Operations Update

9 Mar 2011 10:30

RNS Number : 6088C
Jubilee Platinum PLC
09 March 2011
 



 

AIM: JLP

JSE: JBL

Registration number: 4459850

ISIN GB0031852162

Jubilee Platinum PLC

("Jubilee" or the "Company")

Operations Update

 

Jubilee Platinum, the AIM and JSE quoted mine to metal specialist, is pleased to provide the following operations update.

 

HIGHLIGHTS

 

·; First stage infill drilling programme for the Tjate project completed with exceptional results achieved, final modelling of data in progress;

 

·; Drill data confirm continuity of Merensky and UG2 Reefs, with significantly improved grade and thickness for the UG2 reef;

 

·; Application for a Mining Right for Tjate initiated on these encouraging drilling results;

 

·; Delivery times for long-lead items successfully negotiated to ensure new ConRoast 5MW DC Arc furnace remains on track for Q4 2011;

 

·; Numerous small-scale near-term mining opportunities are being presented to Jubilee due to its ConRoast smelting capability to treat chrome bearing platinum concentrates;

 

·; Existing ferroalloys processing infrastructure at Middelburg fully utilised and contributing to short term cash flows;

 

·; New ferroalloy 5MW AC Arc furnace on target for commissioning in Q2 this year and capacity fully contracted; and

 

·; Drilling to commence shortly in Madagascar.

 

 

Leon Coetzer, CEO of Jubilee Platinum commented: "It is important to emphasise that we are developing a company capable of achieving a Mine to Metal business strategy. 

 

"The platinum ConRoast project is on track and will be operational by year end. The Tjate project's exceptional drill results again confirm it as a world-class asset and continue to present an excellent opportunity to develop a world-class platinum mine. I look forward to updating shareholders with regard to the Northam discussions and the Sylvania joint project as and when they conclude. The ferroalloy processing division is operating well and generating short term cash flow for the company. Its contribution to the overall business plan will increase with the commissioning of the first 5MW ferroalloy furnace in May this year.

 

"We continue to assess numerous small-scale near term mining opportunities, which are being presented to the Companydue to our ability to process platinum concentrates containing high chrome values.  These opportunities are in-line with our focus on building our Mine to Metal business strategy." 

 

Corporate developments

 

Discussions to establish a joint venture to evaluate the construction of a new DC Arc furnace facility using ConRoast technology to treat a portion of Northam Platinum's platinum group metal ("PGM") concentrate have advanced under the current Memorandum of Understanding, details of which, when concluded, will be released to the market.

 

The joint project with Sylvania Resources has progressed on schedule with all roasting and smelting trials concluded as specified within the scoping study. The PGM-rich iron alloy from these trials has been couriered to Canada for final CVMR refining trials. The results from these trials will form the basis of the scoping study.

 

Numerous small-scale near term, mining opportunities are being presented to Jubilee due to its ability to process platinum concentrates containing high chrome values. Jubilee is reviewing these opportunities to enable processing of own platinum concentrates through its Middelburg facility. Processing of own platinum concentrates significantly enhances the business model for Jubilee. Further detail on these opportunities will be released to the market on conclusion of the current review.

 

Middelburg Processing Facility

 

Jubilee has made significant progress in the implementation of its mine to metal business strategy. The Company is implementing two distinct business strategies at its Middelburg processing facility:

 

a platinum concentrate processing division operating under Braemore Platinum Smelters (Pty) Ltd, a wholly owned subsidiary of Jubilee; and

 

a ferroalloy processing division, operating under the company RST Metals (Pty) Ltd, a wholly owned subsidiary of Jubilee Smelting and Refining (Pty) Ltd (formerly Thos Begbie Holdings).

 

Platinum Concentrate Processing Division

 

Pyromet Tenova has been formally appointed to support Jubilee with the execution of the 5MW DC Arc Furnace for the ConRoast platinum project. Pyromet Tenova is an internationally recognised company specialising in the execution of pyrometallurgical (smelter) projects. The appointment falls in line with Jubilee's strategy of outsourcing specific technical roles to established industry leaders to enhance the Company's ability to execute the projects to set deliverables.

 

Improved delivery times for key items on the critical path of the ConRoast project have been successfully concluded to ensure the project remains on target and orders will be placed on receipt of written confirmation of these delivery times. Jubilee has concluded the submittal of all relevant environmental applications to ensure the project remains on track.

 

This 5MW ConRoast furnace forms part of the 2nd phase of the Middelburg facility expansion and is scheduled for completion towards the end of 2011. This facility continues to enjoy strong support from the industry.

 

Ferroalloy Processing Division

 

Jubilee has fully contracted the existing smelting capacity at Middelburg utilising the existing processing infrastructure - resulting in increased short-term cash flow. As such it is able to process various ferroalloys including ferronickel and ferrosilicon profitably while continuing with the expansion of the processing facility to include the ConRoast processing plant.

 

The current strong demand for the processing of ferroalloys, in particular ferronickel motivated the decision to construct a new 5MW ferroalloy AC Arc furnace at Middelburg. This builds upon the existing two 2.5MW AC Arc furnaces that are currently operational on site.

 

This 5 MW furnace will form part of the first phase of expansion at the Middelburg ferroalloy smelting facility with commissioning targeted in May 2011. This furnace will be an AC Arc furnace to capitalise on existing electrical infrastructure including available transformers, thereby avoiding the long delivery period associated with a DC Arc transformer.

  

Tjate Project

 

The Tjate project has completed its stage one infill drilling programme with results confirming the previous Merensky reef grades and showing an improvement in 4E (platinum palladium rhodium and gold) grade and reef thickness over that previously obtained for its UG2 reef.

 

During February 2011 the Company completed its first stage 9-borehole infill-drilling programme. The objective of this programme was to confirm the continuity of the Merensky and UG2 reef structures and to establish the drill spacing necessary to complete stage two of the drill programme so as to upgrade the resource estimate category. Five of the boreholes in this programme that were previously drilled to Merensky Reef were extended to UG2.

 

The results of this drilling are shown in the tables below with the weighted average results of previous drilling and all drilling to date.

 

Merensky Reef Infill Drilling Results

Merensky Best Mine Cut Average (80 cm cut-off)

Borehole

Cut Type

Ave 4E g/t

Ave Cu %

Ave Ni %

Ave Width m

DT43

Typical

3.51

0.14

0.24

1.06

DT44

Typical

4.79

0.16

0.27

0.83

DT45

Typical

4.36

0.09

0.15

2.25

DT46

Typical

3.63

0.13

0.21

1.05

DT47

Faulted/Disturbed

3.85

0.004

0.008

1.03

DT48

Typical

4.57

0.21

0.29

0.98

DT49

Typical

4.11

0.15

0.21

1.07

DT50

Typical

5.03

0.15

0.22

1.42

DT51

Typical

3.17

0.11

0.19

1.07

Weighted average Infill drilling

4.23

0.13

0.20

1.20

Previous drilling

4.24

0.11

0.19

1.15

All drilling to date

4.24

0.11

0.19

1.16

 

UG2 Infill Drilling Results

UG2 Cut Averages (Chromitite Only)

Borehole

Reef Type

Ave 4E g/t

Ave Cu %

Ave Ni %

Ave Width m

DT43

Normal

8.40

0.05

0.08

0.89

DT44

Normal

8.01

0.059

0.073

0.69

DT45

Normal

9.30

0.030

0.049

0.67

DT46

Normal

8.28

0.047

0.056

0.73

DT47

Normal

6.72

0.049

0.073

0.47

DT48

Normal

8.92

0.038

0.069

0.63

DT49

Normal

6.94

0.006

0.024

0.80

DT50

Normal

11.26

0.07

0.10

0.97

DT51

Normal

11.93

0.02

0.05

1.25

Weighted average Infill drilling

9.26

0.039

0.064

0.79

Previous drilling

8.35

0.045

0.078

0.60

All drilling to date

8.69

0.043

0.073

0.66

 

The average infill drilling Merensky results confirmed continuity of both the Merensky and the UG2 reefs. The Merensky results match the previous drilling results while the infill UG2 results show both improved average 4E grade (by approximately 0.9g/t 4E) and reef thickness over previous results.

The Company is encouraged by these results to date and has initiated preparation of an application to the Department of Mineral Resources ("DMR") for a Mining Right under the Mineral and Petroleum Resources Development Act 2002 for Tjate.

 

Independent mining industry consultant Snowden is currently modelling the data. These results and their impact on current resource estimate and drill spacing recommendation for stage two are expected to be reported shortly.

 

Phase two of Tjate's three-phase feasibility study is progressing to schedule and completion is targeted for end Q2.

 

Madagascar

 

The Company is shortly to commence exploratory drilling on its Ambodilafa concession located centrally in south-east Madagascar.

 

Andrew Sarosi, Director of Jubilee Platinum, who holds a B.Sc. Metallurgy and M.Sc. Engineering, University of Witwatersrand and is a member of The Institute of Materials, Minerals and Mining, is a 'qualified person' as defined under the AIM Rules for Companies and a competent person under the reporting standards. The technical parts of this announcement have been prepared under Andrew Sarosi's supervision and he has approved the release of this announcement.

 

 

Contacts

 

Colin Bird/Leon Coetzer

Jubilee Platinum plc

Tel +44 (0) 20 7584 2155 / Tel +27 (0)11 465 1913

 

Andrew Sarosi

Jubilee Platinum plc

Tel +44 (0) 1752 221937

Matthew Robinson/Rose Herbert - corporate finance

Joanna Weaving - corporate broking

finnCap Ltd

Tel +44 (0) 20 7600 1658

 

Leonard Eiser /Sharon Owens

Sasfin Capital

Tel +27 (0) 11 809 7500

 

Michael Kinirons/Nick Rome

Bishopsgate Communications Ltd

Tel +44 (0) 20 7562 3350

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCGMGGFGLDGMZM
Date   Source Headline
4th Jun 20267:00 amRNSRoan Concentrator Update
29th May 20267:00 amRNSNotice of General Meeting
28th May 20262:10 pmRNSStrategic Investment to Support Copper Growth
6th May 20267:00 amRNSOperational and Production Update 9m FY2026
29th Apr 20267:00 amRNSCapital Reduction Court Approval
20th Apr 20264:05 pmRNSHolding(s) in Company
8th Apr 20262:57 pmRNSResults of GM & Proposed Capital Reduction
31st Mar 20267:01 amRNSImplementation of Mine Plan at Molefe
31st Mar 20267:00 amRNSFinancial report for 6 months to end-December 2025
25th Mar 20267:05 amRNSMolefe Mine Phase 1 Drilling Results
24th Mar 20267:00 amRNSMolefe Mine Phase 1 Drilling Results delayed
23rd Mar 202610:05 amRNSReduction of Share Premium Account & Notice of GM
23rd Mar 20267:00 amRNSReduction of Share Premium Account & Notice of GM
12th Mar 20267:00 amRNSHigh-Grade Feed Secured & Large Waste Rock Update
12th Mar 20267:00 amRNSHigh-Grade Feed Secured & Large Waste Rock Update
27th Feb 20267:00 amRNSShareholder update and Dealing in securities
19th Feb 20267:00 amRNSOperational and Projects update H1 FY2026
23rd Jan 20267:00 amRNSChanges to the Board
14th Jan 20262:19 pmRNSResults of Annual General Meeting
6th Jan 20267:00 amRNSReceipt of US$10 million in funds from SA sale
2nd Jan 20267:00 amRNSClosing of Sale of South African Operations
2nd Jan 20267:00 amRNSClosing of Sale of South African Operations
17th Dec 20257:00 amRNSAudited Results for FY2025 & Notice of AGM
28th Nov 20257:00 amRNSMolefe Mine Co-Operation and Development Agreement
21st Nov 20257:00 amRNSOperational Update Zambia Q1 FY2026
17th Nov 20257:00 amRNSCompetition Tribunal Approval
17th Oct 20257:00 amRNSOperational Update South Africa Q1 FY2026
6th Oct 20256:06 pmRNSTR-1: notification of major holdings
6th Oct 20257:00 amRNSZambia Copper Strategy and SA Disposal Update
8th Sep 20257:00 amRNSDealing in securities
28th Aug 20252:05 pmRNSResults of General Meeting
12th Aug 20257:00 amRNSPosting of Circular & Notice of General Meeting
6th Aug 20257:00 amRNSZambia Copper and SA Business Proposed Sale Update
21st Jul 20257:00 amRNSQ4 Operational Update - South Africa
10th Jul 20257:00 amRNSChange of Broker and Proposed Disposal Update
19th Jun 20257:00 amRNSDirectorate Change
5th Jun 20257:00 amRNSProposed Disposal of Chrome and PGM Operations
28th May 20257:02 amRNSZambia Projects Update & Issue of equity
30th Apr 20257:40 amRNSZambia Progress Update
16th Apr 20257:00 amRNSOperational Update Q3 FY2025
14th Apr 20257:00 amRNSDirectorate Change
9th Apr 20257:00 amRNSTransaction on Surplus PGM Feed Material
3rd Apr 20257:00 amRNSJubilee Transaction on Large Waste Project
31st Mar 20257:00 amRNSInterim Financial Report 6 Months to December 2024
14th Feb 20257:00 amRNSRoan Commences High Grade Copper Production
6th Feb 20257:00 amRNSZambia Projects Update
21st Jan 20257:00 amRNSAdditional power supply secured for Roan re-start
13th Jan 20257:00 amRNSOperational Update H1 FY2025
24th Dec 20247:00 amRNSHolding(s) in Company
16th Dec 20247:00 amRNSZambia Operations Update and Exercise of Options

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.