Intraday Jubilee Metals Share Chart

Update on ConRoast

21 Jul 2010 07:00

RNS Number : 6151P
Jubilee Platinum PLC
21 July 2010
 



AIM: JLP

JSE: JBL

Registration number: 4459850

ISIN: GB0031852162

 

21 July 2010

 

JUBILEE PLATINUM PLC

("Jubilee" or "the company")

 

Update on ConRoast

 

Jubilee is pleased to provide an update regarding progress of the planned development of its first fully commercial ConRoast DC arc furnace. The Company is also pleased to provide interim results of pilot scale refining trials using the Chemical Vapour Metal Refining Inc. ("CVMR®") (carbonylation) process for the recovery of platinum group metals ("PGM") and base metals (nickel, iron and cobalt) from ConRoast iron-rich alloy.

 

Highlights

 

 

§ Engineering and design study fast-tracked for the installation of the Company's first commercial ConRoast DC arc furnace utilising existing infrastructure and equipment at the newly acquired Middleburg processing facility;

 

§ Four-phase feasibility study ("FS") commissioned for the refining of metals in ConRoast PGM alloy using the CVMR® process;

 

§ Phase 1 - pilot scale CVMR® process trials achieved exceptional results in the extraction of base metals: 99.5% of nickel and 95.6% of iron from ConRoast alloy as separate potentially premium grade nickel and iron products and a high grade PGM residue; and

 

§ Phase 2 commenced comprising additional refining testwork and preparation of feasibility study documents.

 

 

 

Colin Bird CEO of Jubilee Platinum commented, "We are pleased to report positive progress with the ConRoast furnace installation programme and the exceptional interim pilot refining results from testwork on ConRoast alloy. The interim results have demonstrated the applicability of a relatively simple but proven and potentially low energy route for refining of ConRoast alloy to produce separate high value PGM and potentially premium priced nickel and iron products. We look forward to increasing the momentum for the development of ConRoast and Jubilee's total capability."

 

Conversion AC to First DC Arc Furnace

The company has commissioned Environmental & Process Solutions (Pty) Ltd, to undertake an engineering and design study ("EDS"), in order to fast track the commissioning of the new 5MVA ConRoast DC ARC furnace. The EDS will maximise the use of existing infrastructure at the newly acquired Middleburg site.

 

The EDS will require 4 weeks to complete. A further estimated 6 weeks is planned for concluding a procurement and management contract to install the furnace and associated equipment, the completion and commissioning of which is expected in early 2011.

 

The company has secured all required funding for this first fully commercial ConRoast DC arc furnace.

 

Refining Testwork

 

The company commissioned CVMR® of Toronto, Canada earlier this year to undertake a four-phase FS for the extraction and refining of metals in ConRoast alloy utilising the CVMR® process, which in essence extracts nickel, iron, and cobalt as gaseous metal carbonyls (carbonylation) using carbon monoxide gas (see below for description of process).

 

Phase 1, comprising 3 pilot-scale campaigns has been completed on samples of ConRoast alloy, which was produced during ConRoast R&D trials at Mintek in 2007.

 

Excellent results have been obtained with extraction yields (carbonylation) of 99.5% for nickel and 95.6% for iron. After extraction, followed by condensation and fractional distillation, at low pressure, of the nickel-iron carbonyls, the separate distillates were decomposed to produce high purity nickel and iron powders. A PGM-rich copper residue, unaffected by carbonlylation, remained after the extraction stage of the base metals. Preliminary calculations indicate that nickel powder with levels of iron below 50ppm and iron powders with nickel levels below 100ppm are achievable and could command potentially premium metal prices. The interim report noted that the low-pressure distillation system should have positive implications for both capital and operating costs of the process.

 

These results warranted progress to phase 2, which has now commenced. This comprises additional testwork to address cobalt recovery and residual iron sulphide contamination in the PGM residue product, and the preparation of feasibility study documentation.

 

 

CVMR® Process

 

The CVMR® process, based on the Mond (carbonyl) process, makes use of the fact that carbon monoxide gas reacts readily (carbonylation) with nickel, iron and cobalt under mild conditions to give gaseous metal carbonyls. The carbonyl gases are then condensed, the condensates separated by fractional distillation and the distillates decomposed to produce separate high purity metals and carbon monoxide gas for reuse. PGMs and copper are unaffected by the carbonylation. Thus this process is eminently applicable to the refining of the ConRoast iron-rich nickel-copper-PGM-bearing alloy.

 

 

Colin Bird/Leon Coetzer

Jubilee Platinum plc

Tel + 27 (0) 11 235 3280 +44 (0) 20 7584 2155

 

Andrew Sarosi

Jubilee Platinum plc

Tel +44 (0) 1752 221937

 

Matthew Robinson/Edward Frisby

finnCap Ltd

Tel +44 (0) 20 7600 1658

 

Sharon Owens/Leonard Eiser

Sasfin Capital 

Tel +27 (0) 11 809 7500

 

Michael Kinirons/Nick Rome

Bishopsgate Communications Ltd

Tel +44 (0) 20 7562 3350

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCPGUUAMUPUGUU
Date   Source Headline
9th Oct 20098:41 amRNSNotification of Major Interests in Shares
7th Oct 20094:30 pmRNSResults of General Meeting
30th Sep 20091:00 pmRNSIssue Of Ordinary Shares For Cash
29th Sep 20091:49 pmRNSPreliminary Audited Results and Notice of AGM
25th Sep 20095:00 pmRNSTrading Statement
22nd Sep 200912:00 pmRNSIssue of Equity
14th Sep 200912:31 pmRNSPosting of Circular
14th Sep 200912:30 pmRNSUpdate on offer by Jubilee Platinum
14th Sep 200912:30 pmRNSOffer for Braemore Resources plc update
7th Aug 200911:00 amRNS?13.25m placing for cash
6th Aug 200912:00 pmRNSAdditional Listing
31st Jul 200912:00 pmRNSPreference Share Subscription
21st Jul 20094:00 pmRNSAdditional Listing
15th Jul 20093:00 pmRNSIssue of shares
3rd Jul 200910:30 amRNSOffer by Jubilee Platinum plc
3rd Jul 200910:30 amRNSProposed Acquisition of Braemore Resources Plc
3rd Jul 200910:30 amRNSOffer for Braemore
29th Jun 20094:30 pmRNSCorrection - Cautionary announcement
29th Jun 20093:00 pmRNSCautionary announcement
4th Jun 200910:30 amRNSTjate resource statement
2nd Jun 200911:02 amRNSResults of General Meeting
26th May 20097:00 amRNSIssue of Equity
21st May 20097:00 amRNSDirectors Dealings
19th May 20099:30 amRNSProduction and Smelting Agreement
19th May 20099:30 amRNSProduction and smelting agreement
6th May 200911:00 amRNSDeferred Share Agreement
23rd Apr 20092:00 pmRNSIssue of Equity
26th Mar 20094:04 pmRNSInterim Results
9th Mar 20099:00 amRNSChange of Advisers
18th Feb 20099:00 amRNSCompletion of Drilling Programme at Tjate
6th Feb 20092:30 pmRNSMadagascar update
26th Nov 200811:30 amRNSResult of AGM
4th Nov 200811:30 amRNSJoint Venture
22nd Oct 20083:00 pmRNSDirectors Dealings
8th Oct 20082:15 pmRNSDirectors Dealings
8th Oct 20081:30 pmRNSDirectors Dealings
11th Aug 20087:00 amRNSDrilling Update at Tjate
26th Jun 20087:00 amRNSDirectors Dealings
25th Jun 20083:00 pmRNSDirectors Dealings
19th Jun 20088:30 amRNSIncreases interest in the Tja
9th Jun 20087:00 amRNSDrilling Update at Tjate
3rd Jun 200812:30 pmRNSDirectors Dealings
2nd Jun 200810:30 amRNSDirectors Dealings
16th Apr 20087:00 amRNSIssue of Shares
8th Apr 20087:00 amRNSMadagascar Drilling Update
2nd Apr 20087:01 amRNSShare Acquisition in NewPlats
25th Mar 20087:01 amRNSShare Acquisition in NewPlats
13th Mar 20087:00 amRNSInterim Results
5th Mar 20087:00 amRNSDrilling Update - Madagascar
21st Feb 20087:00 amRNSAmbodilafa Drilling Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.