Cobus Loots, CEO of Pan African Resources, on delivering sector-leading returns for shareholders. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksHummingbird Regulatory News (HUM)

Share Price Information for Hummingbird (HUM)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 10.00
Bid: 9.50
Ask: 10.00
Change: 0.00 (0.00%)
Spread: 0.50 (5.263%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 10.00
HUM Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

PFS for Hydro-Electric Power Plant, Liberia

31 Aug 2016 07:00

RNS Number : 4597I
Hummingbird Resources PLC
31 August 2016
 

Hummingbird Resources plc / Ticker: HUM / Index: AIM / Sector: Mining

31 August 2016

Hummingbird Resources plc ("Hummingbird Resources" or "the Company")

Results of PFS for Hydro-Electric Power Plant in Liberia

 

Hummingbird Resources, is pleased to announce the final results of a 14 month hydro-electric power ("HEP") Pre-Feasibility Study ("PFS") in the proximity of Hummingbird's 4.2Moz Dugbe Gold Project ("Dugbe" or "the Project"). The PFS, which was funded by IFC InfraVentures and carried out by Knight Piésold, confirms the potential viability of a range of options for HEP plants with the ability to supply a sustainable source of power for Dugbe, as well as the southeast Liberian region. Importantly, the HEP plant also offers the potential to reduce the all in sustaining costs ("AISC") of the Dugbe Gold Project.

 

Highlights:

· Five alternative solutions from 10-30MW of hydro-electric power

· Capex ranges from US$51.5-143.5m dependent on size of option selected

· Offers a hydro-electric power solution for the Dugbe Gold Project, with potentially materially positive cost and environmental benefits

 

Dan Betts, CEO of Hummingbird Resources, said:

"As the largest gold deposit in Liberia, with a US$186m NPV at a US$1,300 gold price, we are obviously keen to move the Project forward towards development and the delivery of the hydro power PFS is a tangible deliverable in this process. The PFS, which has been fully funded by IFC InfraVentures, has assessed the various options for a hydro-electric power plant 10km from our Dugbe Gold Project, which could provide significant savings to our overall power cost for Dugbe, but also has the potential to provide surplus power to the local region.

 

"Power costs make up over a third of our total process Opex at Dugbe and finding savings in this area will have positive implications to the Project's economics. We had been using an estimate of US$0.28c/kW for rented diesel power in the PFS. Taking the total Capex and Opex for the HEP plant, over the current 20 year mine life, gives you a theoretical cost of US$0.05c/kWh. This number does not compare directly, since it does not include the impact of the financing cost of building the hydro plant as it is not yet known how this will be done or by whom. However, assuming a suitable financing solution was found, this could have a materially positive impact on the economics of the Dugbe Gold Project. Therefore, we are now considering our next steps with our partners on the PFS."

 

Further Information

 

In Q2 2015 a Collaboration Agreement was signed for the funding and development of a hydro-electric power plant approximately 10km from Hummingbird's 4.2 million ounce Dugbe Gold Project. The Collaboration Agreement was signed between Hummingbird and IFC InfraVentures, the IFC Global Infrastructure Project Development Fund, and Aldwych International, a leading energy company active in the growing economies of Africa.

 

Knight Piésold (Vancouver), a leading engineering and consulting company, recently completed its fifth and final scheduled site visit in order to assess and take readings from the run-of-river flow rate monitors that were set up at the start of the 12 month monitoring programme.

 

Knight Piésold has assessed a range of hydropower options, including:

 

DESCRIPTION

UNIT

OPTION 1

OPTION 2

OPTION 3

OPTION 4

OPTION 5

Gross Head

M

46

46

46

46

25

Design Flow

m3/s

82

68

54

41

48

Installed Capacity

MW

30

25

20

15

10

Intakes & Canals

No.

3

Dugbe, Botou & Geebo

2

Dugbe & Botou

1

Dugbe

1

Dugbe

1

Dugbe (No Canal)

Capacity Factor

%

54

51

48

55

54

Mean Annual Energy

GWh

141.2

111.7

83.2

72.9

47.7

Capital Cost Estimate (with Concrete Canal)

US$M

143.5

115.3

88.3

78.7

51.5

Annual Operating Cost Estimate

(US$m)

0.4

0.4

0.4

0.4

0.4

 

Spreading the capital and operating cost for each option, over 20 years, the cost of a unit of power is between US$0.05-0.06c/kWh. However, this does not include the cost of the debt and equity required to finance the building of the plant, which will add to the figure. In comparison, the current power plan is based on a rented diesel power estimate of approximately US$0.28/kW and was calculated when world oil prices were significantly higher than they are currently. Of the US$903/oz AISC in the Company's 2013 Scoping Study, in excess of 30 per cent is the cost of rented diesel power.

 

There is also precedent for the potential reduction of capital costs by changing the canal from a concrete lined structure to an earth lined canal with larger cross sectional area and flatter side slopes. Depending on geotechnical conditions, unlined earth canals could be a viable option that could result in significant cost savings, but they will likely require more annual maintenance, adding to the operational costs.

 

To view a map of the watershed catchment areas please click on the following link:

 

http://www.rns-pdf.londonstockexchange.com/rns/4597I_-2016-8-30.pdf

 

About Knight Piésold

Knight Piésold has been in the hydropower business for over 80 years with extensive experience in large and small hydroelectric projects throughout the world. Its experience includes water storage projects, run-of-river projects and pumped storage projects. Knight Piésold provides a "one-stop-shop" for hydropower development, from resource identification and evaluation, financial services, environmental impact assessments and permitting, through to project management, site investigations, detailed engineering design, site supervision, O&M staffing and training, commissioning, and asset management. The improvement of existing units and facilities through power facility additions at existing dams, replacement of aging or low efficient equipment, and equipment upgrades or improvements, are also key elements of Knight Piesold's hydropower practice. Past projects include the 235MW East Toba and Montrose Projects and 150MW Kwalsa and Upper Stave Hydroelectric Projects in Canada, the 1,333MW Ingula Pumped Storage Scheme in South Africa, the 247MW Kalungwishi Hydroelectric Project in Zambia, and the 150MW Casecnan Multi-Purpose Hydroelectric Project.

 

Dugbe - Liberia

The Dugbe Gold Project is located within the Birimian Basin, the world's second largest gold producing region, characterised by exceptionally large, homogenous grade deposits which offer vast exploration and development scope. With a current Resource of 4.2 million ounces of gold at an average gold grade of 1.4 g/t, Dugbe offers a large-scale development opportunity for Hummingbird. The Company completed a Preliminary Economic Assessment ("PEA") in April 2013 which demonstrated the viable economics of developing a 20 year gold mining project with initial gold production of 125,000 ounces, an NPV of US$186 million, IRR of 29% using a US$1,300 gold price. Hummingbird signed a Mineral Development Agreement with the Government of Liberia in July 2015, giving the Company security of tenure and right to mine for at least the next 25 years. Hummingbird is continuing to advance Dugbe and is progressing Definitive Feasibility Study optimisation work evaluating the large 4.2Moz gold resource, mining, processing and power capabilities with a view to future production viability.

 

This announcement contains inside information for the purposes of Article 7 of Regulation 596/2014.

 

**ENDS**

 

For further information please visit www.hummingbirdresources.co.uk or contact: 

 

Daniel Betts

Thomas Hill

Robert Monro

Hummingbird Resources plc

Tel: +44 (0) 203 416 3560

Charlie Cryer

Oliver Morse

 

 

RFC Ambrian Ltd

Nominated Adviser and Joint Broker

Tel: +44 (0) 203 440 6800 / +61 (0) 9480 2500

 

Jon Belliss

Beaufort Securities Limited

Joint Broker

Tel: +44 (0) 20 7382 8300

Lottie Brocklehurst

Susie Geliher

Hugo de Salis

St Brides Partners Ltd

Financial PR/IR

Tel: +44 (0) 20 7236 1177

 

About Hummingbird Resources Plc

 

Notes to Editors

Hummingbird Resources (AIM: HUM) is building a leading gold production, development and exploration company. The Company has two core gold projects, the near-term production Yanfolila Gold Project in Mali and the Dugbe Gold Project in Liberia. It is currently building Yanfolila targeting first production by end of 2017, which has a Probable Reserve of 709,800oz @ 3.14g/t and total Resources of 1.8Moz of gold and an additional 390,700oz of non-compliant exploration potential. The high grade gold project has low operating costs of US$695/oz AISC with 132,000ozs of first full year's production.

 

The 4.2Moz Dugbe Gold Project in Liberia provides Hummingbird with excellent development upside. An optimisation of the DFS is on-going whilst Yanfolila is brought to production in the near-term. Additionally, the Company has 4,000km2 highly prospective exploration ground in Mali and Liberia and is constantly evaluating new quality assets.

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCEASPEDEPKEFF
Date   Source Headline
15th Nov 20167:00 amRNSConstruction Update at Yanfolila Gold Project
14th Nov 20167:00 amRNSHolding(s) in Company
25th Oct 20167:00 amRNSChange of Adviser
20th Oct 20167:00 amRNSFirst Concrete Poured at Yanfolila Gold Project
11th Oct 20167:00 amRNSCommences Construction at Yanfolila Gold Project
30th Sep 20167:00 amRNSInterim Results
29th Sep 20164:50 pmRNSHolding(s) in Company
28th Sep 20169:30 amRNSHolding(s) in Company
19th Sep 20164:40 pmRNSSecond Price Monitoring Extn
19th Sep 20164:35 pmRNSSecond Price Monitoring Extn
19th Sep 20162:00 pmRNSSecond Price Monitoring Extn
19th Sep 201611:00 amRNSPrice Monitoring Extension
12th Sep 20167:05 amRNSBlock Listing Six Monthly Return
12th Sep 20167:00 amRNSAppointment of Civil Contractor
8th Sep 20167:00 amRNSTaurus Bridge Extension
31st Aug 20167:00 amRNSPFS for Hydro-Electric Power Plant, Liberia
16th Aug 201611:55 amRNSHolding(s) in Company
12th Aug 20167:00 amRNSPrivate Placement to Raise US$4 million
11th Aug 201610:01 amRNSHolding(s) in Company
12th Jul 201611:00 amRNSNew Corporate Presentation
6th Jul 20167:00 amRNSAppoints SENET & Project Manager for Construction
29th Jun 20167:00 amRNSDoubles Mali Exploration Exposure - Kola Gold MoU
23rd Jun 20163:00 pmRNSHolding(s) in Company
23rd Jun 20169:20 amRNSHolding(s) in Company
22nd Jun 201612:30 pmRNSHolding(s) in Company
22nd Jun 201612:30 pmRNSHolding(s) in Company
21st Jun 201612:00 pmRNSHolding(s) in Company
20th Jun 20162:45 pmRNSResult of GM, TVR and Fundraising of £50 million
14th Jun 20167:00 amRNSExtension of Deadline for Overallotment Option
2nd Jun 20163:25 pmRNSRaises $67M to commence full-scale construction
11th May 201612:30 pmRNSResult of AGM
18th Apr 20161:25 pmRNSHolding(s) in Company
15th Apr 20162:45 pmRNSPosting of Annual Report & Notice of AGM
14th Apr 20167:00 amRNSFinal Results
11th Mar 20167:00 amRNSBlock Listing Six Monthly Return
9th Mar 20168:30 amRNSNew Corporate Presentation
29th Feb 20167:00 amRNSOptimised Mine Schedule Enhances Economics
25th Feb 20167:00 amRNSTaurus Bridge Extension
3rd Feb 20164:35 pmRNSPrice Monitoring Extension
2nd Feb 20167:00 amRNSStudy on Gonka Deposit and Taurus Extension
18th Jan 20167:00 amRNSYanfolila DFS Significantly Increases NPV & IRR
15th Dec 20157:00 amRNSMaiden Reserves at Yanfolila and Project Update
20th Nov 201511:56 amRNSHolding(s) in Company
19th Oct 20157:00 amRNSWarrant Exercise and Total Voting Rights
29th Sep 20157:01 amRNSChange of Adviser
22nd Sep 20157:00 amRNSInterim Results
16th Sep 20157:00 amRNSPositive Preliminary Assessment of HEP in Liberia
11th Sep 20157:00 amRNSBlock Listing Six Monthly Return
7th Sep 20159:00 amRNSWarrant Exercise & Total Voting Rights
1st Sep 20157:03 amRNSUS$5M Bridge Extension & Earthworks Completed

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.