focusIR May 2024 Investor Webinar: Blue Whale, Kavango, Taseko Mines & CQS Natural Resources. Catch up with the webinar here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCadence Mineral Regulatory News (KDNC)

Share Price Information for Cadence Mineral (KDNC)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 4.30
Bid: 4.20
Ask: 4.40
Change: -0.05 (-1.15%)
Spread: 0.20 (4.762%)
Open: 4.35
High: 4.50
Low: 4.25
Prev. Close: 4.35
KDNC Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Contract Awarded for Yangibana Processing Plant

21 Oct 2019 11:04

RNS Number : 5567Q
Cadence Minerals PLC
21 October 2019
 

Cadence Minerals Plc

 

("Cadence Minerals", "Cadence" or "the Company")

 

Hastings Technology Metals (ASX:HAS) - DRA Pacific Awarded EPCM Contract Yangibana Processing Plant.

 

Cadence Minerals (AIM/NEX: KDNC; OTC: KDNCY) is pleased to announce Hastings Technology Metals (ASX:HAS) ("Hastings"), Cadence's joint venture partner at the Yangibana Rare Earth Project in the Gascoyne region of Western Australia ("Yangibana Project"), has announced that it has awarded the Engineering, Procurement, Construction and Management (EPCM) contract for its rare earths processing plant and the associated infrastructure for the Yangibana process plant in the Gascoyne Region of Western Australia to DRA Pacific Pty Ltd ("DRA Pacific"), a diversified global engineering, project delivery and operations management. The appointment of DRA Pacific as the EPCM contractor for the Yangibana Project was preceded by a series of value engineering studies and the Front-End-Engineering-Design ("FEED") completed by DRA Pacific during 2018 and 2019. DRA Pacific's EPCM contract will cover all aspects of the design and construction of the processing facility and associated non-process infrastructure capable of producing 15,000 tonnes of Mixed Rare Earths Carbonate (MREC) per year.

Cadence Minerals Yangibana Holding:

Cadence owns 30% of the Yangibana North, Gossan, Hook, Kanes Gossan, Lions Ear and Bald Hill North Rare Earth Deposit, which form part of the Yangibana Rare Earth Deposit. Probable Ore Reserves of some 2.1 million tonnes at 1.66% total rare earth elements are contained within 30% owned joint venture tenements. Further details of these reserves and pre-feasibility study can be found at: http://irservices.netbuilder.com/ir/cadence/newsArticle.php?ST=REM&id=2688632.

Highlights:

·; DRA Pacific Pty Ltd awarded the Engineering, Procurement and Contract Management (EPCM) Contract for the Yangibana Rare Earths Processing Plant.

·; The scope of works under the DRA Pacific Pty Ltd EPCM agreement has an estimated capital value of circa A$350m.

·; DRA Pacific's parent DRA Global Ltd have extensive experience in designing and building mineral processing facilities worldwide and their personnel have previously delivered rare earth plants in Western Australia.

·; The key component of the contract terms is the comprehensive performance guarantee linked to ore throughput for the entire process flow sheet.

The EPCM contract is the single largest dollar value contract associated with the Yangibana Project. It is also a fundamental requirement of Hastings' debt providers and hence is pivotal to the project financing process. Works directed under the EPCM Contract have an estimated value of approximately A$350M.

The key component of the contract terms is the comprehensive performance guarantee linked to ore throughput for the entire process flow sheet.

The appointment of DRA Pacific as the EPCM contractor for Hastings represents another critical milestone for the Project, reinforcing that Yangibana is execution ready.

Choosing DRA Pacific was the logical choice given the already close working relationship built up over the last 15 months, and the experience in rare earths processing plant design that DRA Pacific bring to the table.

The full release can be found at: https://www.asx.com.au/asxpdf/20191021/pdf/449nzf57qlq659.pdf

Hastings Executive Chairman Charles Lew said: "We are pleased to have DRA involved in the construction of the Yangibana processing plant. Their knowledge and experience in developing successful minerals processing projects makes them the ideal candidate to manage the construction of our project. The award of the EPCM contract moves the Yangibana Rare Earths Project firmly into development phase to commence project execution and progress to production of our mixed rare earth carbonate by 2022."

Cadence CEO Kiran Morzaria commented: "The appointment of DRA Pacific represents a key step for Yangibana. Not only is it key to the project funding going forward, the EPCM contract terms include a comprehensive performance guarantee linked to ore throughput. Today's announcement provides further validation for our investment strategy into the Yangibana joint venture with Hastings."

- Ends -

For further information:

Cadence Minerals plc

+44 (0) 207 440 0647

Andrew Suckling

Kiran Morzaria

WH Ireland Limited (NOMAD & Broker)

+44 (0) 207 220 1666

James Joyce

James Sinclair-Ford

Novum Securities Limited (Joint Broker)

+44 (0) 207 399 9400

Jon Belliss

 

 

Qualified Person

Kiran Morzaria B.Eng. (ACSM), MBA, has reviewed and approved the information contained in this announcement. Kiran holds a Bachelor of Engineering (Industrial Geology) from the Camborne School of Mines and an MBA (Finance) from CASS Business School.

 

Forward-Looking Statements:

Certain statements in this announcement are or may be deemed to be forward-looking statements. Forward-looking statements are identified by their use of terms and phrases such as ''believe'' ''could'' "should" ''envisage'' ''estimate'' ''intend'' ''may'' ''plan'' ''will'' or the negative of those variations or comparable expressions including references to assumptions. These forward-looking statements are not based on historical facts but rather on the Directors' current expectations and assumptions regarding the Company's future growth results of operations performance future capital and other expenditures (including the amount. nature and sources of funding thereof) competitive advantages business prospects and opportunities. Such forward-looking statements reflect the Directors' current beliefs and assumptions and are based on information currently available to the Directors. Many factors could cause actual results to differ materially from the results discussed in the forward-looking statements including risks associated with vulnerability to general economic and business conditions competition environmental and other regulatory changes actions by governmental authorities the availability of capital markets reliance on key personnel uninsured and underinsured losses and other factors many of which are beyond the control of the Company. Although any forward-looking statements contained in this announcement are based upon what the Directors believe to be reasonable assumptions. The Company cannot assure investors that actual results will be consistent with such forward-looking statements.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
CNTPGGUUUUPBGUG
Date   Source Headline
15th Mar 20163:58 pmRNSEMH Interim Financial Report
4th Mar 20167:00 amRNSREM increases stake in the Cinovec Lithium Project
3rd Mar 20167:25 amRNSSonora Lithium Project - Pre-Feasibility Study
1st Mar 201610:59 amRNSBacanora Minerals Interim Results Released
29th Feb 20164:40 pmRNSSecond Price Monitoring Extn
29th Feb 20164:35 pmRNSPrice Monitoring Extension
29th Feb 20167:00 amRNSFundraising
18th Feb 20168:20 amRNSEuropean Metals - Drill Program Update
11th Feb 20167:58 amRNSCinovec Lithium Project - Update
29th Jan 201610:06 amRNSEuropean Metals - Quarterly Activities Release
15th Jan 20163:32 pmRNSCinovec Lithium Project - Drilling Update
6th Jan 20167:00 amRNSFiling of Technical Report
4th Jan 20164:40 pmRNSSecond Price Monitoring Extn
4th Jan 20164:35 pmRNSPrice Monitoring Extension
21st Dec 20157:00 amRNSDirectorate Change
17th Dec 20157:43 amRNSADRs Admitted for Trading
10th Dec 20157:43 amRNSEMH Admission to AIM
9th Dec 20157:00 amRNSLaunch of American Depository Receipt Program
8th Dec 20152:00 pmRNSSonora Lithium Project - Offtaker Update
23rd Nov 20157:00 amRNSSignificant Resource Increase at Sonora Project
17th Nov 201510:36 amRNSCinovec Lithium Project - Drilling Update
16th Nov 20157:38 amRNSREM Maintains Stake in Bacanora Placing
12th Nov 20152:59 pmRNSEuropean Metal Holdings - AIM Listing Update
10th Nov 20152:04 pmRNSYangibana Update
28th Oct 20157:00 amRNSAdmission to the ISDX Growth Market
20th Oct 20158:52 amRNSCinovec Lithium Project - Update
15th Oct 20155:00 pmRNSApplication for Admission to ISDX
15th Oct 20154:41 pmRNSREM increases interest in European Lithium Project
7th Oct 20157:00 amRNSHolding(s) in Company
6th Oct 20154:33 pmRNSCinovec Lithium Project, Drilling Update
6th Oct 20152:24 pmRNSYangibana REE Project Update
2nd Oct 201512:39 pmRNSAgreement with YAGM
21st Sep 20157:00 amRNSInterim Results
17th Sep 201511:06 amRNSHolding(s) in Company
17th Sep 20159:15 amRNSREM increases strategic holding in Bacanora
2nd Sep 20157:00 amRNSREM increases strategic holding in Bacanora
1st Sep 20157:03 amRNSDrilling Results & Accelerated Drilling Programme
28th Aug 20154:40 pmRNSSecond Price Monitoring Extn
28th Aug 20154:35 pmRNSPrice Monitoring Extension
28th Aug 20157:00 amRNSSonora Project Signs Lithium Supply Contract
25th Aug 20158:48 amRNSHolding(s) in Company
19th Aug 201511:58 amRNSYangibana REE Project Update
12th Aug 201511:55 amRNSUpdate on Yangibana Rare Earths Element Project
31st Jul 20157:00 amRNSAppointment of Director
24th Jul 201512:00 pmRNSResult of AGM
17th Jul 20152:00 pmRNSHolding(s) in Company
8th Jul 20157:00 amRNSREM increases interest in European Lithium Project
8th Jul 20157:00 amRNSSonora Lithium Project Update
1st Jul 201510:30 amRNSNotice of AGM and Posting of Results
1st Jul 201510:23 amRNSREM increases interest in European Lithium Project

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.