Adrian Hargrave, CEO of SEEEN, explains how the new funds will accelerate customer growth Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCadence Mineral Regulatory News (KDNC)

Share Price Information for Cadence Mineral (KDNC)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 4.15
Bid: 4.10
Ask: 4.20
Change: 0.00 (0.00%)
Spread: 0.10 (2.439%)
Open: 4.15
High: 4.15
Low: 4.15
Prev. Close: 4.15
KDNC Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Contract Awarded for Yangibana Processing Plant

21 Oct 2019 11:04

RNS Number : 5567Q
Cadence Minerals PLC
21 October 2019
 

Cadence Minerals Plc

 

("Cadence Minerals", "Cadence" or "the Company")

 

Hastings Technology Metals (ASX:HAS) - DRA Pacific Awarded EPCM Contract Yangibana Processing Plant.

 

Cadence Minerals (AIM/NEX: KDNC; OTC: KDNCY) is pleased to announce Hastings Technology Metals (ASX:HAS) ("Hastings"), Cadence's joint venture partner at the Yangibana Rare Earth Project in the Gascoyne region of Western Australia ("Yangibana Project"), has announced that it has awarded the Engineering, Procurement, Construction and Management (EPCM) contract for its rare earths processing plant and the associated infrastructure for the Yangibana process plant in the Gascoyne Region of Western Australia to DRA Pacific Pty Ltd ("DRA Pacific"), a diversified global engineering, project delivery and operations management. The appointment of DRA Pacific as the EPCM contractor for the Yangibana Project was preceded by a series of value engineering studies and the Front-End-Engineering-Design ("FEED") completed by DRA Pacific during 2018 and 2019. DRA Pacific's EPCM contract will cover all aspects of the design and construction of the processing facility and associated non-process infrastructure capable of producing 15,000 tonnes of Mixed Rare Earths Carbonate (MREC) per year.

Cadence Minerals Yangibana Holding:

Cadence owns 30% of the Yangibana North, Gossan, Hook, Kanes Gossan, Lions Ear and Bald Hill North Rare Earth Deposit, which form part of the Yangibana Rare Earth Deposit. Probable Ore Reserves of some 2.1 million tonnes at 1.66% total rare earth elements are contained within 30% owned joint venture tenements. Further details of these reserves and pre-feasibility study can be found at: http://irservices.netbuilder.com/ir/cadence/newsArticle.php?ST=REM&id=2688632.

Highlights:

·; DRA Pacific Pty Ltd awarded the Engineering, Procurement and Contract Management (EPCM) Contract for the Yangibana Rare Earths Processing Plant.

·; The scope of works under the DRA Pacific Pty Ltd EPCM agreement has an estimated capital value of circa A$350m.

·; DRA Pacific's parent DRA Global Ltd have extensive experience in designing and building mineral processing facilities worldwide and their personnel have previously delivered rare earth plants in Western Australia.

·; The key component of the contract terms is the comprehensive performance guarantee linked to ore throughput for the entire process flow sheet.

The EPCM contract is the single largest dollar value contract associated with the Yangibana Project. It is also a fundamental requirement of Hastings' debt providers and hence is pivotal to the project financing process. Works directed under the EPCM Contract have an estimated value of approximately A$350M.

The key component of the contract terms is the comprehensive performance guarantee linked to ore throughput for the entire process flow sheet.

The appointment of DRA Pacific as the EPCM contractor for Hastings represents another critical milestone for the Project, reinforcing that Yangibana is execution ready.

Choosing DRA Pacific was the logical choice given the already close working relationship built up over the last 15 months, and the experience in rare earths processing plant design that DRA Pacific bring to the table.

The full release can be found at: https://www.asx.com.au/asxpdf/20191021/pdf/449nzf57qlq659.pdf

Hastings Executive Chairman Charles Lew said: "We are pleased to have DRA involved in the construction of the Yangibana processing plant. Their knowledge and experience in developing successful minerals processing projects makes them the ideal candidate to manage the construction of our project. The award of the EPCM contract moves the Yangibana Rare Earths Project firmly into development phase to commence project execution and progress to production of our mixed rare earth carbonate by 2022."

Cadence CEO Kiran Morzaria commented: "The appointment of DRA Pacific represents a key step for Yangibana. Not only is it key to the project funding going forward, the EPCM contract terms include a comprehensive performance guarantee linked to ore throughput. Today's announcement provides further validation for our investment strategy into the Yangibana joint venture with Hastings."

- Ends -

For further information:

Cadence Minerals plc

+44 (0) 207 440 0647

Andrew Suckling

Kiran Morzaria

WH Ireland Limited (NOMAD & Broker)

+44 (0) 207 220 1666

James Joyce

James Sinclair-Ford

Novum Securities Limited (Joint Broker)

+44 (0) 207 399 9400

Jon Belliss

 

 

Qualified Person

Kiran Morzaria B.Eng. (ACSM), MBA, has reviewed and approved the information contained in this announcement. Kiran holds a Bachelor of Engineering (Industrial Geology) from the Camborne School of Mines and an MBA (Finance) from CASS Business School.

 

Forward-Looking Statements:

Certain statements in this announcement are or may be deemed to be forward-looking statements. Forward-looking statements are identified by their use of terms and phrases such as ''believe'' ''could'' "should" ''envisage'' ''estimate'' ''intend'' ''may'' ''plan'' ''will'' or the negative of those variations or comparable expressions including references to assumptions. These forward-looking statements are not based on historical facts but rather on the Directors' current expectations and assumptions regarding the Company's future growth results of operations performance future capital and other expenditures (including the amount. nature and sources of funding thereof) competitive advantages business prospects and opportunities. Such forward-looking statements reflect the Directors' current beliefs and assumptions and are based on information currently available to the Directors. Many factors could cause actual results to differ materially from the results discussed in the forward-looking statements including risks associated with vulnerability to general economic and business conditions competition environmental and other regulatory changes actions by governmental authorities the availability of capital markets reliance on key personnel uninsured and underinsured losses and other factors many of which are beyond the control of the Company. Although any forward-looking statements contained in this announcement are based upon what the Directors believe to be reasonable assumptions. The Company cannot assure investors that actual results will be consistent with such forward-looking statements.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
CNTPGGUUUUPBGUG
Date   Source Headline
29th Aug 20132:42 pmRNSExercise of Warrants
29th Aug 20137:00 amRNSMexico Lithium Project Maiden Resource Estimate
28th Aug 20132:37 pmRNSStatement re: JV Partner Trading Halt in Canada
27th Aug 20137:00 amRNSIncrease in ownership of Mexico Lithium Project
23rd Aug 20137:00 amRNSPlacement of Equity
21st Aug 20137:00 amRNSFinal Drill Results Mexico Lithium Project
14th Aug 201310:51 amRNSUpdate on Mexico Lithium Project
13th Aug 20132:10 pmRNSStatement re: Mexico Lithium Project Update
16th Jul 20134:08 pmRNSResult of AGM
25th Jun 201312:53 pmRNSFinal Results
24th Jun 20137:00 amRNSInitial Drill Results On Sonora Lithium Project
17th Jun 20137:00 amRNSMexico Drilling Update and Placing
7th Jun 20137:00 amRNSDrilling Update
4th Jun 20137:00 amRNSDrilling Update - Mexican Lithium Joint Venture
23rd May 20137:00 amRNSFarm-In Finalised and Drilling Commences
11th Apr 20137:09 amRNSUpdate on Lithium Joint Venture, Mexico
25th Mar 20137:00 amRNSField Work Commences on the Bacanora
11th Mar 20132:59 pmRNSCompletion of Placing
6th Mar 20134:31 pmRNSEquity Placement
14th Feb 20137:00 amRNSREM signs Lithium farm-in deal in Northern Mexico
4th Feb 20137:00 amRNSREM applies for Greenland Rare Earth Licence
14th Dec 20125:33 pmRNSAmendment to Options
13th Dec 20123:21 pmRNSIssue of Options
6th Dec 20127:00 amRNSCompletion of Placing
30th Nov 20122:49 pmRNSTR1 - Notification of major interest in shares
28th Nov 201210:59 amRNSEquity Placement
20th Nov 20122:07 pmRNSTR1 - Notification of major interest in shares
19th Nov 20124:59 pmRNSTR1 - Notification of major interestin shares
2nd Nov 201212:08 pmRNSResult of AGM
9th Oct 201211:05 amRNSNotice of AGM
24th Sep 20124:23 pmRNSInterim Results
7th Sep 20123:03 pmRNSResignation of Director
25th Jul 20128:29 amRNSAward of Greenland Exploration Licences
16th Apr 20121:33 pmRNSDirectorate Change
2nd Apr 20127:00 amRNSReplacement : Final Results
30th Mar 20127:00 amRNSFinal Results
29th Mar 201212:55 pmRNSYangibana Project
3rd Jan 20129:44 amRNSHolding(s) in Company
6th Dec 20117:00 amRNSAcquisition of Interest
1st Dec 201111:39 amRNSInvestment in Australian Project
24th Oct 20117:00 amRNSFollow-up Rare Earth Samples from Canada
9th Sep 20111:38 pmRNSReplacement - Total Voting Rights
9th Sep 20111:34 pmRNSChange of Accounting Reference Date
9th Sep 20111:05 pmRNSTotal Voting Rights
31st Aug 20114:39 pmRNSREM - Total Voting Rights
15th Aug 20117:00 amRNSFirst Rare Earth Samples from Canada
6th Jul 20117:00 amRNSUpdate on Cup Lake Rare Earth Project
27th May 20117:00 amRNSCompletion of Placing
5th May 20113:52 pmRNSIssue of Equity
5th May 201110:13 amRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.