focusIR May 2024 Investor Webinar: Blue Whale, Kavango, Taseko Mines & CQS Natural Resources. Catch up with the webinar here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksItm Power Regulatory News (ITM)

Share Price Information for Itm Power (ITM)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 54.00
Bid: 53.70
Ask: 53.95
Change: 0.30 (0.56%)
Spread: 0.25 (0.466%)
Open: 55.95
High: 55.95
Low: 52.75
Prev. Close: 53.70
ITM Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Award of Contract from NextEnergy

18 Mar 2011 07:21

RNS Number : 2000D
ITM Power PLC
18 March 2011
 



18 March 2011

 

ITM Power plc

("ITM Power" or "the Company")

 

Award of Contract from NextEnergy

 

Economic and market analysis of the potential impact of a 70 MPa small-scale hydrogen fuelling appliance

 

ITM Power, the energy storage and clean fuel company, is pleased to announce that, having successfully completed the design phase for a hydrogen home refuelling appliance, it has been awarded further a US$30,000 contract by the NextEnergy Center of Detroit ("NextEnergy", a US business accelerator for alternative and renewable energy) to complete an economic and market analysis of the potential impact of a 70 MPa (700 bar) small scale hydrogen fuelling appliance ("SHFA")with particular reference to European and Asian markets. The report will be delivered in April 2011.

 

The purpose of the work is to assist NextEnergy in its evaluation of the world-wide market with a special focus on current and projected European, Asian and Australian markets and sub-markets. The study will include an understanding of the interrelationship between the current and projected hydrogen fuelling infrastructure, volume sensitivity analysis, target demographics and price points, socio-political, regulatory and governmental conditions, carbon fuel cost comparisons and alternative use analysis.

 

Dr. Graham Cooley, CEO of ITM Power commented; "This contract recognises that ITM Power is best placed to provide the vital information required by the global automotive OEMs in order for them to plan the development and roll-out of hydrogen refuelling infrastructure and fuel cell vehicles. This represents an ideal opportunity for the Company to continue the working relationship with the NextEnergy Center that developed during the design phase of this long term project."

 

Kelly Jezierski, Manager, Alternative Fuel Based Energy Programs commented; "We are pleased to be progressing to the next phase of the project with ITM Power. This study will be used as the basis for moving to the prototype stage of the project and as the basis of our future funding applications both to the DoE and other funding bodies."

 

For further information please visit www.itm-power.com or contact:

 

ITM Power plc

Graham Cooley, CEO

 

0114 244 5111

Nomura Code Securities Limited

Juliet Thompson / Dr Christopher Golden

www.nomuracode.com

020 7776 1200

 

Tavistock Communications

Simon Hudson / Andrew Dunn

020 7920 3150

 

 

 

 

 

 

Notes to Editors

 

NextEnergy is a non-profit organization, founded in 2002 with assistance from the Michigan Economic Development Corporation (MEDC). Its initial charge was to implement an economic development strategy for the State of Michigan to accelerate research, development and manufacturing of Alternative Energy Technologies (AET) to advance the AET industry in Michigan. NextEnergy is now one of the USA's leading research catalysts and business accelerators for alternative and renewable energy.

 

http://www.nextenergy.org

 

Since early 2007, NextEnergy has hosted the Fueling Specification for 70 MPa Compressed Hydrogen Vehicles on its website. In addition to providing the document for public review, NextEnergy managed the process of collecting, reviewing and editing content based on public comments regarding this specification. A Steering Committee provided technical oversight for the Fueling Specification. The Steering Committee consisted of NextEnergy and the following OEMs: General Motors, Ford Motor Company, DaimlerChrysler, Toyota, Nissan, Hyundai-Kia Motors and Volkswagen, as well as Air Liquide and Linde.

 

NextEnergy's role is to support the US DOE "Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project" in the greater Detroit area; to integrate, within a core urban environment, critical hydrogen infrastructure components and systems for multi-use operations; to optimize integrated, system-based solutions to advance hydrogen infrastructure for vehicular and stationary distributed power generation use; and to provide a flexible "test" platform to advance the development and validation of commercial-type on-site generation technologies.

 

 

ITM Power designs and manufactures Hydrogen Energy Systems for Energy Storage and Clean Fuel production.

 

ITM Power is committed to clean sustainable energy solutions based around water electrolysis. Our principal motivation is to engineer zero-carbon hydrogen energy systems that provide energy security and independence from fossil fuels.

 

ITM Power's electrolyser and fuel cell technologies have the potential to become the cornerstones of a future hydrogen economy based on 'green' hydrogen. Our hydrogen systems are able to convert renewable energy to a clean fuel that can be indefinitely stored for use in transport, residential and industrial applications.

 

ITM Power has grown from its original platform of novel polymeric electrolytes (for water electrolysis and hydrogen fuel cells) to that of a technology provider. ITM Power now has both a strong base of intellectual property and engineering expertise for providing complete hydrogen solutions.

 

-ends-

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
CNTGRGDXGDBBGBI
Date   Source Headline
15th May 20244:43 pmRNSDirector/PDMR Shareholding
8th May 20246:00 pmRNSTotal Voting Rights
26th Apr 20247:00 amRNSPartnership with Hygen for industry growth
16th Apr 20241:32 pmRNSDirector/PDMR Shareholding
15th Mar 20244:00 pmRNSDirector/PDMR Shareholding
16th Feb 20244:00 pmRNSDirector/PDMR Shareholding
5th Feb 20244:00 pmRNSBlock listing Interim Review
31st Jan 20247:00 amRNSInterim Results
16th Jan 20244:00 pmRNSDirector/PDMR Shareholding
15th Jan 20247:00 amRNSNotice of Interim Results and Presentation
15th Dec 20234:00 pmRNSDirector/PDMR Shareholding
11th Dec 20237:00 amRNS100MW Capacity Reservation
4th Dec 20237:00 amRNSTrading Update
15th Nov 20234:00 pmRNSDirector/PDMR Shareholding
8th Nov 20237:00 amRNSLaunch of Hybrid Stack
30th Oct 20237:00 amRNSGrants under Long Term Incentive Plan
20th Oct 20237:00 amRNSITM announces completed sale of Motive Fuels Ltd
16th Oct 20237:00 amRNSEntry into the US market
13th Oct 20234:00 pmRNSDirector/PDMR Shareholding
19th Sep 20237:00 amRNSDirector/PDMR Shareholding
15th Sep 20234:00 pmRNSDirector/PDMR Shareholding
11th Sep 20234:30 pmRNSTotal Voting Rights
11th Sep 20234:30 pmRNSBlock listing Interim Review
1st Sep 20237:00 amRNSNotice of Annual General Meeting and Annual Report
17th Aug 20237:01 amRNSITM Power releases POSEIDON 20MW module
17th Aug 20237:00 amRNSITM Power PLC: Final Results
15th Aug 20234:00 pmRNSDirector/PDMR Shareholding
14th Aug 20237:00 amRNSHeads of Terms for sale of Motive Fuels Ltd
26th Jul 20237:00 amRNSRoadmap for strategic collaboration with Gore
25th Jul 20237:00 amRNSUpdate on timing of FY23 results announcement
17th Jul 202311:00 amRNSITM Power contract award towards 100MW project
17th Jul 20239:46 amRNSDirector/PDMR Shareholding
10th Jul 20237:00 amRNSITM Power Expands in Germany
3rd Jul 20237:00 amRNSStrategic collaboration with Mott Corporation
30th Jun 20237:00 amRNSUKCA Accreditation Received
15th Jun 20234:00 pmRNSDirector/PDMR Shareholding
14th Jun 20234:00 pmRNSHolding(s) in Company
1st Jun 20237:00 amRNSTrading Update
16th May 20234:00 pmRNSDirector/PDMR Shareholding
17th Apr 20234:00 pmRNSDirector/PDMR Shareholding
3rd Apr 20237:00 amRNSAdditional facilities at Bessemer Park
24th Mar 202312:33 pmRNSDirector/PDMR Shareholding
16th Mar 20234:00 pmRNSDirector/PDMR Shareholding
14th Mar 20237:00 amRNSExpanding test capacity
16th Feb 20235:00 pmRNSDirector/PDMR Shareholding
14th Feb 20237:00 amRNSLTIP Grant
3rd Feb 20236:00 pmRNSBlock listing Interim Review
31st Jan 20237:00 amRNSInterim Results and Strategic Update
23rd Jan 20237:00 amRNSNotice of Interim Results
17th Jan 20234:00 pmRNSDirector/PDMR Shareholding

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.