Less Ads, More Data, More Tools Register for FREE

Pin to quick picksNighthawk Energy Regulatory News (HAWK)

  • There is currently no data for HAWK

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Jolly Ranch Reservoir Simulation Study

24 Jan 2011 07:00

RNS Number : 9233Z
Nighthawk Energy plc
24 January 2011
 



Monday 24 January 2011

 

NIGHTHAWK ENERGY PLC

("Nighthawk" or "the Company")

Jolly Ranch Reservoir Simulation Study

Study results in significant increase in model area oil in place estimates

Nighthawk, the US focused oil development and production company (AIM: HAWK and OTCQX: NHEGY), announces the completion of the Schlumberger Data and Consulting Services ("SDCS") Eclipseä reservoir simulation study and commencement by Gaffney, Cline and Associates (Houston) ("GCA") of the first reserves and contingent resources study on the Jolly Ranch Area.

Highlights

·; Completion of Eclipseä reservoir simulation model

·; Oil in place per acre in the target Cherokee and Atoka shale formations within the simulation study area approximately 14 times higher than previous oil in place estimates

·; Gaffney Cline and Associates commencing Reserves and Contingent Resource Report

Simulation Study

The completed reservoir simulation model was constructed to generate the likely long-term production behaviour of the Marmaton, Cherokee and Atoka horizons. For ease of modelling the three horizons of interest were split into seven fluids in-place sub-zones, as indicated in the table below. The Shale model sub-zone in the table refers to the more shale-prone areas of the mid-Cherokee horizon, whereas the Tebo and Cherokee model sub-zones refer to the more interbedded carbonate and dolomite dominated zones within the Cherokee shale package.

The model consisted of detailed areas of the Craig Ranch and Jolly Ranch project areas, totalling approximately 3,200 gross surface acres. The model comprised 1.9 million cells forming a simulation grid with current rock and fluid properties, well completion and pressure data.

Simulation Study Conclusions

Part of the scope of work was to reassess the Original Oil In Place ("OOIP") within the Cherokee and Atoka shale horizons, as well as the conventional Marmaton horizon within the study area. In addition, the water saturation levels within these zones, as tabulated below, were determined.

A recovery rate was assessed on the basis of a number of prediction scenarios with various well and economic parameters and cut offs. The recovery rate, as predicted by the simulation runs, is presented for each of the horizons below for the modelled area and is based on vertical wells on 40-acre well spacing.

Interval

OOIP

(Barrel per Acre)

Water:Oil (BBL)

Recovery Rate (% of OOIP)

Marmaton

2,344

17.4:1

0%

Marmaton B

2,969

4.7:1

0%

Cherokee

5,625

1.7:1

4.9%

Shale

3,281

4.5:1

2.6%

Tebo

5,313

7.4:1

17.3%

Upper/Lower Atoka

7,656

8.0:1

10.1%

Lower Atoka /Morrow

7,969

5.5:1

7.4%

Average Model Area

7.5%

 

Within the model the Marmaton conventional horizons are shown to have a zero recovery rate. This is driven by the water and oil production cut offs set in the model to reduce the length of time to converge each analysis.

The Jolly 10-5 well continues to produce around 7 bopd from the Marmaton in association with a large volume of formation water. The Marmaton is oil bearing as demonstrated in the table, but remains very much a secondary target to the shales.

Comparison with 2009 Original Oil in Place Report

The OOIP utilised in the simulation is an update figure on the work undertaken by Schlumberger in July 2009. Whilst the 2009 study had a wide area of focus of approximately 246,000 gross acres and attributed approximately 1.4 billion barrels of gross oil in place, the recent work has focused on a more detailed zone of approximately 3,200 gross acres around the Jolly Ranch and Craig Ranch areas where almost all of the drilling and production activity is concentrated.

However, as previously reported, there is good confidence in the continuity and uniform nature of the shale horizons across the wider project area and therefore there is confidence that the overall OOIP will have risen too.

Interval

OOIP (Barrels per Acre)

July 2009

January 2011

Total Cherokee (including Shale and Tebo)

638

14,219

Total Atoka

1,515

15,625

Total Marmaton

3,726

5,313

Total

5,879

35,157

 

Additional Work Scope

Given the significant increase in oil in place within the targeted shale horizons, Nighthawk has commissioned Schlumberger to undertake further field development scenarios. This will include variable well spacing as well as design and analysis of an optimal fraccing method for possible implementation in the field.

Reserves and Resources Study

The Eclipse model has been passed to GCA to undertake the reserves study, the conclusions of which will be announced when completed.

Tim Heeley, CEO of Nighthawk, commented:

"Whilst we are still in the early stages of developing the Jolly Ranch project, it is encouraging to see a significant increase in oil in place within the objective shale horizons.

"The simulation study further underlines the potential of Jolly Ranch; however, operational work remains to be undertaken in order to demonstrate that oil can be economically and consistently recovered from the field.

"The outcome of this study reinforces the conclusions of the recent Strategic Review and we look forward to updating the market on the Gaffney Cline study in due course."

 

Tim Heeley B.Eng (Hons) a member of the Society of Petroleum Engineers, Fellow of the Geological Society of London and a Chartered Energy Engineer, who is CEO of Nighthawk and has over 14 years of experience in the hydrocarbons industry, has approved the technical information contained in this announcement.

 

Enquiries:

Nighthawk Energy plc

Tim Heeley, Chief Executive

Mike Thomsen, Executive Chairman

 

020 3405 1982

+1 720 344 5154

Westhouse Securities Limited

Tim Feather

Matthew Johnson

020 7601 6100

tim.feather@westhousesecurities.com

matthew.johnson@westhousesecurities.com

Matrix Corporate Capital LLP

Louis Castro

James Pope

020 3206 7000

louis.castro@matrixgroup.co.uk

james.pope@matrixgroup.co.uk

Financial Dynamics

Ben Brewerton

Ed Westropp

020 7831 3113

ben.brewerton@fd.com

edward.westropp@fd.com

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCPGURPGUPGGMG
Date   Source Headline
7th Oct 20147:00 amRNSDirectors Dealings and Issue of Equity
6th Oct 20147:00 amRNSAppointment of Joint Broker
3rd Oct 20149:56 amRNSAmendment to Articles and Notice of GM
2nd Oct 20143:54 pmRNSShare Awards and Restricted Stock Scheme
29th Sep 20147:01 amRNSInterim Results
29th Sep 20147:00 amRNSFinancing Update
26th Sep 20147:00 amRNSProduction and Drilling Update
23rd Sep 20147:00 amRNSAppointment of Executive Chairman
21st Aug 20147:01 amRNSProduction and Development Update
21st Aug 20147:00 amRNSNew US$100 million Debt Facility
12th Aug 20147:00 amRNSConversion of Loan Notes and Total Voting Rights
17th Jul 20147:00 amRNSDrilling and Production Update
11th Jun 20147:00 amRNSDrilling and Production Update
2nd Jun 20141:11 pmRNSResult of AGM
21st May 20143:29 pmRNSMedia Speculation
9th May 20141:27 pmRNSAnnual Report and Accounts & Notice of AGM
9th May 20147:00 amRNSDrilling and Production Update
28th Apr 20147:00 amRNSConversion of Loan Notes and Total Voting Rights
17th Apr 20147:00 amRNSDrilling and Production Update
31st Mar 20147:00 amRNSDirectorate Changes
28th Mar 20147:01 amRNSPreliminary Results
10th Mar 20147:00 amRNSProduction and Operational Update
28th Feb 201410:14 amRNSTotal Voting Rights
18th Feb 201412:54 pmRNSIssue of Equity
14th Feb 20147:00 amRNSDrilling and Production Update
17th Jan 20147:00 amRNSDrilling Update
6th Jan 20141:13 pmRNSDirector/PDMR Shareholding
6th Jan 20147:00 amRNSDrilling and Production Update
3rd Jan 20142:34 pmRNSConversion of Loan Notes and Total Voting Rights
27th Dec 20134:35 pmRNSPrice Monitoring Extension
11th Dec 20136:06 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
11th Dec 20137:00 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
9th Dec 20137:00 amRNSDirector/PDMR Shareholding
6th Dec 20137:00 amRNSDrilling and Production Update
2nd Dec 20137:00 amRNSTotal Voting Rights
21st Nov 20137:00 amRNSCapital Reduction Effective
8th Nov 201310:12 amRNSExercise of Warrants and Total Voting Rights
1st Nov 201310:15 amRNSTotal Voting Rights
29th Oct 20137:00 amRNSFarm-Out Agreement
18th Oct 201311:38 amRNSResult of General Meeting
16th Oct 20137:00 amRNSDrilling Update
9th Oct 20131:24 pmRNSExercise of options
8th Oct 20137:00 amRNSProduction Update
2nd Oct 20137:00 amRNSPosting of Circular
1st Oct 20137:00 amRNSIssue of Equity and Total Voting Rights
25th Sep 20137:00 amRNSInterim Results
13th Sep 20137:00 amRNSProduction and Drilling Update
2nd Sep 20137:00 amRNSTotal Voting Rights
22nd Aug 20137:00 amRNSConversion of Loan Notes
13th Aug 20137:00 amRNSCompany Presentation

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.