GreenRoc Accelerates their World Class Project to Production as Early as 2028. Watch the full video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksJubilee Metals Regulatory News (JLP)

Share Price Information for Jubilee Metals (JLP)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 7.80
Bid: 7.60
Ask: 8.00
Change: 0.05 (0.65%)
Spread: 0.40 (5.263%)
Open: 7.75
High: 7.80
Low: 7.76
Prev. Close: 7.75
JLP Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Major Discovery in Madagascar

5 Sep 2005 07:01

Jubilee Platinum PLC05 September 2005 5 September 2005 AIM: JLP JUBILEE PLATINUM PLC ("Jubilee" or "the Company") Jubilee Makes a Major Discovery in Madagascar Drilling Intersects 70 metres of Nickel-Copper-Platinum-Palladium Mineralisation Jubilee is pleased to announce the results of its first borehole LAV1 drilled onthe Lavatrafo property (Londokomanana Project) in Madagascar. The LondokomananaProject is located approximately 150 kilometres north of the Madagascan capitalAntananarivo. Highlights • Drilling intersects a 70 metre-wide multi-metal (nickel-copper-platinum-palladium) formation at shallow depth (37metres) • Intersection over the entire width (from 38metres to 108metres) grades 0.23% nickel (Ni); 0.11% copper (Cu) and 1.05g/t 3E (platinum (Pt), palladium (Pd) and gold (Au)) (The full results are appended below) • Pt to Pd ratio is 1 to 1 • Copper equivalent of the total intersection is 1.56% at current metal prices as of 2nd September 2005 • In-situ value of total intersection is US$56/t rock at those metal prices Intersection includes • 6.2 metres (from 55.6m to 61.8m) grading 2.47 g/t 3E and From metres To Interval % Cu In-situ value $/t (at metres metres % Ni % Cu g/t 3E equiv. current prices) 72.8 108.4 35.7 0.31 0.19 0.99 1.9 69 89.4 108.4 19.1 0.34 0.20 1.05 2.1 74 75.3 83.5 8.3 0.32 0.23 1.15 2.1 75 102.3 108.4 6.1 0.47 0.24 1.02 2.6 95 • Wide intercept and shallow depth ideal for open pit mining • Intersection proves recently established geophysics model • Potential for large regional development since the combination of geophysics and sampling in the area suggests the system may extend over 35 kilometres. An industry accepted model for a bulk mining operation producing not less than 8million tonnes per year is believed to be approximately US$20/tonne productioncost made up of approximately US$11 per tonne as direct operating cost and US$9per tonne for capital recovery. Set Point Laboratories (ISO 17025 Accredited and SANAS Accredited to 223) inJohannesburg, South Africa carried out the analyses of the drill core samples. Colin Bird, CEO of Jubilee, said "The size and scope of this discovery bears allthe fundamentals required for a world-class resource combining good grades witha suite of metals sought after in the market. The thickness of the intersectionprovides the potential for large-scale mining and the confirmation of ourevolving model from the recent geophysics programme, suggests that Londokomananacould develop into a regional, as opposed to a local situation, with some 35kilometres of ground, some of which has been tested with similar geophysics.Further drilling, some 180 metres south and along strike, is confirmingcontinuity of the formation. Results will be released as soon as these becomeavailable. Hennie Blignault, Consulting Geologist to Jubilee said "This discovery outsidethe South African Bushveld Complex is extremely significant in world terms." Mr. Blignault is a former group geologist for Gold Fields of South Africa andwas a lecturer and research associate at the University of the Orange Free Stateand the University of Cape Town. For further information please contact: Colin Bird Cathy Malins / Annabel LeatherJubilee Platinum plc Parkgreen Communications LtdTel: 07768 397 627 Tel +44 20 7493 3713 Appendix 1 Londokomanana Project - Drill results for Borehole LAV1 Grade Sample From To Interval Au Pt Pd Ni Cu 3E no. m m m ppb ppb ppb ppm ppm g/t S7180 36.50 37 0.50
Date   Source Headline
14th Nov 20191:15 pmRNSEquity Placing to Support Targeted Growth
14th Nov 20197:36 amRNSResults for year ended 30 June 2019 & AGM Notice
5th Nov 20198:30 amRNSAcquisition of all chrome rights at Hernic
24th Oct 20193:11 pmRNSAcquisition at Hernic: Transforming Operations
24th Sep 20197:00 amRNSNew Corporate Presentation
17th Sep 20197:00 amRNSKabwe Multi-Metal Processing Project Update
5th Sep 20198:00 amRNSWindsor PGM Project - Full Operational Status
23rd Aug 201910:15 amRNSCompletion of Acquisition in Kabwe & Joint Broker
5th Aug 20199:00 amRNSSix Monthly Operations Update
11th Jul 20197:00 amRNSProjects Update
5th Jun 20191:45 pmRNSProjects Update
9th May 20197:00 amRNSQuarterly Operations Update Q1 2019
3rd May 201912:30 pmRNSTR-1: notification of major holdings
23rd Apr 20197:00 amRNSPrice Monitoring Extension
5th Apr 20192:05 pmRNSSecond Price Monitoring Extn
5th Apr 20192:00 pmRNSPrice Monitoring Extension
4th Apr 20194:41 pmRNSTR-1: notification of major holdings
3rd Apr 20192:26 pmRNSTR-1 NOTIFICATION OF CHANGE IN MAJOR HOLDINGS
2nd Apr 20194:40 pmRNSSecond Price Monitoring Extn
2nd Apr 20194:35 pmRNSPrice Monitoring Extension
29th Mar 20191:35 pmRNSVoting Rights and Capital
29th Mar 201910:38 amRNSTR-1: Form for notification of major holdings
28th Mar 20197:00 amRNSUnaudited interim results
21st Mar 201910:58 amRNSFunding secured for Kabwe Project and Acquisition
20th Mar 20194:18 pmRNSGeneral Operations and Projects Update
17th Jan 20198:30 amRNSQuarterly Operations Update Q4 2018
18th Dec 201812:38 pmRNSTR-1: Notification of major holdings
18th Dec 20188:30 amRNSTR-1: notification of major holdings
17th Dec 20187:00 amRNSCommissioning of fine chrome operation commences
10th Dec 20187:15 amRNSJubilee acquires major Chrome Processing Operation
6th Dec 20181:00 pmRNSResults of AGM
4th Dec 20187:02 amRNSSecond Price Monitoring Extn
4th Dec 20187:01 amRNSPrice Monitoring Extension
3rd Dec 20184:40 pmRNSSecond Price Monitoring Extn
3rd Dec 20184:35 pmRNSPrice Monitoring Extension
28th Nov 20181:30 pmRNSJubilee Live Interactive Webcast
14th Nov 20182:40 pmRNSAudited results for the year ended 30 June 2018
5th Nov 20188:00 amRNSMarket Update
17th Oct 20189:30 amRNSQuarterly Operations Update Q3 2018
3rd Aug 20187:00 amRNSClarification on BMR Group PLC & the Kabwe Project
19th Jul 20187:00 amRNSQuarterly Operations Update Q2 2018
2nd Jul 20187:00 amRNSKabwe Project Status Update
21st Jun 20183:00 pmRNSBoard Changes
12th Jun 20182:02 pmRNSTR-1: notification of major holdings
11th Jun 20188:30 amRNSPlacement of BMR Shares fully executed
7th Jun 20187:00 amRNSProjects Status Update
4th Jun 20189:15 amRNSKabwe and BMR Group PLC ("BMR") Update
2nd May 20187:00 amRNSJubilee Executes Kabwe Project Agreements
18th Apr 20187:00 amRNSJubilee Executes Processing Agreement
17th Apr 20187:00 amRNSQuarterly Operations Update & Tjate Share Issue

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.