to quick picksKibo Energy Regulatory News (KIBO)

  • This share is currently suspended. It was suspended at a price of 0.0065

Share Price Information for Kibo Energy (KIBO)

Share Price is delayed by 15 minutes
Get Live Data
0.0065    0.00 (0.00%)
Bid:
0.00
Ask:
0.00
Spread: 0.00 (0.00%)
Market Cap: £956.49k
KIBO Live PriceLast checked at - London Stock Exchange

Intraday Kibo Energy Share Chart

MCPP: Completion of Water Availability Study

30 Jun 2016 07:00

RNS Number : 6931C
Kibo Mining Plc
30 June 2016
 

Kibo Mining Plc

(Incorporated in Ireland)

(Registration Number: 451931)

(External registration number: 2011/007371/10)

Share code on the JSE Limited: KBO

Share code on the AIM: KIBO

ISIN:IE00B97C0C31

("Kibo" or "the Company")

 

30 June 2016

 

Mbeya Coal to Power Project: Completion of Water Availability Study

Kibo Mining plc ("Kibo" or the "Company") (AIM: KIBO; AltX: KBO), the Tanzania focussed mineral exploration and development company is pleased to announce completion of the independent, integrated Water Availability Study for the Mbeya Coal to Power Project ("MCPP").

The Water Availability Study ("the Study"), to determine sustainable groundwater yields and pit inflows through aquifer testing and numerical flow modelling, was performed by Shangoni Management Services, the consultants appointed to execute the Environmental and Social Impact Assessment for the MCPP. The following activities formed part of the Study:

1. Geophysics (resistivity surveys) within the vicinity of the Study area, with focus in and around the pit area to determine geological anomalies or lineaments and preferential flow paths for the movement of groundwater.

2. Drilling of boreholes into identified anomalies.

3. Aquifer testing (slug and pump testing) to determine aquifer hydraulics for flow modelling (pit inflows) and sustainable borehole yields.

4. Water sampling for hydro chemical and biological analyses (and general borehole surveys including GPS surveying (XYZ) and static water levels for model calibration.

5. Numerical modelling inclusive of steady- and transient state flow models to determine pit inflows for the Life of Mine ("LoM") and dewatering strategies. The numerical model aimed to:

a. estimate the groundwater seepage rate to the pit over the Life of Mine (LOM); and

b. estimate the sustainable yield of the aquifer(s) in the area with a view to meeting the bulk water supply to the proposed project.

The Study concluded that ground water would be available in sufficient and sustainable quantities throughout the life of plant, to adequately supply the power station with water in accordance with the power plant design specifications, stated in the MCPP Power Feasibility Study.

 

Louis Coetzee, CEO of Kibo Mining plc said " We are delighted with the outcome of the Water Availability Study and with yet another work stream completed we are getting ever closer to concluding work on the MCPP feasibility studies. This study also formed a very important part of the ESIA which is now also nearing completion as scheduled."

Contacts

 

 

Louis Coetzee

+27 (0) 83 2606126

Kibo Mining plc

Chief Executive Officer

Andreas Lianos

+27 (0) 83 4408365

River Group

Corporate Adviser and Designated Adviser on JSE

Jon Belliss

+44 (0) 207 382 8300

Beaufort Securities Limited

Broker

Oliver Morse

+61 8 9480 2500

RFC Ambrian Limited

Nominated Adviser on AIM

Daniel Thöle / Anna Legge

 

+44 (0) 203 772 2500

 

Bell Pottinger

Investor and Media Relations

 

Kibo Mining - Notes to editors

Kibo Mining is listed on the AIM market in London and the AltX in Johannesburg. The Company is focused on exploration and development of mineral projects in Tanzania, and controls one of Tanzania's largest mineral right portfolios. Tanzania provides a secure and stable operating environment for the mineral resource industry and Kibo Mining therein.

 

Kibo Mining holds a thermal coal deposit at Mbeya, which has a significant NI 43-101 compliant defined resource, and is developing a 250-350 MW mouth-of-mine thermal power station, the Mbeya Coal to Power Project ("MCPP"), previously called Mbeya Coal to Power Project ("MCPP"), with an established management team that includes Standard Bank as Financial Advisor. Kibo is undertaking a Coal Mining Definitive Feasibility Study and a Power Pre-Feasibility Study for the Mbeya project with an integrated Bankable Feasibility Study report for the MCPP to be released in the near term. On 20th April 2015, Kibo signed a Joint Development Agreement for the completion of the Definitive Feasibility Studies and development of the MCPP with China based EPC contractor SEPCO III.

 

The Company also has extensive gold focused interests including Lake Victoria Goldfields and Morogoro projects. At Lake Victoria, the Company has projects with a 550,000 oz. JORC compliant gold Mineral Resource at Imweru Project and a 168,000 oz. NI 43-101 compliant gold Mineral Resource at the Lubando Project in which the Company holds a 90% attributable interest. The Company is currently undertaking a Definitive Feasibility Study on its Imweru Project.

 

Kibo also holds the Haneti Project on which the latest technical report confirms prospectivity for nickel, PGMs, gold and strategic metals including lithium.

 

Kibo Mining further holds the Pinewood (coal & uranium) project where the company has entered into a 50/50 Exploration Joint Venture with Metal Tiger plc.

 

Finally, the Company also holds the Morogoro (gold) project where the company has also entered into a 50/50 Exploration Joint Venture with Metal Tiger plc.

 

The Company's projects are located in the established and gold prolific Lake Victoria Goldfields, the emerging goldfields of eastern Tanzania and the Mtwara Corridor in southern Tanzania where the Government has prioritized infrastructural development attracting significant recent investment in coal and uranium. The Company has a positive working relationship with the Tanzanian government at local, regional and national levels and works hard to maintain positive relationships with all communities where company interests are held. The Company recognizes the potential to enhance the quality of life and opportunity for Tanzanian citizens through careful development of its projects.

 

Updates on the Company's activities are regularly posted on its website www.kibomining.com

 

Johannesburg

30 June 2016

Corporate and Designated Adviser

River Group

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCEALKNALLKEFF
Date   Source Headline
19th Jun 20137:00 amRNSHaneti Project Update
3rd Jun 201310:31 amRNSProjects Update Announcement
26th Apr 20134:36 pmRNSIssue of shares for Cash
24th Apr 20133:16 pmRNSPROJECT UPDATE & PLACING
10th Apr 20138:04 amRNSKibo commences program on Haneti Nickel
22nd Mar 201312:30 pmRNSResults of EGM and Capital Reorganisation Details
11th Mar 20137:02 amRNSTanzanian Government Declares Support for Rukwa
5th Mar 20132:19 pmRNSCapital Reorganisation and Issue of Equity
28th Feb 20131:38 pmRNSAppointment of XCAP as new joint Corporate Broker
14th Feb 20131:53 pmRNSInvitation from Tanzanian Government to present
11th Feb 201311:57 amRNSChange in UK Broking Arrangements
25th Jan 20132:07 pmRNSRETIREMENT OF DIRECTOR
17th Jan 201310:39 amRNSIssue of Shares Announcement
9th Jan 20137:08 amRNSKibo Mining plc raises £725,000 of working capital
12th Dec 201210:18 amRNSJoint Venture with Votorantim Group finalised
12th Dec 20129:38 amRNSSHAREHOLDER AND TRADING UPDATE, CHANGE OF YEAR END
14th Nov 20127:00 amRNSSignificant Anomaly Identified at Morogoro South P
18th Oct 20123:05 pmRNSIssue of shares for Cash
6th Sep 201212:50 pmRNSRESULTS OF EXTRAORDINARY GENERAL MEETING
20th Aug 201212:56 pmRNSSchedule 1 - Kibo Mining Plc
15th Aug 20127:30 amRNSRestoration - Kibo Mining Plc
15th Aug 20127:00 amRNSRE-ADMISSION OF KIBO SHARES
21st Jun 20128:04 amRNSOperational Update
21st Jun 20127:58 amRNSHalf Yearly Report
22nd May 20129:43 amRNSAppointment of Joint Broker
15th May 20128:56 amRNSMemorandum of Understanding for Tanzanian Mine
11th May 201212:12 pmRNSKIBO APPOINTS RFC AMBRIAN AS NOMINATED ADVISER
11th May 20127:30 amRNSSuspension - Kibo Mining Plc
11th May 20127:30 amRNSTemporary Suspension - Proposed Acquisition
8th May 20122:05 pmRNSMemorandum of Understanding
17th Apr 20127:00 amRNSPropsed Adjournment of Annual General Meeting
2nd Apr 20127:00 amRNSMEL Acquisition
30th Mar 20127:00 amRNSFinal Results
5th Mar 20121:00 pmRNSChange of Adviser
29th Feb 20127:00 amRNSTotal Voting Rights
7th Feb 20124:40 pmRNSSecond Price Monitoring Extn
7th Feb 20124:35 pmRNSPrice Monitoring Extension
7th Feb 20122:45 pmRNSIssue of Equity
30th Jan 20127:00 amRNSStage 1 Exploration Programme Update
20th Dec 20112:00 pmRNSItetemia and Luhala Update
4th Nov 20117:00 amRNSManagement Changes
7th Oct 20117:00 amRNSOperational Update
3rd Aug 20111:00 pmRNSChange of Adviser
30th Jun 20119:49 amRNSTotal Voting Rights
29th Jun 20111:00 pmRNSHalf Year Results for period ended 31 March 2011
8th Jun 20118:00 amRNSDirectorate Change
2nd Jun 20111:30 pmRNSIssue of Equity
27th May 20117:00 amRNSJSE Listing - Abridged PLS
23rd May 20112:42 pmRNSJSE Listing Update
28th Apr 20112:07 pmRNSGrant of Options

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.