The latest Investing Matters Podcast episode with London Stock Exchange Group's Chris Mayo has just been released. Listen here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksJubilee Metals Regulatory News (JLP)

Share Price Information for Jubilee Metals (JLP)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 7.80
Bid: 7.60
Ask: 8.00
Change: -0.05 (-0.65%)
Spread: 0.40 (5.263%)
Open: 7.75
High: 7.80
Low: 7.70
Prev. Close: 7.75
JLP Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Major Discovery in Madagascar

5 Sep 2005 07:01

Jubilee Platinum PLC05 September 2005 5 September 2005 AIM: JLP JUBILEE PLATINUM PLC ("Jubilee" or "the Company") Jubilee Makes a Major Discovery in Madagascar Drilling Intersects 70 metres of Nickel-Copper-Platinum-Palladium Mineralisation Jubilee is pleased to announce the results of its first borehole LAV1 drilled onthe Lavatrafo property (Londokomanana Project) in Madagascar. The LondokomananaProject is located approximately 150 kilometres north of the Madagascan capitalAntananarivo. Highlights • Drilling intersects a 70 metre-wide multi-metal (nickel-copper-platinum-palladium) formation at shallow depth (37metres) • Intersection over the entire width (from 38metres to 108metres) grades 0.23% nickel (Ni); 0.11% copper (Cu) and 1.05g/t 3E (platinum (Pt), palladium (Pd) and gold (Au)) (The full results are appended below) • Pt to Pd ratio is 1 to 1 • Copper equivalent of the total intersection is 1.56% at current metal prices as of 2nd September 2005 • In-situ value of total intersection is US$56/t rock at those metal prices Intersection includes • 6.2 metres (from 55.6m to 61.8m) grading 2.47 g/t 3E and From metres To Interval % Cu In-situ value $/t (at metres metres % Ni % Cu g/t 3E equiv. current prices) 72.8 108.4 35.7 0.31 0.19 0.99 1.9 69 89.4 108.4 19.1 0.34 0.20 1.05 2.1 74 75.3 83.5 8.3 0.32 0.23 1.15 2.1 75 102.3 108.4 6.1 0.47 0.24 1.02 2.6 95 • Wide intercept and shallow depth ideal for open pit mining • Intersection proves recently established geophysics model • Potential for large regional development since the combination of geophysics and sampling in the area suggests the system may extend over 35 kilometres. An industry accepted model for a bulk mining operation producing not less than 8million tonnes per year is believed to be approximately US$20/tonne productioncost made up of approximately US$11 per tonne as direct operating cost and US$9per tonne for capital recovery. Set Point Laboratories (ISO 17025 Accredited and SANAS Accredited to 223) inJohannesburg, South Africa carried out the analyses of the drill core samples. Colin Bird, CEO of Jubilee, said "The size and scope of this discovery bears allthe fundamentals required for a world-class resource combining good grades witha suite of metals sought after in the market. The thickness of the intersectionprovides the potential for large-scale mining and the confirmation of ourevolving model from the recent geophysics programme, suggests that Londokomananacould develop into a regional, as opposed to a local situation, with some 35kilometres of ground, some of which has been tested with similar geophysics.Further drilling, some 180 metres south and along strike, is confirmingcontinuity of the formation. Results will be released as soon as these becomeavailable. Hennie Blignault, Consulting Geologist to Jubilee said "This discovery outsidethe South African Bushveld Complex is extremely significant in world terms." Mr. Blignault is a former group geologist for Gold Fields of South Africa andwas a lecturer and research associate at the University of the Orange Free Stateand the University of Cape Town. For further information please contact: Colin Bird Cathy Malins / Annabel LeatherJubilee Platinum plc Parkgreen Communications LtdTel: 07768 397 627 Tel +44 20 7493 3713 Appendix 1 Londokomanana Project - Drill results for Borehole LAV1 Grade Sample From To Interval Au Pt Pd Ni Cu 3E no. m m m ppb ppb ppb ppm ppm g/t S7180 36.50 37 0.50
Date   Source Headline
5th Apr 20187:00 amRNSKabwe Mining Licence Reinstated
29th Mar 201812:00 pmRNSFurther Kabwe Project Update
21st Mar 20187:00 amRNSAppointment of Broker
19th Mar 20181:45 pmRNSJubilee Live Interactive Webcast
7th Mar 20187:00 amRNSUNAUDITED INTERIM RESULTS 31 DECEMBER 2017
2nd Mar 201811:45 amRNSStatement regarding Broker
1st Mar 20187:00 amRNSFurther Kabwe Project Update
23rd Feb 20183:35 pmRNSFurther Kabwe Project Update
7th Feb 20185:00 pmRNSFurther Update re Kabwe project
7th Feb 20183:20 pmRNSUpdate on Kabwe project
6th Feb 20187:00 amRNSJubilee progresses Kabwe Project
5th Feb 20188:56 amRNSTR-1: notification of major holdings
1st Feb 201811:00 amRNSJubilee Live Interactive Webcast
30th Jan 20181:45 pmRNSQuarterly Operations Update
30th Jan 20188:00 amRNSTR-1: notification of major holdings
29th Jan 20184:48 pmRNSHolding(s) in Company
15th Jan 20181:00 pmRNSJubilee Acquires Significant Equity Position - BMR
9th Jan 20188:45 amRNSJubilee Secures Institutional Financing
5th Jan 20182:45 pmRNSJubilee Hernic PGM Project
5th Dec 20172:30 pmRNSChange of name to Jubilee Metals Group PLC
4th Dec 20173:10 pmRNSResults of AGM and Change of Name
20th Nov 20177:00 amRNSHernic Operations Update for October 2017
10th Nov 20177:00 amRNSNotice of AGM & Audited results for the year
26th Oct 20177:00 amRNSQuarterly Operations Update
23rd Oct 20177:00 amRNSJoint venture with BMR Group PLC
28th Sep 20177:00 amRNSHernic Update
7th Sep 20171:01 pmRNSJubilee Live Interactive Webcast - replacement
7th Sep 201710:15 amRNSJubilee Live Interactive Webcast
5th Sep 201712:30 pmRNSNew Partnership Agreement, 3rd Party Ore Agreement
31st Jul 201711:52 amRNSPlatinum Projects Quarterly Update - Q2 2017
22nd Jun 20173:00 pmRNSDirector Dealing
15th Jun 20171:30 pmRNSHernic Project Reaches Full Production
19th May 201710:30 amRNSHernic Project Ramping-Up and Live Webcast
9th May 20179:00 amRNSMarket Update
30th Mar 20173:18 pmRNSInterim Results - replacement
30th Mar 201712:15 pmRNSInterim Results
29th Mar 20172:15 pmRNSJubilee commences platinum production
17th Mar 20177:00 amRNSExecution of Platinum Tailings Agreement
14th Mar 20171:15 pmRNSFinal proceeds from Middelburg and DCM update
9th Mar 20177:00 amRNSJubilee Executes Surface Tailings Transaction
6th Mar 20179:45 amRNSDCM Operations update and Exercise of warrants
2nd Mar 20178:30 amRNSTjate Executes Mining Right
21st Feb 20173:15 pmRNSExercise of last warrants at specific issue price
15th Feb 20173:31 pmRNSExercise of Last Warrants at Specific Issue Price
13th Feb 201711:45 amRNSExercise of Warrants
8th Feb 20178:45 amRNSExercise of Warrants
6th Feb 20172:45 pmRNSHernic Project in Production
3rd Feb 20179:30 amRNSExercise of Warrants
30th Jan 20179:00 amRNSHernic Tailings Project update
25th Jan 20172:00 pmRNSExercise of Warrants

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.